Skip to the record
Accept no substitutions.

Council archive · source document

Submitted Plans MCU11/0204

of 10

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

Direction X

. Direction Y
& BRACING REQUIRED - 189.44 kN'S .
BRACING PROVIDED - 196.94 kN

5 of 10

 

2041028

 

JOB #
OWG XO

 

 

 

   

¥20(800)5.12" = ¥24(600)3.84_
Rom NY : mae 7%

      
  
  
  

 

 

x OK
————™ X27(600)3.84

182164 KN >

j
+
nn 4

X20(600)3.84
PROPOSED RELOCATION

BRACING

 

Friday, 23 September 2011

 
      

|
B

 

 

 

X21(900)5.76
x
TITLE

 

 

BRACING REQUIRED -
BRACING PROVIDED -
S

 

x fog . x
Y22(2700)17.28 ¥28(2400)15.36

   
 
  

X26(600)3.84

 

¥10(2100)13.44 | Y44(2100)13.44
Se aa 7

x Beg c -
/ 4]
/ /

€

Y24(2700)8.10

 

vy

xy ae _ ym

 

   

 

1270 McKINNON DRV
RINGTAIL CREEK, 4565

JOE FRANZ

 

X19(1800)11.52

 

X25(600)3.84

X10(1600)10.24
4
fo

Wh x
'¥25(2200)14.08
N \

CLIENT DETAILS

 

 

 

lug

 

 

 

 

 

 

N eq] rex) 71 \

A JA |
\ fo
Yago0}s.12 \ / 5201500988 — —

[ ——S

bi — ¥12(2700)8.1

 

 

 

 

Wp

 

 

 

wg

 

 

 

X11(1500)9.6
x

we

X24(900)5.76

 

 

 
   

wh

 

 

 

 

~.1200)7.68

~— A ¥13(1800)5.4 / Hf} N14(2700)8.1 f

NOTE: FIGURED DIMENSIONS TAKE PREFERENCE OVER
4:100

‘SCALED. IF IN DOUBT PLEASE CONTACT THIS OFFICE.

X18(1800)11.52

<

 

 

X4(1500)9.6

xq

 

Hq

\
/

 

ZL

4

 

 

\

X2(1500)9.6

 

 

X22(1800)11.52
X23(1800)11.52

/

 

/ nm __X6(2700)8.1
NN

x

 

xm

 

 

nog
X17(900)5.76

 

 

 

 

 

4

Bo

x

x
X5(600)3.84

 

 

Y29(600)3.84 Y30(600)3.84

 

   

X12(1000)6.4

    

x a

 

X3(600)3.84

 

 

 

  
  

x x xm

Y3(1200)7.68 Y4(1200)7.68

 

 

X14(900)5.76_

\
“<
s
a
3
N
8
s
£
~
a
8

orm
x m x7 OH
¥15(1500)9.6 ——_- ——- —~—~ Y16(1500)9.6

 

Note

 

 

Note Only tiedown rods associated with bracing sheets are shown.
12mm Cyclone rods are to be placed within 100mm each side
Bracing and tiedown information provided of openings and spaced no further than 1200mm (RLW 6600)
is a recommendation. Other methods can and 1500 (RLW4500).

be used, provided that the combination of
bracing and/or tiedown systems is

installed porrectly and evenly throughout / mT a o : . oO . 60% of the required final bracing needs to’be fitted during N. 4
meet the Wind Load and Uplift Calulations a : : / . construction,

w
é
tS
Cs)
0
bt
+
1D
bh
3

x
6
uw

1

te)
3
$
KR
Ss
a
Cc
6
=
x

ww
nN
o
QR
N
wo
om
z
2
o-
ec
&$
§a
Bg
wy
$5
ow
&E
on
£8
63
38
2a“

Fineline Residential Design
P.O.Box 235, Eudlo 4554

 

 

 

©COPYRIGHT - THIS WORK IS COVERED BY COPYRIGHT LAWS AND CANNOT BE COPIED IN WHOLE OR PART WITHOUT WRITTEN PERMISSION OF FINELINE RESIDENTIAL DESIGN.

 

 

 

Temporary bracing during construction

 

 

 

 

 

 

 

 

provided. This can ‘nelude the fited final bracing panels. _\wanv careoory

 

 

   

Used in these records

About this file

File size
898 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Submitted Plans MCU11_0204.pdf · 898 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.