Original source · versioned page text
Minor Change Existing Approval MCU25 0057 01, OPW25 0078 01 & RAL25 0010 01 [As Published]
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0078) Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 00469-OW3.1 B Earthworks Plan prepared by SCG 19/06/2026 Consulting Engineers 00469-OW4.1 C Driveway and Access Plan prepared by 19/06/2026 SCG Consulting Engineers 00469-OW4.2 B Driveway Details prepared by SCG 19/06/2026 Consulting Engineers 00469-SW1.1 D Stormwater Management Plan prepared by 19/06/2026 SCG Consulting Engineers 090226 V2 Hardscape Plan prepared by Metricon 9/02/2026 1 of 3 090226 V2 Planting Plan prepared by Metricon 9/02/2026 2 of 3 Annotated by Council 090226 V2 Details Plan prepared by Metricon 9/02/2026 3 of 3 Currency Period 2. The Currency Period for this development approval lapses if the development has not substantially started by 15 September 2027 unless an application to extend the currency period is approved by Council. PRIOR TO COMMENCEMENT OF WORKS Engineering 3. All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. 4. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting. 5. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. 6. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. 7. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: a. Civil engineering works; b. Landscape works; Page 8 of 19 Document Set ID: 25050577 Version: 5, Version Date: 12/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.