Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2015-03-09 General Committee Agenda

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   9 MARCH 2015




                                   Page 13 of 70

Budget Review 3 - Summary of Requests by Department
                       Capital
Proposed Variance
Renewal/Upgrade        ae eu                                ero Ae ule Ameo  aa                                              Pee                                                        etary                  Revenue          Grand Total
                        Bridges                               Girraween Bridget Joint Replacement                            Girraween Bridge Joint Replacement - Renewal                      $50,000                              $50,000
                       Bridges Total                                                                                                                                                           $50,000                              $50,000
                        Coastal Canals and Waterways          Munna Point Foreshore Stabilisation                            Additional Geofabric Groyne - Increase                            $45,000                              $45,000
                                                              Sunshine Beach - beach access 35                               Sunshine Beach - beach access 35 - Completed                      -$29,304                             -$29,304
                                                               Teewah Beach - southern dunal restore                         Teewah Beach - southern dunal restore - Completed                  -$5,344                              -$5,344
                      Coastal Canals and Waterways Total                                                                                                                                       $10,353                              $10,353
                         Community Facilities                  NAC learn to swim pool — replacement pool cover               NAC learn to swim pool — replacement pool cover -                 $18,000                              $18,000
                                                                                                                             Renewal
                                                               Noosa Aquatic Centre - pool cleaner                           Noosa Aquatic Centre - pool cleaner - Completed                        $o                                    so
                                                               Noosa Aquatic Centre 50m Pool Blanket Winch                   Noosa Aquatic Centre 50m Pool Blanket Winch -                       $1,747                               $1,747
                                                                                                                             Completed
                                                               Noosa Leisure Centre - concertina door                        Noosa Leisure Centre - concertina door - Completed                -$25,000                             -$25,000
                                                               Noosa Leisure Centre — design and detail                      Noosa Leisure Centre — design and detail - Offset                      $o                                    $o
                                                              Noosa Leisure Centre -upstairs flooring                        Noosa Leisure Centre -upstairs flooring - Offset                  -$60,000                             -$60,000
                                                               Noosa River Holiday Pk- Internal refurb                       Noosa River Holiday Pk- Internal refurb - Deferred                -$60,000                             -$60,000
                                                               Sunshine Beach Skate Park - block wall                        Sunshine Beach Skate Park - block wall - Completed                  $3,999                               $3,999
                                                              Tewantin Spray Park Shade Sail                                 Tewantin Spray Park Shade Sail - Completed                          $1,210                               $1,210
                                                               Whole of Shire - community light poles                        Whole of Shire - community light poles - Reduction                -$80,000                             -$80,000
                      Community Facilities Total                                                                                                                                            -$200,044                             -$200,044
                          Environmental Assets                 Cudgerie - Cedar Gully Pk water feature                       Cudgerie - Cedar Gully Pk water feature - Completed               $27,332                              $27,332
                       Environmental Assets Total                                                                                                                                              $27,332                              $27,332
                          Holiday Parks                        Boreen Point Campground - wastewater                          Boreen Point Campground - wastewater - Completed                    $4,201                               $4,201
                                                               Boreen Point Tennis Courts Renewal Stage |                    Boreen Point Tennis Courts Renewal Stage | - Deferred             -$20,166                             -$20,166
                                                              RV Stopover Cooroy                                             RV Stopover Cooroy - New                                          $45,000                              $45,000
                       Holiday Parks Total                                                                                                                                                     $29,036                              $29,036
                          Information Technology               Whole of Shire - corporate website                            Whole of Shire - corporate website - No Budget                  ~$112,760                             -$112,760
                                                                                                                             Required
                       Information Technology Total                                                                                                                                          -$112,760                             -$112,760
                          Parks & Playgrounds                  Peregian Beach - Victory Park table                           Peregian Beach - Victory Park table - Completed                      -$300                                -$300
                                                               Peregian Beach Pk - 3 phase switchboard                       Peregian Beach Pk - 3 phase switchboard - Completed                  -$367                                -$367

                                                                                                                                                   Page 13 of 70
Log in to download the original file

2015-03-09 General Committee Agenda(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.