                                                                                               Planning Report
                                                                 Material Change of Use – Industrial Use Type 2
                                                                    85 Rene Street, Noosaville – Lot 4 SP244573


3.2.5     Staff

It is expected that the total on-site staff (full-time and casual) will comprise a total of 10 (ten)
as per table below.



                                Table 3 – Staff roles and numbers

        Role                                                 Number of staff

        Directors / Brewery & Operations Manager                      2

        Brewers                                                       2

        Bottling Leader                                               1

        Packaging / Dispatch / Deliveries                             3

        Tasting Room staff                                            2

                                            TOTAL                   10



It is anticipated that in the future sales representatives may be employed but they will be
mostly off-site and only accessing the site as visitors on occasions.



3.2.6     Environmentally Relevant Activity

Under the Environmental Protection Act 1994 (EP Act), the operation is determined as an
prescribed Environmentally Relevant Activity (ERA) requiring an Environmental Authority (EA)
licence to be obtained from Department of Environment and Heritage. The applicable ERA is
described below;



ERA 22(2) - beverage production - producing 1 megalitre or more of alcoholic beverages in
a year



At this stage the brewery will be producing less than 1 megalitre of beer in the first year.
Once the threshold production level of 1 million litres is reached, the operators will apply for
an EA.

Notwithstanding the above, the following table lists elements of the operation that would
ordinarily be addressed through an EA and in particular potential environmental impacts
that would need to be managed.




                                                                                                            13
Log in to download the original file

Planning Report_ MCU & OPW_revB.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.