Skip to the record
Search everything, all in one place.

Council archive · source document

Operational Works Application OPW19-0033 · OPW19/0033

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 
 

6.3) Additional aspects of development

( Additional aspects of development are relevant fo this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

EX] Not required

 

 

Section 2 — Further development details
2) Does the proposed development application involve any:of'the following?

   
   

 

 

 

Material change of use (1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (1 Yes — complete division 2

Operational work Yes — compleie division 3

Building work (1 Yes — complete DA Form 2 ~ Building work details

 

 

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.

SEP Bitoni ls\on th om 109) Ocal et ce cee et ois Se
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor

   

 

 

proposed use (include each definition in a new row) units f applicable) area (m’)
(# applicable)

 

 

 

 

 

 

  

8:2) Does the proposed use involve the use of existing buildings on the premises? -
yes
[No

 

 

 

 

 

 

 

Division 2 ~ Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1): What is the total number.of.existing lots making up.the premises?.

: 9.2) What is the nature. of the lot Ceonieie ene ie applicable boxes)

 
  

   
     
     

 

 

C1 Subdivision (complete 10)) (J Dividing tand into parts by agreement (complete 11))
(1 Boundary realignment (complete 12)) (1. Creating or changing an easement giving access to a lot
from a construction road (complete 13))

 

40):Subdivision :

    

     

10:1) For this development; how many lots are being: created:and whatis the intended use of those:lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:

Number of lots created
10.2) Will the subdivision be staged?

(I Yes — provide additional detaiis below
[CINo

How many stages wil! the works include?

 

 

 

 

 

 

What stage(s) will this development application
apply to?

 

 

 

 

Maan 4

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW19-0033.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.