NOOSA COUNCIL IDAS Development Application Decision Notice                                                                 5




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


            Access, car parking, stormwater disposal, sediment and erosion controls

1.     The development shall be carried out in accordance with Engineering drawing No.WO4080-00H002A as
       prepared by Wiley Australia or otherwise modified herein.

2.     Roof and surface runoff connection to Council’s kerb and channel and to an on site storage tank and absorption
       trench system as shown on drawing No. WO4080-00H002A (Wiley) is satisfactory. Kerb adapters shall be used
       in the kerb.

3.     Council’s Inspector, Mr Mick Conroy, shall be given seven (7) days’ notice of intention to commence works.

4.     Council standards shall apply to these works unless otherwise modified herein.

5.     The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during
       the construction of the engineering works to ensure that Council property, road pavements or facilities (such as
       underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, etc.) are protected against any
       damage or interference whatsoever. If any Council property or facilities should be damaged by the Applicant or
       any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly,
       carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of
       the Manager-Land Development, prior to the sealing of the survey plan or, alternatively, the Applicant may
       request the Council to carry out the rectification work at the Applicant’s cost, such cost being paid by the
       Applicant to the Council prior to the sealing of the survey plan, provided that in the case of emergency the
       Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the
       sealing of the survey plan.

6.     The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to
       residents in the vicinity of the development.

7.     Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00 pm
       Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended hours are
       approved by the Manager-Land Development or his nominee.

8.     All signage, including that for safety during construction shall be in accordance with the Manual of Uniform Traffic
       Control Devices and Traffic Infrastructure (Roads) Act.
       Safe pedestrian access on Tingira Crescent shall be maintained at all times. Should footpath / road closures be
       necessary to carry out construction works, Council’s inspector Mr Mick Conroy must be notified prior to the
       proposed closure.
9.     Sediment and erosion control measures must be in place prior to works commencing. If such measures are not
       in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if sediments from the
       site are found to enter or have the potential to enter Council’s stormwater system or natural waterways.

10.    These works are also to be in compliance with the relevant conditions of Development Permit No. 19833 DA.

Additional Conditions
11.    The length of the Tingira Crescent street frontage/road verge to the lot shall have a 2 degree cross fall to the
       road. The cross fall shall extend from the eastern edge of the road reserve, across the width of the pedestrian
       footpath to the back of the kerb. All work shall be to the satisfaction of the Construction Technical Officer of Land
       Development, Mr Mick Conroy.

12.    The driveway shall be modified to have a cross fall of 6 degrees towards the road. The work shall be to the
       satisfaction of the Construction Technical Officer of Land Development, Mr Mick Conroy




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@3001c604\@[email protected] 21/08/07

Used in these records

About this file

File size
39 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015CFE0.001.pdf · 39 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.