Original source · versioned page text
Response to Stormwater Management Approval Conditions Letter
Attached to the e-mail Operational Works Application OPW16 /0203 - 1 of 4.
Calibre Consulting (Qld) Pty Ltd Ground Floor, 545 Queen Street Brisbane QLD 4000 PO Box 10349 Adelaide Street Brisbane QLD 4000 T +61 7 3895 3444 ABN 38 109 428 506 Our Ref: 16-001014.01L.ms.cm.docx Contact: Andrew McPhail 12 September 2016 Noosa Council Level 1, 9 Pelican St Tewantin Qld 4565 Attention: Cherie O’Sullivan Dear Cherie, Palm Lake Retirement Village (Operational Works) at 2 & 4 Lamonts Road and 18 & 20 Trading Post Road, Cooroy. Responses to Stormwater Management Approval Conditions for Operational Works Approval Calibre Consulting (QLD) has prepared Operational Works documentation for stormwater management devices for the Palm Lakes Retirement Village, Cooroy. This letter has been prepared to provide responses to stormwater & flooding approval conditions outlined in Council’s Decision Notice (MCU15/0111 & REC15/0031 dated 22 July 2016) to support Operational Works approvals for stormwater management works over the site. This letter references the Stormwater Management Plan (SWMP) Report No. 16-001014-01A dated September 2016 and the Stormwater Management Construction & Maintenance Plan (SMCMP) Report No. 16-001014-02A dated September 2016 that has been submitted in conjunction with this letter. Refer to this documentation for details. With this submission we seek overall strategy approval for the balance stormwater management works (including the Central Basin and Southern Basins). We also seek the approval for the Northern Bioretention Basin design however inflow pipes are subject to future Civil Drainage Operational Works approval. Bio-Pod D2 and D3 are subject to future Civil Drainage Operational Works approvals. Earthworks (Stormwater Related Items) 59. Buildings floor levels and bulk earthworks finish levels must take into consideration any building Minimum Floor Level required by the planning scheme at the time of construction. Response Building floor levels and final finish levels have been designed with adequate flood immunity to the maximum regional 1% AEP climate change flood level of 97.8m AHD. Design of internal stormwater drainage, overland flow paths and basins ensure that adequate flood immunity will be achieved during local flooding. Refer to Section 3.2.6 of Stormwater Management Plan (SWMP) Report No. 16-001014-01A for details of local and regional flood management. 60. Earthworks carried out on site must not adversely affect the drainage conditions on any other properties or existing roads, and/or the patterns and severity of flooding in the area particularly on downstream properties. Filling works required on site shall not cause additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural calibreconsulting.co
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.