NOOSA COUNCIL IDAS Development Application Decision Notice 4o0f9

10.

41.

— 12.

13.

14.

15.

16.

17.

18.

The pathway and road pavement in Hastings Street adjacent to the entrance to the work site shall be
swept clean at regular intervals. The works shall be undertaken under traffic contro! where applicable.

Excavation of the site and the construction of the proposed works shall not have any adverse affects on
the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
Registered Professional Engineer Queensland shall supervise the excavation of the site and the
construction of the new works to determine whether any additional measures are required to protect the
stability of adjoining buildings and/or structures and/or services and/or lands.

The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
use of vibrating installation techniques for sheet piling and other construction vibrations caused by
excavating, earthmoving or demolition machinery or other similar construction techniques) unless
approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator of
such equipment shall at all times comply with the directions of the Geotechnical engineer and the
reasonable and lawful directions of Council officers.

All parts of the works {including excavation, retaining structures, tie backs etc) are to be wholly contained
within the subject site. Any subground structures {support anchors, tie backs etc) to be utilised into
adjoining properties, shall only be used if written permission has been granted by the adjoining property
owners.

Certification of the completed works must be provided to Council by the supervising engineer. The
certification shall state that the completed works conform with all aspects of the design and that the
completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
and/or services and/or lands. .

Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
first existing external downstream stormwater structure.

These devices are to be checked and cleaned on a regular basis and specifically after each rain event.’
These devices are to remain in place during the civil works and construction phases of the development.

The location and type of device to be installed shall be established at the “pre start” meeting with
Council's Construction Technical Officer and shall be installed prior to the commencement of any works.

Council's Construction Technical Officer — Michael Conroy (ph 0410 512 505), shall be given seven (7)
days’ notice of intention to commence works to arrange a “pre start” meeting prior to the commencement
of works. .

The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.

Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council's
signed approved drawings and conditions by the applicant.

The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council's Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
site meetings. Construction Technical Officer will also sign the form at each stage when conditions
required have been satisfied. The works will be accepted “On Maintenance’ after this form, signed by the
inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
“On Maintenance’.

Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).

Council standards shall apply to these works unless otherwise modified herein.

The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.

NSC c:\docume~tVvhriocals~ 1 \temp\d1957decnotice178457.doc

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1294 - Approved Plans [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.