Council archive · source document
Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published) · MCU25/0022
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0029) 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 2022026 07 of 09 A Access Driveway Working Plan prepared by 18/02/2025 Indecom Solutions 2022026 08 of 09 A Access Driveway Cross Sections Sheet 1 of 18/02/2025 2 prepared by Indecom Solutions 2022026 09 of 09 A Access Driveway Cross Sections Sheet 2 of 18/02/2025 2 prepared by Indecom Solutions 2. The Currency Period for this development approval lapses if the development has not substantially started by 24 July 2028, unless an application to extend the currency period is approved by Council. 3. All works must be constructed and work procedure undertaken in accordance with: a. The approved plans/documents and conditions detailed in this Decision Notice. b. The relevant conditions of the higher order Material Change of Use approval ref. MCU24/0123 to which this approval relates. c. All relevant Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. SITE SPECIFIC CONDITIONS Bonds 4. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre- start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council. 5. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. 6. Bonds must: a. have approval of the bond calculations and amount from Council prior to lodgement b. be lodged with Council and accompanied by the Bond Administration Fee/s. c. be requested for release by writing to Council, when relevant approval requirements have been met. PRIOR TO COMMENCEMENT OF WORKS Engineering 7. All necessary approvals from external service providers (e.g., Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. 8. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. 9. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Page 5 of 12 Document Set ID: 25009930 Version: 4, Version Date: 27/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority - MCU25 0022 & OPW25 0029 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 172 KB (small file)
- File type
No other editions are linked here.