Council archive · source document
Response to applicant providing Infrastructure Charging methodology feedback - MCU15 0095 & REC15 0022.msg · REC15/0022
Subject: FW: IC Advice RE: Decision Notice MCU15/0095 & REC15/0022 From: Denis Wallace Date: 2016-05-13T05:03:35.698000+00:00 To: '[email protected]' Hi John, Response below from our Infrastructure Assessment Coordinator regarding the issued charge notice basis. Feel free to give him a ring to discuss further. Regards, Denis Wallace Coordinator Planning I Noosa Council Phone: 07 5329 6239 Email: [email protected] <mailto:[email protected]> Website: www.noosa.qld.gov.au <http://www.noosa.qld.gov.au/> Location: Level 3, 9 Pelican Street, Tewantin Mail: PO Box 141 Tewantin Qld 4565 cid:[email protected] From: Oddbjorn Ludvigsen Sent: Friday, 13 May 2016 1:05 PM To: Denis Wallace Subject: IC Advice RE: Decision Notice MCU15/0095 & REC15/0022 Hi Denis, The answer is that NO Adopted Charge Credit currently applies to this Existing Vacant Non-Residential Lot under Council’s Charges Resolution and the SPA Legislation since an automatic credit only relates to the actual development that exists on the site. However a credit for the Parks network has been fully given for the existing lot (see further explanation below). i.e. Noosa Shire Council Charges Resolution (No. 2) 2014 Effective Date: 16 February 2015, Refer sections 8.4 & 8.5 which state: 8.4 Credit The credit for the premises is an amount which is the greater of the following: (a) the amount of an adopted infrastructure charge previously paid for the development of the premises; (b) where the premises is subject to an existing lawful use or previous lawful use no longer taking place for: (i) residential development, the amount stated for an adopted charge in Table 10.3 (Schedule of adopted charges) for the lawful use; (ii) non-residential development other than special uses, the amount stated for an adopted charge in Table 10.3 (Schedule of adopted charges) for the lawful use; (iii) non-residential development being special uses or other development not otherwise identified in paragraphs (i) or (ii), the amount for the charge category that the local government determines should apply for the use; The onus remains with the applicant to provide full details and evidence as to the extent and lawfulness of any claim for a credit for a previous use no longer taking place. (c) where the premises is not subject to an existing or previous lawful use: (i) for residential development, the amount applicable for a residential lot stated for Residential (3 or more bedroom dwelling unit) in Table 10.3 (Schedule of adopted charges) applicable to a single residential lot provided the lot is capable of having a dwelling house built on the lot in compliance the planning scheme requirements; (ii) for non-residential development, no credit applies; 8.5 Additional credit for past contribution or charge For a past contribution and or charge that has been paid for a particular network under a previous charging regime that exceeds the network component of the credit applied under section 8.4 (Credit) an “additional credit” against the adopted charge for the particular network will be recognised. The amount of the credit will be determined by converting the previous payment to an equivalent adopted charge as determined by Council and only relates to the amount over and above the standard credit applied under section 8.4 (credit). The amount of the credit will not be more than the adopted charge amount apportioned for that network. The onus remains with the applicant to provide full details and evidence of any payments of contributions and or charges under a previous charging regime. And i.e. SPA Legislation Section 636 which states: 636 Limitation of levied charge (1) A levied charge may be only for additional demand placed upon trunk infrastructure that will be generated by the development. (2) In working out additional demand, the demand on trunk infrastructure generated by the following must not be included— (a) an existing use on the premises if the use is lawful and already taking place on the premises; (b) a previous use that is no longer taking place on the premises if the use was lawful at the time it was carried out; (c) other development on the premises if the development may be lawfully carried out without the need for a further development permit. The Legislation is silent on how infrastructure charges apply on lot reconfigurations and is therefore primarily governed by each individual Local Government’s Charges Resolution. Note that some other Council’s apply the full planning scheme gfa potential of the site upfront on the lot reconfiguration approval rather than being primarily based on a subsequent MCU approval that defines the actual development on the site. Assessment Infrastructure Charges applicable for this Non-Residential Lot Reconfiguration approval as follows: As NO development exists on the site, there is no existing non-residential m2 gfa credit available to be given. Similarly, no Adopted Infrastructure Charge under the current legislation applied or was paid when the Lot was created so No adopted charge for a non-residential Lot credit is available either. However, when the lot was created under the Development Approval 23134 DA (Stage 3), the contributions applied & paid were only for Water Supply & Sewerage Headworks & Parks under the PSPs that applied at that time. Therefore under section 8.5 of Council’s Charges resolution, the Parks credit for a lot has been fully credited (Note this equivalent $2,520 lot credit applied in this charge notice greatly exceeds the actual $600 amount paid). No Transport network contributions applied or were paid so no credit is available for those networks. Note that Unitywater’s infrastructure charge notice for Water Supply & Sewerage networks should include a credit & is assessed & applied as determined by Unitywater. If this non-residential Lot reconfiguration proceeds & the infrastructure charge paid, then each created lot carries a full non-residential lot adopted charge credit towards any future MCU development of each site. Regards Lud Oddbjorn Ludvigsen Infrastructure Assessment Coordinator PLANNING & INFRASTRUCTURE Phone: 07 5329 6449 Email: [email protected] Website: www.noosa.qld.gov.au <http://www.noosa.qld.gov.au/> Location: Level 2, 9 Pelican Street, Tewantin Mail: PO Box 141 Tewantin Qld 4565 cid:[email protected] Please consider the environment before printing this email From: Denis Wallace Sent: Friday, 13 May 2016 10:56 AM To: Oddbjorn Ludvigsen Subject: FW: Decision Notice MCU15/0095 & REC15/0022 From: John Rowell [mailto:[email protected]] Sent: Wednesday, 11 May 2016 11:20 AM To: Denis Wallace Cc: Hayley Edmunds; Edward Masterson ([email protected]) Subject: RE: Decision Notice MCU15/0095 & REC15/0022 Hi Denis, Further to the issue of council’s Decision Notice for the above, I have a couple of points which require action from council: 1. Approved plan of subdivision – the approved plan as per attached decision notice is as per what was originally lodged. Refer to the attached email correspondence between council / TFA confirming that there was a minor amendment / update to this plan. We require council to amend the stamped approved drawing to reflect this latest plan and to amend the date referenced in condition 2. If this could simply be back-dated to reflect the decision notice date that would be appreciated. 2. Infrastructure charges for the ROL – AS per the attached charges notice, could council please clarify whether any credit should be applied for the existing lot? Many thanks Denis. If the above could be actioned asap that would be appreciated. Regards, John Rowell Associate Town Planner BA, MURP, MPIA TFA Logo - Full Colour Black Head Office 17 Dover Street, Albion Qld 4010 PO Box 301, Albion Qld 4010 New South Wales Suite 315, 33 Lexington Drive Bella Vista NSW 2153 Victoria Suite 13, 150 Albert Road South Melbourne Vic 3205 Mobile: 0400 884 054 Direct Line: +61 7 3854 2923 Reception : +61 7 3854 2900 Fax: +61 7 3854 2999 Australia Wide: 1300 794 300 Website: www.tfa.com.au <http://www.tfa.com.au/> ________________________________ This communication is intended for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking any action in reliance on this communication by persons or entities other than the intended recipient is prohibited. If you received this in error, please inform TfA Project Group on 07 3854 2900 immediately or by return email and delete the material including all copies from any computer. From: Hayley Edmunds Sent: Friday, 29 April 2016 4:48 PM To: John Rowell <[email protected]> Subject: Fwd: Decision Notice MCU15/0095 & REC15/0022 Sent from my iPhone Begin forwarded message: From: Kerri McKay <[email protected]> Date: 29 April 2016 4:44:33 pm AEST To: "[email protected]" <[email protected]>, Hayley Edmunds <[email protected]> Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]> Subject: Decision Notice MCU15/0095 & REC15/0022 Please refer to the link below to access the Decision Notice for MCU15/095 (Material Change of Use of Premises - Retail Business Type 2 Shop & Type 5 Vehicle Uses) & REC15/0022 (Reconfigure a Lot – 1 into 2 Lots) and Approved Plan for REC15/0022 situated at 115 Eumundi Noosa Road, Noosaville. Please note that this link will expire on 19 May 2016, 4:34 PM. The Infrastructure Charges Notice will be emailed under separate cover for REC15/0022. https://noosa-cianywhere.t1cloud.com/T1Prod/CiAnywhere/Web/Prod/ECMCore/ BulkAction/Get/a3c263c0-8f05-4aa6-8a2e-964e38137d54 Please note, the document generation may still be in progress. If you experience any problems accessing these documents, please do not hesitate to contact me on the number below. Kind regards, Kerri McKay Kerri McKay Administration Officer – Planning & Development I Noosa Council Phone: 07 5329 6242 Email: [email protected] Website: www.noosa.qld.gov.au <http://www.noosa.qld.gov.au/> Location: Level 2, 9 Pelican Street, Tewantin Mail: PO Box 141 Tewantin Qld 4565 Description: cid:[email protected] Please consider the environment before printing this email
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to applicant providing Infrastructure Charging methodology feedback - MCU15 0095 & REC15 0022.msgRelated documentApplication case desk ↗
Response to applicant providing Infrastructure Charging methodology feedback - MCU15 0095 & REC15 0022.msgRelated documentApplication case desk ↗
About this file
- File size
- 88 KB (small file)
- File type
- MSG
No other editions are linked here.