Original source · versioned page text
Response to oustanding issues Animal Husbandry MCU12/0184
Very large file: it may take a few minutes
The original of this document is very large (126 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
. ,.,
roof catchment Post development Q10 noosa 10-Year Duration=6 min, Inten=20B.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAOO 10.00 sin 05328 @ 2011 HydroCAD Software Solutions LLC Page 3
Summary for Subcatchment 2S: total roof area
Runoff = 0.85149 [email protected] hrs, Volume= 0.413 MI, Depth= 28 mm
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=6 min, Inten=208.9 mm/hr
Area (m2) C Description
14,653.0 1.00 LIGHT GRASS ON clay
14,653.0 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (meters) (m/m) (m/sec) (m3/s)
5.0 Direct Entry, metal
5.0 0.0 Total, Increased to minimum Tc = 6.0 min
Subcatchment 2S: total roof area
Hydrograph
III Runoff~
noosa 10-Year
0.8
Duration=6 min,
0.7 Inten=208.9 mm/hr
C 0.6 Runoff Area=14,653.0 m2
;0-
Runoff Volume=O.413 MI
S 0.5
Runoff Depth=28 mm
~
..2 0.4 Tc=6.0 min
u.
0.3 C=1.00
0.2
0.1
o
o 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.