Council archive · source document
Operational Works Application OPW19-0033 · OPW19/0033
Very large file (15.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
section 22A of the Vegetation Management Act 1999? LJ Yes — this development application includes written confirmation from the chief executive of the Vegetation Management Act 1999 (s22A determination) No Note: 1. Where a development application for operational work or material change of use requires a s22A determination and this is not included, the development application is prohibited development. 2. See hitps/www_gid.gov.au/environmenthand/vegetation/applying for further information on how to obtain a s22A determination. Environmental offsets 23.4) Is this development application taken to be a prescribed activity that may have a significant residual impact on a prescribed environmental matter under the Environmental Offsets Act 2014? 1 Yes — | acknowledge that an environmental offset must be provided for any prescribed activity assessed as having a significant residual impact on a prescribed environmental matter No Note: The environmental offset section of the Queensland Govemment’s website can be accessed at www.qld.gov.au for further information on environmental offsets. Koala conservation 23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work within an assessable development area under Schedule 10, Part 10 of the Planning Regulation 2017? 1 Yes XI No Note: See guidance materials at www.des.g/d.gov.au for further information. Water resources 23.6) Does this development application involve taking or interfering with underground water through an artesian or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking overland flow water under the Water Act 2000? (1 Yes — the relevant template is completed and attached to this development application and | acknowledge that a relevant authorisation or licence under the Water Act 2000 may be required prior to commencing development XI No Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au for further information. DA templates are available from https:/planning.dsdmip.gid.gov.au/. if the development application involves: * Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 1 * Taking or interfering with water in a watercourse, lake or spring: complete DA Form1 Template 2 * Taking overland flow water: complete DA Form 1 Template 3. Waterway barrier works 23.7) Does this application involve waterway barrier works? C1 Yes — the relevant template is completed and attached to this development application No DA templates are available from httos://planning.dsdmip.gid.gov.au/. For a development application involving waterway barrier works, complete DA Form 1 Template 4. Marine activities 23.8) Does this development application involve aquaculture, works within a declared fish habitat area or removal, disturbance or destruction of marine plants? (1 Yes — an associated resource allocation authority is attached to this development application, if required under the Fisheries Act 1994 KX] No Note: See guidance materials at www.daf.qid .gov.au for further information. Quarry materials from a watercourse or lake 23.9) Does this development application involve the removal of quarry materials from a watercourse or lake under the Water Act 2000? (1 Yes — 1 acknowledge that a quarry material allocation notice must be obtained prior to commencing development XI No naan 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW19-0033.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.