Original source · versioned page text
Response to oustanding issues Animal Husbandry MCU12/0184
Very large file: it may take a few minutes
The original of this document is very large (126 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
. .
roof catchment Pre development Q10 noosa 10-Year Duration=6 min, Inten=208.9 mmlhr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAOO 10.00 sin 05328 @ 2011 HydroCAD Software Solutions LLC Page 4
Summary for Reach 4R: (new Reach)
[40]Hint: Not Described (Outflow=lnflow)
Inflow Area = 1.4653 ha, 0.00% Impervious, Inflow Depth = 21 mm for 10-Yearevent
Inflow = 0.63011 [email protected] hrs, Volume= 0.306 MI
Outflow = 0.63011 [email protected] hrs, Volume= 0.306 MI, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
Reach 4R: (new Reach)
Hydrograph
.Inflow
IOutflow
Inflow Area=1.4653 ha
C
;;;-
.s
~
o
1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.