               NOOSA COUNCIL IDAS Development Application Decision Notice                                                             6


               30.      All carparking shall be kept, maintained and line-marked in a condition fit for use.
               Vegetation Protection & Preservation

               31.      Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be
                        designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls
                        on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to
                        damage the tree or their root system and in this regard temporary fencing shall be provided around the
                        trees during construction to help protect them.

                        Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious
                        pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works.

               Park Contributions

               32.      A Park contribution of $5,289 towards the acquisition of additional parkland or the improvement of existing
                        parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit
                        for Operational Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements
                        for Development Applications. This amount will be subject to variations in the Consumer Price Index, All
                        Groups Brisbane from September 2005 until the date of payment.
               Pathway Contributions

               33.      A pathway contribution of $5,343 towards external major pathways, in accordance with Planning Scheme
                        Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to obtaining a
                        Development Permit for Operational Works. This amount will be subject to variations in the Consumer
                        Price Index, All Groups Brisbane from September 2005 until the date of payment.
               Stormwater Drainage

               34.      All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater
                        runoff from the site.

               35.      Roof runoff from any new buildings shall be directed to a rainwater storage system or tank (minimum
                        storage capacity equivalent to 20 litres/m2 of new roof area or greater) that is plumbed to service the toilets
                        in the new building and landscaping areas. The design of the rainwater storage system shall be to the
                        satisfaction of the Manager Plumbing Services.

               36.      To ensure that polluted run-off does not enter Council’s stormwater drainage system or nearby creeks,
                        stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of
                        rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to being permitted to
                        discharge from the site.
                        All other clean stormwater, such as roof water, can bypass the grease/oil arrestor.
                        To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
                        shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
                        Works.
                        The approved maintenance plan shall be incorporated in the Management Plan for the development and a
                        copy of this shall be provided for Council’s records prior to commencement of the approved Use.
                        A Development Permit for Building Works shall not be granted until a Development Permit for Operational
                        Works has been issued in regard to the drainage scheme.

               37.      All site stormwater drainage shall be by means of a gravity system.
               Sewer Mains

               38.      The existing sewer main that traverses the site and the ‘zone of influence’ (taken as the area within a 45-
                        degree angle measured from the invert of the sewer main to the finished surface level) shall be accurately
                        located and determined by a licensed Surveyor and shown on all plans submitted for Operational Works
                        approval.




               SEP o:\database\onestop\decision.doc


                                                                                                                        Print Date: 7 April 2021, 3:41 PM
Log in to download the original file

Attachment 9 - Development Approval 21675 DA.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.