Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published) · MCU25/0022
6. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Storage of Chemical and Hazardous Substances
7. Any storage of flammable and/or combustible liquids must comply with the minor storage
provisions of Australian Standard AS1940 “The Storage and Handling of Flammable and
Combustible Liquids”.
8. The storage of chemicals must be within a secure and designated storage area that is safe,
well-ventilated, and free from potential ignition sources. The storage of hazardous chemical
must comply with the Work Health and Safety Regulation 2011, which outlines specific
requirements for safe storage and handling of hazardous chemicals.
Bushfire Management
9. An accessible dam, swimming pool or water tank (in addition to day-to-day water supply)
with an onsite water volume of not less than 5,000 litres must be available for firefighting
purposes, located within reasonable proximity to building.
10. A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
fitting must be connected to the water supply (other than where the water supply is in a
swimming pool or dam).
ENGINEERING
Site Access and Driveways
11. An access driveway must be provided from the existing formation in Sankeys Road to all
parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with the approved plans.
Stormwater Drainage
12. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
13. Unless otherwise agreed in writing by the relevant service provider, any public or third-party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
14. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
15. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
16. All development works must be carried out in accordance with the recommendations
contained in the Slope Stability Assessment prepared by Civil Quality Assurance Pty Ltd
dated 17 July 2023.
Page 3 of 12
Document Set ID: 25009930
Version: 4, Version Date: 27/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 172 KB (small file)
- File type
No other editions are linked here.