Operational Works Application OPW19-0033 · OPW19/0033
Very large file (15.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Consult Arborist 5.3 ARBORICULTURAL PROPOSAL To complete the proposed works described above trees, T1 and T2 will be directly impacted rendering them unsuitable for retention and thus requiring removal. It is proposed that trees T1 and T2 are removed to due past root interference, design conflict and road reserve reconfiguration. Replacement trees should be planted after the earthworks have been completed. Due to the nature of the shallow soils, it is recommended that oversized planting pits should be excavated and filled with quality topsoil to provide the new trees with the best opportunity to establish and flourish. The suggested replacement tree species are offered to continue the current streetscape theme and should be planted on the standard alignment 1000-1500mm behind the kerb with the final positioned to be confirmed. 2 x 300mm / 451 pot size: Giant Water Gum, Syzygium francisii Brush Box, Lophostemon confertus 19_02_07_AA 205Blueberry Drive ~ Page 9 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW19-0033.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.