Decision Notice - Approved by Delegation of Authority MCU19 0002 · MCU19/0002
Officer: Glen Conforti Direct Telephone: 07 53296241 Our Reference: MCU19/0002 Your Reference: n/a 26 March 2019 SC Scott C/- Beach House Architecture Pty Ltd 129 Lorikeet Dr PEREGIAN BEACH QLD 4573 [email protected] Dear Stuart, Decision Notice Planning Act 2016 I refer to your application and advise that on 26 March 2019, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: MCU19/0002 Street address: 10 Arakoon Cres Sunshine Beach Qld 4567 Real property description: Lot 787 RP 48111 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use - Detached House CURRENCY PERIOD of approval The currency period for this development approval is 6 years starting the day that this development approval takes effect. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date DA-00 1 DA Documents Cover Sheet, prepared by Beach House Architecture 04.03.19 DA-01 1 Site & Roof Plan, prepared by Beach House Architecture 04.03.19 DA-02 1 Upper Level Main Floor Plan, prepared by Beach House Architecture 04.03.19 DA-03 1 Lower Level Floor Plan, prepared by Beach House Architecture 04.03.19 DA-05 1 South Elevation, prepared by Beach House Architecture 04.03.19 DA-06 1 South Sectional Elevation, prepared by Beach House Architecture 04.03.19 DA-07 1 East & West Elevations, prepared by Beach House Architecture 04.03.19 DA-09 1 North Elevation, prepared by Beach House Architecture 04.03.19 Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Landscaping A minimum of 20% of the site must be retained as soft landscaping. Existing vegetation on the steeply sloping portion of the lot on the site must be retained. In this regard, 5m measured from the seaward boundary must be regenerated and densely planted to include a mix of native endemic ground covers and shrubs. The works must be undertaken in accordance Planning Scheme Policy PSP3 Landscaping Plants and Guidelines and with an operational works approval. Trees to be retained must be protected from clearing or construction activities by: clearly marking vegetation to be retained with flagging tape installing protective fencing around the drip line of the vegetation restricting stockpiling, storage and vehicle parking to those areas which are already cleared using low impact construction techniques around vegetation. The new filled areas in the road reserve must be landscaped in accordance with an operational works approval and in particular: sufficient area for pedestrians must be provided between the back of kerb and the small garden located to the southern side of the driveway within the road reserve a minimum of 2 native endemic street trees with a minimum pot size of 45 litres must be provided within the road reserve; new street tree plantings must: meet NATSPEC Guidelines: Specifying Trees requirements for quality be pruned in accordance with AS 4373, Pruning of Amenity Trees be pest and disease free; except for the southern side of the driveway where a garden may be provided the road verge must be grassed and: rolled, top dressed and join smoothly to adjoining surfaces species sustainable for local conditions and do not require irrigation free of disease, pest, weeds, rock and debris. Coastal Protection Gates must not be installed along the seaward property boundary to gain direct access to the beachfront. External colours and finishes of the building must comprise of muted/environmental tones that blend with the natural environment ENGINEERING Site Access and Driveways A sealed access driveway must be provided from Arakoon Crescent to all parking areas of the development generally in accordance with the engineering design drawing number 29005-C2.1 (A) titled Driveway Plans & Details prepared by SCG Consulting Engineers and dated 04 March 2019. The works must be undertaken in accordance with an Operational Works approval and must include in particular a driveway crossover in generally accordance with Council’s Standard Drawings RS-049 and RS-050. Stormwater Drainage Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site, the Coastal Protection Area or any adjoining property. The works must be carried out generally in accordance with the engineering design drawing number 29005-SW1.1 (A) titled Stormwater Management prepared by SCG Consulting Engineers dated 04 March 2019 and taking into consideration the findings and the relevant recommendations of the Soil Assessment Report and the Slope Stability Report by SCG Consulting Engineers dated 21 February 2019. The completed works must be certified by an RPEQ to be in compliance with the design and the applicable standards. This engineering certification must be provided to Council prior to issuing the final certification for the building works. Sewer Design A design for the sewer connection and any proposed sewer pump on the site must be approved or endorsed by Unitywater prior to commencement of any building or construction works on site. Geotechnical Stability The development must be constructed in accordance with the recommendations of the Slope Stability Assessment Report No: 29005 (SL) prepared by SCG Consulting Engineer and dated 21 February 2019. Certification must be submitted to Council from a qualified person* which certifies that the development has been constructed in accordance with conditions of this permit and that the development has a minimum factor of safety against landslip of 1.5 in the long term. *(Refer to advisory Note) Earthworks and Retaining Walls Earthworks and retaining works carried out on site must not affect the structural integrity of any of the buildings and/or lands and/or structures that border the development site. Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate of Classification. All fill, associated batters and retaining structures (both above ground and below ground) must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments and to ‘Level 2’ geotechnical supervision. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Construction Management Plan A Construction Management Plan must be submitted to and approved by Council prior to the issue of the Building Permit. The plan must include but not be limited to the following: traffic management during all aspects of the construction phase including: a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased proposed fencing to the site during the construction phase of the development provision for worker car parking maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures works programme identifying key components of the works and their respective durations establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic, services and other relevant issues identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures details on the location of external fill/dump sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Qualified Person For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: is a Registered Professional Engineer of Queensland (RPEQ); and has a degree in civil engineering or engineering geology; and has a minimum of 5 year’s experience in the field of geotechnical engineering or engineering geology. Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Access Driveway and Landscaping Development Permit for Building Works All Building Work submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Glen Conforti Development Planner Enc: Appeal Rights Approved Plans/Documents cc. Unitywater Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 4 of 7 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 7 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU19 0002Related documentApplication case desk ↗
About this file
- File size
- 328 KB (small file)
- File type
- DOCX
No other editions are linked here.