Original source · versioned page text
DA Form 2 - Building work details.pdf
• required by other legislation (including the Right to Information Act 2009); or
• otherwise required by law.
This information may be stored in relevant databases. The information collected will be retained as required by the
Public Records Act 2002.
PART 7 – FOR COMPLETION BY THE ASSESSMENT MANAGER – FOR OFFICE
USE ONLY
Date received: Reference numbers:
For completion by the building certifier
Classification(s) of approved building work
Name QBCC Certification Licence QBCC Insurance receipt
number number
Notification of engagement of alternative assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
Additional information required by the local government
Confirm proposed construction materials:
Double brick Steel Curtain glass
External walls Brick veneer Timber Aluminium
Stone/concrete Fibre cement Other
Timber Steel Aluminium
Frame
Other
Floor Concrete Timber Other
Slate/concrete Tiles Fibre cement
Roof covering
Aluminium Steel Other
QLeave notification and payment
Note: For completion by assessment manager if applicable
Description of the work
QLeave project number
Amount paid ($) Date paid (dd/mm/yy)
Date receipted form sighted by assessment manager
Name of officer who sighted the form
Additional building details required for the Australian Bureau of Statistics
Existing building use/classification? (if applicable)
New building use/classification?
Site area (m2) Floor area (m2)
Page 6
DA Form 2 – Building work details
Version 1.2— 7 February 2020
[OCR of page images]
e required by other legislation (including the Right to Information Act 2009); or
e otherwise required by law.
This information may be stored in relevant databases. The information collected will be retained as required by the
Public Records Act 2002.
PART 7 —- FOR COMPLETION BY THE ASSESSMENT MANAGER -— FOR OFFICE
USE ONLY
Date received: [i Reference numbers: |
For completion by the building certifier
Classification(s) of approved building work
Name QBCC Certification Licence QBCC Insurance receipt
number number
Notification of engagement of alternative assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
Additional information required by the local government
Confirm proposed construction materials:
CJ Double brick U Steel LJ Curtain glass
External walls C1 Brick veneer CJ Timber CD Aluminium
LJ Stone/concrete LJ Fibre cement LJ Other
CL Timber UO Steel CD Aluminium
Frame J Other
Floor CL Concrete CJ Timber CJ Other
. LJ Slate/concrete (Tiles LJ Fibre cement
Roof covering C1 Aluminium C1 Steel CF Other
QLeave notification and payment
Note: For completion by assessment manager if applicable
Description of the work
QLeave project number
Amount paid ($) | Date paid (dd/mm/yy) |
Date receipted form sighted by assessment manager
Name of officer who sighted the form
Additional building details required for the Australian Bureau of Statistics
Existing building use/classification? (if applicable)
New building use/classification?
Site area (m?) | Floor area (m?) |
Page 6
DA Form 2 — Building work details
Version 1.2— 7 February 2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DA Form 2 - Building work details.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.