I’ . \
1
~
Callaghan & Toth
APPENDIX 8 SEDIMENT BASIN CALCULATION
V=10 x Cv x A X Rx-day. y-%ile
Where:
10 = a unit conversion factor
Cv = the volumetric runoff coefficient defined as that portion of rainfall that runs off as
stormwater over the x-day period
Rx-day. y-%ile = is the x-day total rainfall depth (mm)that is not exceeded in y percent of rainfall
events.
A = total catchment area (Ha)
Sediment storage zone design parameters used here:
. 50% of setting zone capacity
AREA OF SITE Cv RX-day.y- TOTAL SETTING SEDIMENT TOTAL
TREATMENT %ile CMT ZONE STORAGE BASIN
(Ha) VOLUME VOLUME VOLUME
(m3) (m3) (m3)
150x21 A 0.3 43.4 0.315 41.0 20.5 61.50
70x21 B 0.3 43.4 0.147 19.1 9.55 28.65
Basin A: 13.7m x 3m x 1.5m D, setting depth 1m, storage 0.5m
Basin B: 9.55m x 2m x 1.5m D, setting depth 1 m, storage 0.5m
1209 Animal Husbandry -
Top Forestry Rd. Ridgewood SWQMP_REV_3
SEPTEMBER 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.