                                                                                      Officer:          Matthew Pinese
                                                                                      Direct Telephone: 07 53296316
                                                                                      Our Reference:    MCU25/0022
                                                                                                        OPW25/0029
                                                                                      Your Reference:   n/a

               27 July 2026


               LDA Robins
               C/- Indecom Solutions Pty Ltd
               590 Bunya Road
               EUMUNDI QLD 4562
               [email protected]



               Dear Adam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 23 July 2026, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU25/0022 and OPW25/0029

                   Street address:              193 Sankeys Road, Federal Qld 4568

                   Real property description:   Lot 6 on RP216727

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for a Material Change of Use - Dwelling house
               •       Development Permit for Operational Works – Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                  PO Box 141
               noosa.qld.gov.au                                                             Tewantin QLD 4565
               [email protected]                                                             07 5329 6500
                                                                                                       Page 1 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026
Full text of the other 11 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

                            DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU25/0022)
               PLANNING
                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.            Rev.   Plan/Document Name                           Date

                        2022026 01 of 09     A     Site Plan prepared by Indecom Solutions      18/02/2025

                        2022026 02 of 09     A     House Site Plan prepared by Indecom 18/02/2025
                                                   Solutions

                        2022026 03 of 09     A     Shed Site Plan prepared by Indecom 18/02/2025
                                                   Solutions

                        2022026 04 of 09     A     Awning/Shelter Site Plan prepared by 18/02/2025
                                                   Indecom Solutions

                        2022026 05 of 09     A     House Site Section A-A prepared by 18/02/2025
                                                   Indecom Solutions

                        2022026 06 of 09     A     Shed Site Section B-B prepared by Indecom 18/02/2025
                                                   Solutions

                        Page No: 1            -    Floor Plan prepared by Frame Steel           16/03/2023

                        Page No: 2            -    Elevations prepared by Frame Steel           16/03/2023

                        Page No: 3            -    Elevations prepared by Frame Steel           16/03/2023

                        -                     -    Building Layout prepared by Best Shed        -

                        -                     -    Internal Layout                              -

                      Building Height
               2.     The maximum height of the development must not exceed 8.0 metres above the finished
                      ground level and the natural ground surface.
               Currency Period
               3.     This development approval lapses if the use has not happened by 23 July 2032, unless an
                      application to extend the currency period is approved by Council.
                      Landscaping
               4.     Existing trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling and shed.
               5.     Existing vegetation in the road reserve must be retained, unless written authorisation from
                      Council is granted for the clearing.




                                                                                                    Page 2 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 3

               6.     Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
                      Storage of Chemical and Hazardous Substances
               7.     Any storage of flammable and/or combustible liquids must comply with the minor storage
                      provisions of Australian Standard AS1940 “The Storage and Handling of Flammable and
                      Combustible Liquids”.
               8.     The storage of chemicals must be within a secure and designated storage area that is safe,
                      well-ventilated, and free from potential ignition sources. The storage of hazardous chemical
                      must comply with the Work Health and Safety Regulation 2011, which outlines specific
                      requirements for safe storage and handling of hazardous chemicals.
                      Bushfire Management
               9.     An accessible dam, swimming pool or water tank (in addition to day-to-day water supply)
                      with an onsite water volume of not less than 5,000 litres must be available for firefighting
                      purposes, located within reasonable proximity to building.
               10.    A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
                      fitting must be connected to the water supply (other than where the water supply is in a
                      swimming pool or dam).
               ENGINEERING
                      Site Access and Driveways
               11.    An access driveway must be provided from the existing formation in Sankeys Road to all
                      parking and manoeuvring areas of the development. The works must be undertaken
                      generally in accordance with the approved plans.
                      Stormwater Drainage
               12.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               13.    Unless otherwise agreed in writing by the relevant service provider, any public or third-party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               14.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               15.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               16.    All development works must be carried out in accordance with the recommendations
                      contained in the Slope Stability Assessment prepared by Civil Quality Assurance Pty Ltd
                      dated 17 July 2023.




                                                                                                      Page 3 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 4

                      Earthworks and Retaining Walls
               17.    All fill and associated batters must be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council. All earthworks must be
                      undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
                      Earthworks for Commercial and Residential Developments.
               18.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               19.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
               20.    Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.




                                                                                                        Page 4 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 5

                              DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0029)
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.              Rev.   Plan/Document Name                             Date

                        2022026 07 of 09       A     Access Driveway Working Plan prepared by 18/02/2025
                                                     Indecom Solutions

                        2022026 08 of 09       A     Access Driveway Cross Sections Sheet 1 of 18/02/2025
                                                     2 prepared by Indecom Solutions

                        2022026 09 of 09       A     Access Driveway Cross Sections Sheet 2 of 18/02/2025
                                                     2 prepared by Indecom Solutions

               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 24 July 2028, unless an application to extend the currency period is
                      approved by Council.
               3.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      The relevant conditions of the higher order Material Change of Use approval ref.
                              MCU24/0123 to which this approval relates.
                      c.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
               SITE SPECIFIC CONDITIONS
                      Bonds
               4.     A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
                      start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
               5.     The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               6.     Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               7.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               8.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.




                                                                                                       Page 5 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 6

               10.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Erosion and sediment control works;
                      c.      Other relevant parties
               11.    A Construction Management Plan must be submitted prior to Council attending the prestart
                      meeting and must address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               12.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               13.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               14.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               15.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               16.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Pavement Design and Construction
               17.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               18.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.


                                                                                                     Page 6 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 7

               19.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               20.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Site Access and Driveways
               21.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-056 and any associated addendum.
               22.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               23.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete OR an approved all-weather purpose material;
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway;
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path; and
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               24.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development.
               25.    Fall protection must be provided to retaining walls that are over 1m high.
               26.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               27.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               28.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               29.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.




                                                                                                        Page 7 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 8

                      Erosion and Sediment Control
               30.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               31.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events; and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               32.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards * (Refer to Advisory Note).
               33.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               34.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               35.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term. For the
                      purpose of this condition, an effectively stabilised surface is defined as one that does not, or
                      is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
                      lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               36.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      c.      Any repair work which proposes to alter the alignment or level of existing services and
                              assets must first be referred to the relevant service authority for approval.




                                                                                                         Page 8 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 9

               FOLLOWING CONSTRUCTION
                      Certification
               37.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               38.    A final inspection and approval of the new driveways and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
                      Prior to commencement of works
               39.    Prior to requesting a prestart meeting:
                      a.      The area of vegetation clearing required 25m downslope of the dwelling in accordance
                              with the Bushfire Attack Level Assessment must be clearly mark out on ground under
                              the supervision of a suitably qualified Bushfire Practitioner.
                      b.      Tree protection flagging must be installed under the supervision of the Project Arborist.
                              (Refer to Vegetation Conditions).
                      c.      Submission of a fauna management plan in accordance with the conditions of this
                              approval.
               40.    A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
                      at least five business days’ notice). The prestart meeting must be attended by the responsible
                      persons for:
                      a.      Bushfire
                      b.      Vegetation removal
                      c.      Fauna Management
                      Vegetation
               41.    Existing trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling. In this regard, the removal of vegetation must not
                      extend beyond the bushfire separation distances stated/detailed within the bushfire report
                      and as follows:
                      a.      Maximum of 25 metres downslope of the dwelling in accordance with the referenced
                              Bushfire Attack Level Assessment.
               42.    Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation where necessary
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
                      Fauna Management
               43.    Vegetation must only be removed or disturbed in accordance with a Fauna Management
                      Plan (or part thereof) prepared by a qualified person* and endorsed prior to any Operational
                      Works prestart meeting.
                      *(Refer to Advisory Note)




                                                                                                         Page 9 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 10

               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                     Date

                008.02.23                0    Bushfire Attack Level Assessment prepared by 21/02/2023
                                              Bushfire Risk Reducers

                -                        -    Slope Stability Assessment prepared by Civil 17/07/2023
                                              Quality Assurance Pty Ltd

                23/8894                  -    Site Classification Report prepared by Civil Quality 19/07/2023
                                              Assurance Pty Ltd

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Qualified Person
               2.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.
                      Private Infrastructure
               3.     All private infrastructure for the development must be designed to meet the planning scheme
                      requirements unless otherwise agreed by the relevant authority
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required               Subject of the required Development Permit

                Development Permit for Building Works             All building work.

               11.    SUBMISSIONS

               Not applicable.




                                                                                                      Page 10 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 11

               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully

               Matthew Pinese
               Development Planner | Development Assessment
               Development & Regulation


               Enc:   Appeal Rights
                      Approved Plans/Documents




                                                                                                    Page 11 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Page 12

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 12 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026

Used in these records

About this file

File size
172 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published).pdf · 172 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.