Original source · versioned page text
Traffic Impact Assessment
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Figure 2.3: STUDENT MODE SHARE COMPARISON
2.5 Active Transport
2.5.1 External Facilities
There are pedestrian footpaths on both sides of Cooroy Belli Creek Road along part of the school
frontage. However, the footpaths do not extend a significant distance to the north or south of the
school site and provided limited connectivity to nearby residential areas. A pedestrian refuge is
located on Cooroy Belli Creek Road along the school frontage, as indicated in Figure 2.4.
Provision of a new footpath on the eastern side of Maple Street (between the Bruce Highway
overpass and Overlander Avenue) would serve to provide a continuous pathway between the
school and residential areas to the north. Council’s Local Government Infrastructure Plan (LGIP)
indicates that there are no plans for this to be provided by Council.
Bicycle Area Zone (BAZ) pavement markings are installed on both sides of Maple Street to the north
of the school. No cycle facilities are provided on Cooroy Belli Creek Road along the school
frontage.
2.5.2 Pedestrians
A dedicated pedestrian entrance to the site is provided from Cooroy Belli Creek Road on the
southern end of the site, as indicated in Figure 2.4. However, given that most students within
walking / cycling distance of the school (ie those living in / around Cooroy) live to the north of the
school site, the pathway is not well utilised. Instead, discussions with school management indicate
that the small proportion of students who travel to and from the school by active transport generally
access the school site via an informal path on the northern side of the vehicular access.
A pedestrian crossing is provided to facilitate pedestrian access between the school building and
short-term parking area, as shown. There is potential to improve the safety of pedestrians in this
area by providing additional pathways and crossings, as discussed in Section 3.5.1.
P:\2020-21\21-313 NOOSA CHRISTIAN COLLEGE\OUTPUTS\21-313 TRAFFIC IMPACT ASSESSMENT.DOCX 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.