Council archive · source document
planning report 38 mossman - may 24 · MCU24/0032
Carparking and 2 covered. 3 covered spaces (min.) Y
access
Acid Sulfate Soils Overlay Code - Operational Works – subject to separate assessment
AO1.2 The disturbance of ASS avoids the An ASS investigation and Y – can be
release of acid and metal dewatering plan is attached to conditioned
contaminants by:- the application.
(a) undertaking an ASS
investigation conforming to the
National Acid Sulfate Soils
Guidance;
(b) neutralising existing acidity and
preventing the generation of
acid and metal contaminants
using strategies documented in
the Soil Management
Guidelines; and
(c) preventing the release of
surface or groundwater flows
containing acid and metal
contaminants into the
environment.
AO1.3 Where potential or actual ASS is The recommendations of the Y – can be
identified, they are managed in ASSMP will be incorporated into conditioned
accordance with an ASS the building work. The applicant
management plan. is happy to accept a condition of
approval in this regard.
Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
planning report 38 mossman - may 24.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.