Original source · versioned page text
2016-06-29 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Revenue Statement - 2016/17
APPENDIX 2: NOOSA WATERS LOCK AND WEIR MAINTENANCE LEVY
OVERALL PLAN
1. Special Rate for the Maintenance of the Noosa Waters Lock and Weir
Maintenance and operation of the Noosa Waters canal system is the responsibility of Council.
Council has developed long term cost projections associated with the operations and maintenance
of the lock and weir system at an appropriate level of service.
2. The Rateable Land to Which the Special Rate Applies
The waterfront allotments in the Noosa Waters estate, as delineated in the map below.
3. Service, facility or activity
The service, facility or activity for which the rate is levied is the operation and maintenance of the
lock and weir system servicing the Noosa Waters Estate.
4. The Estimated Cost of Implementing the Overall Plan
The estimated cost of carrying out the overall plan is $837,000.
5. Estimated Time for Implementing the Overall Plan
The estimated time for carrying out the overall plan is a period of ten (10) years ending 30 June
2024.
It is anticipated that a levy will be made in future years as the service, facility and activities are on-
going programs.
2016/17 ANNUAL IMPLEMENTATION PLAN
The annual implementation plan for the 2016/17 financial year ending 30 June 2017 is to continue
the operation and maintenance of the lock and weir system servicing the Noosa Waters Estate.
The estimated cost of works proposed to be undertaken by Council this financial year is $60,000.
Page 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.