                                                                                            Planning Report
                                                              Material Change of Use – Industrial Use Type 2
                                                                 85 Rene Street, Noosaville – Lot 4 SP244573


3.2.7    Car parking and service vehicles

Car parking is calculated on the following basis:

 Total use area                                                                      1,700m²

 Car parks provided (including disabled space)                                           26

 Industry use rates

 1 space per 30m2 , or part thereof, of use area, for areas up to 150m²                   5

 1 space per 50m2 , or part thereof, of use area, for areas up to 500m²                   7

 1 space per 100m2 , or part thereof, of use area in excess of 500m²                      12

 Motorcycle/scooter                                                                        2

 Food & Beverage Use

 1 space per 10m², or part thereof, of use area and outdoor dining area                       9
 (excluding kitchen and food storage areas). Use area = 100m²


If 13 carparks adjacent to the northern boundary are allocated for staff (in excess of the
number expected to be employed), then the 13 spaces located in front of the building can
meet the demand for the food and beverage use.



3.2.8    Operational Works

Operational works involves site earthworks, drainage, construction of car park areas and
landscaping.



Civil Engineering Design Drawings for Operational Works are included at Appendix 5 and
Landscaping Plans at Appendix 6.



3.2.9    Water and Sewer

A network analysis of the existing water and sewer infrastructure has been undertaken and
submitted to Unitywater for review. Unitywater is satisfied there is sufficient capacity in the
networks to accommodate the expected loads from the brewery operations. A separate
connection application will be made to Unitywater.




                                                                                                         15
Log in to download the original file

Planning Report_ MCU & OPW_revB.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.