Council archive · source document
0015CFE0.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NOOSA COUNCIL IDAS Development Application Decision Notice 3
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. The site is to be landscaped in accordance with Councils Policy on Landscaping Guidelines and the
approval Plan of Development. The approved plan is labelled: Landscape Plan, prepared by Glen Gloster
Landscape Architect and dated 22.06.07, and as may be amended by these conditions and annotations
detailed on the approved plan.
2. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency.
3. Implement the landscape construction in accordance with the amended landscape plan, planting schedule
and horticultural industry best practices.
4. Plant all trees a minimum of 1.0 m from all underground services.
5. Deleted.
6. Deleted.
7. Deleted.
8. Deleted.
9. All 45 litre bag stock and transplanted Pandanus trees must be staked or guy roped to assist in stabilising
the plants during the establishment period.
10. Prior to the demolition of the existing dwelling and construction of the new proposed residence, all
specimen plants nominated to be retained on the approved landscape plan must be provided with
protective barricade fencing to prevent damage and unnecessary scaring of trunks and limbs.
11. No access to the building site is permitted for construction purposes through the adjacent northern beach
reserve area, unless otherwise approved in writing by Council.
12. The access path along the southern side of the dwelling is to be no greater than 1.0 m wide.
13. The screening and understorey vegetation along the southern boundary of the site is to be a minimum 1.0
m wide and established into natural ground level.
14. The demolition waste shall be segregated and recycled as outlined in the approved Waste Management
Plan prepared and submitted by Greg Sneyd of Wiley and Co Pty Ltd, dated 12 November 2004.
15. These works are also to be in compliance with the relevant conditions of Development Permit No. 19833
DA.
16. This Development Permit lapses if the development has not happened by 20 July 2009, unless application
to extend the currency is approved by Council.
Additional Conditions
17. All planting on the site shall be maintained in accordance with the vegetation management plan
(Maintenance schedule for beachfront dune plantings in the Council Reserve immediately north of 2
Tingira Crescent Sunrise Beach) dated July 2007.
18. All native plant species that are located in group plantings shall not be subjected to any hedging
maintenance regimes.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@3001c604\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015CFE0.001.pdfRelated documentPublic source context ↗
04/5059 COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 39 KB (small file)
- File type
No other editions are linked here.