Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Traffic Impact Assessment

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

MOVEMENT SUMMARY
       Site: 101 [PM 2033 Post-Development (Site Folder: General)]
Cooroy Belli Creek Road / School Access
Site Category: (None)
Give-Way (Two-Way)


 Vehicle Movement Performance
 Mov Turn         INPUT          DEMAND          Deg.     Aver. Level of    95% BACK OF       Prop. Effective Aver. Aver.
 ID             VOLUMES           FLOWS          Satn     Delay Service         QUEUE          Que      Stop   No. Speed
             [ Total   HV ]   [ Total HV ]                                  [ Veh.  Dist ]              Rate Cycles
             veh/h      %     veh/h    %           v/c      sec               veh    m                              km/h
 South: Cooroy Belli Creek Road
 1        L2   2       0.0        3     0.0      0.065      3.4   LOS A      0.0      0.0      0.00     0.01     0.00   40.1
 2       T1    88      1.5        122   1.5      0.065      0.0   LOS A      0.0      0.0      0.00     0.01     0.00   39.9
 Approach      90      1.5        125   1.5      0.065      0.1      NA      0.0      0.0      0.00     0.01     0.00   40.0

 North: Cooroy Belli Creek Road
 8       T1    114     3.3        158   3.3      0.084      0.0   LOS A      0.0      0.0      0.00     0.00     0.00   40.0
 9       R2    47      3.7        65    3.7      0.041      3.8   LOS A      0.2      1.3      0.23     0.45     0.23   38.2
 Approach      161     3.4        223   3.4      0.084      1.1      NA      0.2      1.3      0.07     0.13     0.07   39.5

 West: School Access
 10       L2   121     4.1        168   4.1      0.134      7.4   LOS A      0.6      4.1      0.25     0.88     0.25   37.4
 12      R2    7       33.3       10    33.3     0.017     11.0 LOS B        0.1      0.6      0.47     0.90     0.47   36.3
 Approach      128     5.7        178   5.7      0.134      7.6   LOS A      0.6      4.1      0.26     0.89     0.26   37.3

 All           379     3.7        526   3.7      0.134      3.1      NA      0.6      4.1      0.12     0.36     0.12   38.8
 Vehicles


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is
not a good LOS measure due to zero delays associated with major road movements.
Delay Model: SIDRA Standard (Geometric Delay is included).
Queue Model: SIDRA Standard.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.



SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: PEKOL TRAFFIC AND TRANSPORT | Licence: PLUS / 1PC | Processed: Tuesday, 15 June 2021 4:36:38 PM
Project: P:\2020-21\21-313 Noosa Christian College\Calcs\School Access.sip9
Log in to download the original file

Traffic Impact Assessment.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.