Original source · versioned page text
Delegated Report - Code - Planning OPW21 0338
Author Development Engineer, Laurie Schreck Development Assessment APPLICATION DETAILS Application No. OPW21/0338 Applicant Peter Lawther Proposal Operational Works - Earthworks Properly Made Date 24 November 2021 Information Request Date Not Applicable Information Response Date Not Applicable Decision Due Date 03 February 2022 Report Completed Date 07 December 2021 Report Reviewed By Mark Lewis PROPERTY DETAILS Property Address 36 Oriole Ave Peregian Beach Qld 4573 RP Description Lot 672 P 93128 Land Area 531.0000 m² Existing Use of Land Vacant (residential dwelling recently demolished) STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Land Subject to Acid Sulfate Soils (Above 5m to 20m AHD) Bushfire Hazard (Potential Impact Buffer) Assessment Type Code PROPOSAL The application seeks approval for an Operational Works - Earthworks. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan Figure 3 – Retaining Wall Plan site details Background Earthworks had already commenced on the site when the Building Certifier became involved and advised the property owner an Operational Works approval is required due to the volume of earthworks involved. This application has since been lodged for the earthworks on the site. Site Description The site has recently had the original residential dwelling demolished to make way for a new dwelling. The works include earthworks across the property to establish a level pad. This includes cut across the rear and fill across the front of the property with retaining walls proposed on the eastern and southern sides and a portion of the northern side. All proposed retaining walls are contained within the subject property. No external fill will be imported to sitebrought into site Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Earthworks Code; and Water Quality and Drainage Code. cONSULTATION Referral Agencies Not Applicable. Internal Council Referrals Not Applicable. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW21/0338 for an Operational Works - Earthworks situated at 36 Oriole Ave Peregian Beach Qld 4573 and described as Lot 672 P 93128, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW21/0338 Street address: 36 Oriole Ave Peregian Beach Qld 4573 Real property description: Lot 672 P 93128 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Earthworks CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 21-2465-R01 E Site Plan and Construction Notes as prepared by Newport Consulting Engineers 16 November 2021 21-2465-R02 E Retaining Wall Details as prepared by Newport Consulting Engineers 16 November 2021 21-2465-R03 E Retaining Wall Details as prepared by Newport Consulting Engineers 16 November 2021 21-2465-R04 E Retaining Wall Details as prepared by Newport Consulting Engineers 16 November 2021 21-2465-R05 E Retaining Wall Details as prepared by Newport Consulting Engineers 16 November 2021 21-2465-R06 E Retaining Wall Details as prepared by Newport Consulting Engineers 16 November 2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 14 December 2023, unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS All earthworks and associated retaining structures, both above and below ground level, must be wholly contained within the subject site unless written permission form adjoining property owner/s is submitted to Council. PRIOR TO COMMENCEMENT OF WORKS Engineering Copies of the approved plans, with all plans duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer prior to the “pre start” meeting. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Erosion and sediment control works; Other relevant parties A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: Provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Any changes to the details associated with the Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with the standard. Fall protection must be provided to retaining walls that are over 1m high. Slope and batters are a maximum grade of: 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Principal Contractor who is responsible for ensuring that the sediment and erosion control measures have: Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or Where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. The certificate must be submitted to Council within 3 months of the completion of the works. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 11 of 11 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] 36 Oriole Ave, Peregian Beach QLD 4573, At Search History > = | Neg fi EX * [Attachment: image2.png (image text)] SANIAY TIOINO 28 163 T4700" EXISTING SHED HiGH-SET SINGLE STOREY W/B0KRD HOUSE to > - NEIGHBOUR'S POOL SINGLE STOREY W/BOARD HOUSE [Attachment: image3.png (image text)] ‘S/WATER MAINS 300mm DEEP >~-—— 3 i 300 WIDE FREE DRANING 8 ct $ GRANULAR BACKFIL B f } PROVIDE GEOFABRIC (BIOM E st Lb ‘OR APPROVED EQUIVALENT) 1 = s 2 PIER DEPTH (0)-REFER SCHEDULE “8 I 908 AG. DRAIN FALL TO STORMWATER — EMBED BOTTOM SLEEPER MIN. 100 BELOW FINISHED SURFACE LEVEL — 200mm LONG SITE WELD REINFORCING BARS (Rt) WELDS TYPES: ‘CEW FOR N12 & N16 BARS. CPW FOR N20 BARS. CONCRETE SLEEPER RETAINING WALL (RW1) SCALE 1:20 [Attachment: image4.png (image text)] Zones Low Density Residential Medium Density Residential High Density Residential Tourist Accommodation WH Major Censre wm Districe Centre mi Local Centre Neighbourhood Centre Low Impact Industry Medium Impact Industry Recreation and Open Space BB Environmental Management and Conservati.. Community Facilities my Innovation Rural Rural Residential Community Facilities | ahel | een 674P93128 24 675P93128 43) (08UP13751 15 e79P93128 | 43, 4 649°99128 36 o72p93128 xf oBuP1036190 34 o71P 93128 37. 651P93128 32 67093128 35, 652P93128 30 " 66993128 7 67793128 15 678P93128 13 679P93128 19 676P93128 @
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.