Response to oustanding issues Animal Husbandry MCU12/0184
Very large file: it may take a few minutes
The original of this document is very large (126 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
(lGU \ ~/OJ~~
{4pfQM)t..-k>~~
MAX WATTERSON+ASSOCIATES
CONSULTING SURVEYORS & PLANNERS
1 "1, "li rlijl~il ~lirfl!iI~I~lr ~
1 ih Septem ber, 2013
X0009760 Ref: 06-2184
Your Ref: JL013:JL:MCU12/0184
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
[bJ~5~QJ... .dq..........]
R:
SUNSHINE COAST MAIL CENTRE .Q.
Attention: Jack Lewis Development Counter
Dear Sir,
I refer to the above-mentioned matter and your email containing an Outstanding Issues
Request dated 28th June, 2013; and I respectfully supply the following documents:
1) A Preliminary Operational Management Plan has been prepared by MWA
th
Environmental, (Job No. 12-002 dated 11 September, 2013). The Plan
addresses the integration of the poultry farm operation with the avocado orchard
operation. The Plan also includes correspondence prepared by Alwyn Peffer &
Company Pty Ltd regarding an audit of the tree count and nutrient calculations
prepared by Myriad International pty Ltd which concludes that the com posted
material produced will not meet the demands of the orchard.
2) An additional response prepared Hayes Traffic Engineering (dated 5th August,
2013) and an updated Traffic Engineering Report (Project 11347 Version DA -
RFI02 dated August 2013) incorporating the additional response required by
Council.
3) An additional response prepared by MWA Environmental regarding Odour Issues
(dated 11th September, 2013) addressing the issue of odour generated by the
composting operation.
4) An amended Stormwater Treatment and Water Quality Management Plan
prepared by Callaghan & Toth Civil, Hydraulic & Environmental Engineers (Ref:
-
No. 1209 SWQMP Report_Version_2 2013 dated August 2013). The amended
Management Plan includes additional bunded areas set aside for the compost
operation.
I also refer to additional issues raised by late submission lodged at Council; in particular
the multiple submissions by Mr Rod Ritchie and the submission by Cr Tony Wellington
("More Chooky Business" dated 16th July, 2013).
Fruit Tree Audit
As stated above an audit of the tree count is included in the Preliminary Operational
Management Plan with a tree count of 6,651 avocado trees in the orchard engaged in
the current production of fruit.
PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max l Watterson PH 07 5442 6121
Cadastral Surveyor (Qld) FAX 0754425125
B.Surv(UNSW). M.S.S.S.I EMAll [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.