20 June 2007 i

Our Ref: 060253T ken hicks

ANO ASSOCIATES

The Chief Executive Officer
Noosa Council

PO Box 141

TEWANTIN QLD 4565

Dear Sir

DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS ~— ENGINEERING
LOT 1 ON SP182880 - EENIE CREEEK ROAD, NOOSAVILLE

Please find enclosed a development application for Operational Works - Engineering
subsequent to Lot Reconfiguration approval 2006/1594 in respect of land described as Lot 1 on
SP182880.

in support of the application, please find attached three copies of the following:

IDAS Form 1 Parts A, E and Assessment Checklist (one copy only}:

Engineering plans prepared by Barlow Greg VDM;

Stormwater Management Plan Part A & B prepared by Barlow Greg VDM;
Operational Environmental Management plan prepared by Golder Associates:
Construction Environmental Management Plan prepared by Golder Associates;
Baseline Water Quality Monitoring Report prepared by Golder Associates;

Acid Sulfate Soil Investigation Report prepared by Golder Associates;
Landscape Management Plan prepared by Landgraphics;

Site Rehabilitation Management plan prepared by James Warren & Associates;
Public Open Space management Plan prepared by James Warren & Associates;
Fauna Management Plan prepared by James Warren & Associates;

Elf Skink Management Plan prepared by James Warren & Associates; and
Vegetation Management Plan prepared by James Warren & Associates

We request that Council determine the required application fee and advise this office in order
that we may arrange for payment to be made.

Should Council have any query regarding this application, please contact our office.

Yours faithfully
KEN HICKS & ASSOCIATES

\ Y
en

Scott Sobey
DIRECTOR

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS

Ken Hicks & Associates Pty Ltd | Suite 7 Dalton Centre, 1 Newspaper Place, Maroochydore BC QLD 4558, PO Box 6380, Maroochydore BC 4558
P 07 5443 2844 | F 0754437146 | A.CN.010 278823 | A.B.N. 74 308 405611
Full text of the other 111 pages

Page 2

LY

27 June 2007 .
Our Ref: 060253T ken hicks

The Chief Executive Officer
Noosa Council

PO Box 14]

TEWANTIN QLD 4565

Attention: Lyn Pearce

Dear Lyn

DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS — ENG!NEERING.
LOT 1 ON SP182880 — EENIE CREEEK ROAD, NOOSAVILLE — REC2006/1594

Further to our correspondence of 20 June and our subsequent discussions, please find
enclosed a cheque payable to Noosa Council for $16,346, being the required fee for
the development application for Operational Works — Engineering.

Should Council have any query regarding this application, please contact our office.

Yours faithfully
KEN HICKS & ASSOCIATES

  
 

28 JUN 2007
NUUSA
SHIRE COUNCIL

Scott Sobey |
DIRECTOR \

 

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS

Ken Hicks & Associates Pty Ltd | Suite 7 Dalton Centre, 1 Newspaper Place, Maroochydore BC QLD 4558, PO Box 6380, Maroochydore BC 4558
P 07 5443 2844 | F 0754437146 | A.C.N.010278 823 | A.B.N. 74 308 405 611

Page 3

Internal works — min fee . $840

External works (80m) 540
Earthworks (40,000 m3) 2815

Erosion & sed control plan check (22,750m2) 1306

As cons checking >4 lots : 330
Pavement design check 190

Ll Assessment of EMP (2 parts) 785
Assessment of 10 reports (10 @ $235) 2350

PLAN EXAMINATION FEE $9,156

1.21 Internal works — min fee - inspections $730
External works — min fee 730

Bulk Earthworks 1200
INSPECTION FEE : $2,[email protected] W&S — min fee -examination $890
Min fee - inspections 775
Checking As Cons 130

Live Sewer Inspection fee . 155

CCTV @ $5/m 2580

TOTAL 4,530

@

LP 25/06/2007 c:\documents and settings\aod2\local settings\temporary internet files\olk2e\quote.doc

  

Page 4

 

FACSIMILE TRANSMISSION

 

 

NOOSA COUNCIL 9 Pelican Street Tewantin File No:
P.O. Box 141 Tewantin Q 4565
Phone: (07) 5449 5200 Fax: (07) 5447 1062 Date:

[email protected]
Fax Number:

To:
Attention:

From:

Message: . .
[27] Pes Emme ¢8ae- mn Lr
e Field nsec tons - me €~
Ck AS Ga 4 0
lve Sswee bsg FSS"
cory CO gen £2,560 C516 ~ 5

 

“Peet &' S3L .

ai} eler

@

 

 

\, Number of Pages (Inclusive) | Original to Follow YES [| NO [|

Page 5

 

 

DATE: Friday, 15 007 FILE: <

 

TO: Lyn Pearce
C.c: <
FROM: Ron Read, Senior Technica! Assessment Officer
SUBJECT: Quote for fees - Garnéf Street Subdivision_— Op-Worke—
Plan Examination
pun Cer dus SE Syo
1.13 Internal works - $426-periat—424ets< -35040-— -
@ ' Saw$0b/ (60m) _.
1.15 external work =t50m.— 1%-of estimated-eest-ofexternat works S30
229EO

1.19 erosion &sediment control plan check — 46900m?
first 1000m? = $110

46900 / 200 = 79.5x$11=$874  /S/GE
24750 5 we 75x$u

 

 

$984 = /306 $984 /306
1.19 As constructed checking >4 lots : $330 v
1.19 Pavement design check 4s~0 m3 carte fee $190 vw
1b Gakritweres 7 33.070 mr” vwnfarhat fA $_} "2815 .
JAS ERRESSARE OY of boys HEF? SE —
@ Total Plan examination s) , Q/SG
Assessment of supporting documents .
1.1. assessment of EMP , JS (ror ents ~ | fe) $785
1.1. assessment of Stormwater Management Plan Xe) $235
k, et ; mte |d “Portal 8 " $1020
HidpeltaRe— Pe meget Mla - yee
1.21. internal works - Hope ot 42 ttre "346207 70
1.21 external works > LES rks $1 730
p.2i lorth.worly, Gout) Total inspections j ~
Ron Read
sin wetebinnn ph
me $7
Aa wk

me. | :
Vegetekie.  P> .

Page 6

LAG0
67° *

2S

12 TEe.
72,79 °

Page 7

e

INTEGRATED PLANNING ACT 1997

   

Pait E, Version 2.0, 4 October 2004

Form 1 Development Application

 

Operational &/or building work ke\'\—
assessable against a local government's planning scheme i

 

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

 

 

 

 

 

 

 

 

 

Nature of the application 1. This application is for (tick one (1) or both if appficable)
A development permit authorises Preliminary approval - provide details of F work rh,
development to occur, white a pretminary O eat app Provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process ;
and does not authorise development to occur. [
The types of work that are assessable against!
a planning scheme are determined by the AND / OR
sen vary fs 8 parbeulat local goverment and & Development f permit - provide defails of the type of work eg. roadwork, stormwater, water and sewerage
To determine the types of work that are - > —
assessable under a particular planning [ a D Sr€, wre Liver , cewik
scheme, contact the relevant local 7 ¥ ~
govemment. 2. Are the works subsequent to a previous development approval?
(no [KI YES - provide details of all previous approvals (e9. file references)
[ 2006/1594
3. _ Is the subdivision for a canal estate?
mae) (yes
ree Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable}
YES -
Prior to issuing a development permit for the O ES - complete 05
works, the assessment manager is required TINO - 05, 6&7 do not apply
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSLtevy (5. Has the PLSL levy been paid?
has bet id.
as Deen par (YES - completeas
[NO - the applicable fevy must be paid before @ development permit can be given for the works
6. How much was paid?
7. Whatis the receipt number of the payment?

 

 

L |

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (appiicabie fo assessment manager)

 

DATE RECEIVED

 

 

REFERENCE |
NUMBER/S

 

Page 8

 

 

INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
(i) Isa PLSL levy applicable in this instance? (No [DYES - complete off)
(ii)

Has the approved form {issued by Qleave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

(ino [11 YES - provide receipt details below

C |

Page 9

09/01/2006 83:46 61-7-54777323

S & L DEVELOPMENTS PAGE 82/63

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 
 

Form 1 Development Application

 

Common details &

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be acoompanted by the completed IDAS Assessment Checklist if
required, and by ona (1) or more other completed parts of the Form as requitad. For moro information on the parts of the Form refer to wew.ing.aid.gov.ay.
Any information requested in the form may be provided in an attachment to the application. For furthar information about complating the following details, rafer to Guide 4.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fnctudinghouse number, street name, suburtyiocality name & postcode) (if applicable)
All land the yect of the icabon, Must be . ,
tered Here, Tecate ote di rot | Eenie Creeek Road, Noosaville 4566
Cee as Reka heal (ERA) 2. Name of water body or watercourse, within which the development is proposed: ( epnicable)
Advice for completing Q2- 02 appies if . [NA
development is proposed within a water body or — =
Walacourse, 3. Lot on plan description (eg. Lot 123 on AP 4567)/ GPS coordinates:
Adyioa for completing Q3 - Most tand can be
identited by alton plan description. These dealt [ Lot 1 on SP182880 |
reat pasanooeniala documents or tough the) 4 The above description is for: (tick applicable box)
However, ifthe land on which the davelopmentis, (J); the land on which the development is proposed; Or
prope Goeth Pe on ae fie CC (ii) the iand adjoining the water body or watercourse, within which the development is
watercourse) provide - propased; or
® cancneeeon eds CC Gil) the water body or watercourse.

ii) GPS coord i
8 eeataraicatiog fer Main sey,  |5- Shop/tenancy number. 6. ‘Storey / level: 7. Total area of land: (m? or hay:
‘Adtuice for completing QI - 7 oes ith
development is within a water body ar ese ° LNA [ NIA _| [ 21.64ha J
Advctfaccomnieina Qt OBaoies ‘= |8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo et) ( apalcable)
tom ane ooh wir mebanaatumes, | [Noosa Shire _ |
focal government's 6fea unger
Local Goverment Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
peer ae potion cei — is proposed: (eg. Port of Brishene, Port of Townsvils) (if applicable) 1
port tend tidal area. For mora details refer to Guide 11 NIA .

Proposal details : 10. Existing use of the land: (eg. vacant, singte house, shop etc.)

ifthera is insufficient oom available, datits may be [ Child Care Centre |

provided ‘n an attachment to the application.

 

11. Proposed use of the land: (eg. 6 unit apartment buikting, 30 lot reskfentia! subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are rafeased into watars etc).

[ 5 lot subdivision __ |

 

 

 

Other applicable parts of Form 1 42, Other perts of Form 1 completed as part of this application: (ag. Part D, Part /, etc)
Part A must ahmays be accompanied by other | Part E |
completed parts of Form 1, For information about

 

when a part of Form 4 may apply rater to Guide 4

 

 

 

Appiicant details. 13. Applicant's name: 45. Contact person:
See einibetecuurcttelea [ S&L Developments Pty Ltd ] [Scott Sobey |
When signing and lodging this application 14, Contact number: 468, Facsimile number/e-mail address:

 

The applicant is responsible for ensuting the

information provides ls corect, The assessment 5443 2844 9443 7146 -
manager, any referral agency & the Chief Executive [email protected]

(where applicadie) will caly on this Informayon whan

 

 

 

 

 

 

 

 

 

 

assessing and deciding the application, 17. Postal address;
Hane aopcant in. a.comasny 2 crt psn [ Cr. Ken Hicks & Associates, PO Box 8380, Maroochydore BC Qld 4558 ‘|
18. Signature: 19, Date.
Se mf OD
Phifer il | UO tect *
F ay
is ~

 

Page 10

~

»
09/01/2086 03:46 61-7-54777329

 

 

 

 

 

S & L DEVELOPMENTS PAGE 93/83
INTEGRATED PLANNING ACT 1997 Part A. Version 2.4, 29 May 2008
Land owner's consent jf'epotcubie) | 20. Land owner's consent to the making of this application:
Sestion 3.2.1(3) of the IPA prescribes that an 7 te Date
application must contain, ov be supported by, the Name Signatu
waitten consent of the tand owners, iftha application

involve: (i) $&L Developments Pty Ltd

() amaterid change of use, .

(i) reconfiguration of a lot,

Gi) work on fand below high-water mark & not within a
canal as defined under the Coastal Protection and

| 2/e fe?

  

 

4 Act 199S;0r
(v) work on rat conidor land defined under the
Transport infrastructure Act 1954.
Section 3.8.1(2)(2) of the IPA provides that
Jandesmer's consant § Aot required for a mobile or

For morg information rafor to Guide 4

 

 

 

 

 

 

Resource entitlement {if applicable) 21. Does this application involve a State resource prescribed under a raguiation (other than involving
Seation 3,2.1(5) of the IPA requires evidence of quany materfal on Stete coastal land under the Coastal Protection and Management Act 1995)?

fesoul for applicator

Re EE ee ns Hl NO - go to @24 (71 YES - goto 022

action 3.2. Py i veo, . .
ponies eae en beacon 22, This application is accompanied by evidence: (tek applicable box)

witout evidence oft resourte enfieavent Ci () of the allocation of, or entitlement to, the resource - attach evidence and go fo Q25(v)

toe fo G2t & im . : oe att
Rear schaaule 10 of ha Infgy ated Pisoning (1 Gi) the chiet executive of the department administering the resource Is satisfied the
Regulation 1998 that prescribes tha nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go
required by the State in support of the lodging of thin fo Q23
development application.

(Cl dil) the chief executive of the department administering the resource is satisfied the
development application may proceed In the absence of an allocation of, or
entitternent to, the resource — go to Q23

Advice for conwieting 23 23, Evidence of the resource entitlement:
Tha information tn (1) - (v) ia mandatory if evidence is

required under C22 (i) o¢ (8) above, (i) Resource-entitlement / authority details (vii) Official stamp of the department
‘The offoil etamp af the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the 4

appiication Involvos any water or riverine quarty (i) Name of delegated officer .

material under the Water Act 2000. CO

Section 3 2.1(54) allyws the resource monager (0 limit

tha time the evidenca may be used. O23 (vi) must be

ae aeealt be evdenee tere trited (iii) Position of “estes officer

(iv) Signature of delegated officer

   

 

 

 

 

 

 

 

(v) Date
{vi) _ date of evidence f —_

Assesoment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
Thia checkist does mat apply ifthe appiiction requiros (J yes [INO - the assessment manager may refuse to accept this pplication on the
mst be comple ater plese " grounds thet the application has not been properly made
Plana / drawings | reports 25, Plans/drawingsireports accompanying this application:
aren ered banana surement Plan J Drawing / Report Number Title Date
manager, referral agencies and any person vigwing
the application during public scrutiny or pudtic

nofification to understand the scone of the proposal
and any potential impact,

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manages may refuse to accept an apotication that, at the time of lodgement, falls to provide al apptcable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's)

 

    

 

 

 

 

 

ir T RECENMING OFRICERS | 7: 7
BE (8) Receneb | ae NAMES | hi NUMBERS
: Notification of Engagement of Private Certifier (Optional format)
| To Counc. ! have been éngaged as the privala oertifier for the building work referred fo in this anpiication,
| Date afengagement { / — Accreditation Number. _ Name; Signature:

 

 

Page 11

INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 20, 2 April 2007

     

Form 1 Development Application

IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. — Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queenstand State entities (e.g. Environmental Protection
Agency, Dept of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

4. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

5. Itis the responsibility of the applicant to accurately complete this checklist.

6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8, The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination.

9. — Toassist you in answering the following questions a series of quides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the [DAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.atd.gov.ay,

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

“Note: The following state assessment triggers apply to development other than for bullding work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4. (Qi) an environmentally relevant activity (ERA) for which a code for environmental compliance
pass you answered "none ofthe oe tot, has not been made - complete Part G of Form 1

1e application requires assessment e 7 — 7 . .
administering authority?. C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has nof been
If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the XK (iii) none of the above

application, the administering authority is a
Concurrence agency for the apptication in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part K; of Form 1
for approval where an allocation under the Water|
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (appiicabie to assessment manager)
DATE RECEIVED REFERENCE NUMBERIS |

 

 

1 The assessment manager Is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed In schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?*

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (far a devolved ERA) or the Queensland Department of Primary tndustries and
Fisheries (for a delegated ERA).

N

Page 1

Page 12

INTEGRATED PLANNING ACT 1997

State-controlied road matters

For more information refer to Guide 3.

Unies you answered “none of the above” to Q2,
the apptication triggers referral to the Department
of Main Roads (DMR) as a referral agency.

In certain circumstances DMR will be an advice
agency, while in other circumstances OMR wik
be a concurrenca agency.

Schedule 2 of the [P Requtation will assist you to
determine where DMR is an advice or
concurrence agency for the apotication.

IDAS Assessment Checklist, Version 20, 2 April 2007
2. The application involves: (tick applicable box/es)
(1 (i) development on land contiguous* to a State controlled road and for -
LD (2) material change of use assessable against the planning scheme;
LD (b) reconfiguring a fot unless -
« the total number of lots is not increased; and
+ the total number of lots abutting the State-controlled road is not increased;
C1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
UO (ii) development on land not contiguous to a State-controlled road and -
(1 (a) material change of use —
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

LC (b) reconfiguring a tot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

[X (iii) none of the above

 

Clearing vegetation
For more information refer to Guide 12.

Unlass you answered "none of the above" to 03,
the application sequires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.

If you ticked Q3{i) or (ii), your application requires,
referral to NRW for assessment regardiess of
whether vegetation clearing is proposed or not.

3. The application involves: (tick applicable box/es)
(i) material change of use —
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;

(c) where the existing use of the land is a rural or environmental use; and

(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

reconfiguring a fot -

(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no praperty map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - compiete Part J of
Form?

XJ (iv) none of the above,

Dii)

Diy

 

Strategic port iand

For more information refer to Guide 14.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

4. The application involves:

(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

(C1 (i) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part! of Form 1

(iii) none of the above

 

4 Land contiguous to a State-controtled road Is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of tha State-controlied road; or that Is part of a future State-

controtied road.

Page 2

Page 13

INTEGRATED PLANNING ACT 1997

Acid sulfate soils 5.

For more information refer to Guide 10.

Unless you answered "none of the above" to 05,
the application requires assessment by
Oepartment of Natural Resources and Water
(NRW).

It an agency other than NRW is the assessment
manager for the application, NRW Is an advice
agency for the application in relation to this
matter.

 

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

lf you answered "YES" to Q6, the application
fequires assessment by the Department of
Emergency Services (DES).

lf an agency ather than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
elation to this matter.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified® local govemment area
and where the surface of the land ts: tick appficable box)

(Qi) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below Sm AHD, or

(ii) at or below 5m AHD and the development will involve filling the site with 1000mé or more
of material

O (ii) none of the above

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

No
(1 YES - compkete Part L of Form 1

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
{g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above” to Q7,
the application requires assessment by the
Cepartment of Natural Resources and Water
(NRW).

if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Removal of quarry material from a 8.

watercourse
For more Information refer to Guide 16.

\fyou answered "YES" to Q8, the apptication
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the appilcation, NRWis a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse Is also an
Environmentally Relevant Activity (ERA).

 

The application involves:

CI (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(lick applicable box/es)

(1 (@) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ke, Ks, or Ke of Form 1 whichever is applicable;

C1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1,

(1 () for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 1;
and/or domestic purposes - complete Part K of Form 1;
(J €e) for taking overland flow water in certain areas covered by a water resource plan
(1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1
of a referable dam by more than 10% - complete Part Ks of Form 1; or
Bd (ii) none of the above.
requiring an allocation notice under the Water Act 2000?
No

(1 () for a subartesian bore, in certain declared subartesian areas, for use for stock
- complete Part Ks of Form 1;
(1 QQ) for constructing a referable dam? or works that will increase the storage capacity
Does the application involve development for the removal of quarry material from a watercourse?
(17 YES - complete Parts Kr and G of Form 1

5 The identified local goverment areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, !sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australlan Helght Datum (AHD).

Referable dam Is defined under the Water Act 2000.
Watercourse is defined in sch 10 of ihe IPA.

Cone

The dectared ground water areas are listed in Guide 13 Development in a dedared catchment area,

Page 3

Page 14

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable bowes)
work in coastal management district C1 (i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
more information about ee workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local goverment tidal areas refer to Guie 24 (Gi) tidal work that is prescribed tidal work"! other than in a canal'2 -complete Part P of Form 1; or
tector mene pnianiee %. C (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
lf an agency other than EPA Is the assessment U1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
isla ieicenaaee te be apateaten in other than those works in tidal water) where the development has been determined not
felation to this matter. to be assessable against the Water Act 2000 ;
Cetera assess ment manager (1) constructing a canal’? intended to be connected to tidal waters;
all prescai lidal wor
, (©) constructing an artificial waterway;
(1 @) reclaiming land under tidal water;
(1 (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (f) _ interfering with quarry material on State coastal land above high-water mark;
(2 @) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
[1 () _ constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
(iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark i) ti 13 i
For mora information refer to Guide 18. For (1 (i) tidal work as defined under the Coastal Protection and Management Act 1995 (the
mare inforation about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
ine govemment ital areas oe i ued D Gi tidal work that is prescribed tidal work’ - complete Part P of Form 1; o
QMO Pe apgeat toe tora to ® ( (ii) carried out within a coastal management district'5 under the Coastal Act and for -
upersane Tansoon (2 Matline Satty D(a) disposing of dredge spoil or other solid waste material in tidal water - compiete Part
Local government is the assessment manager M of Form 7;
for alt prescribed tidal work. CO (b) reclaiming land under tidal water - complete Part M of Form 1; or
(©) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
XI (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For mare information refer to Guide 18, LQ) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of ihe above" fo work carried out completely or partly in a coastal management district's
Q11, the application requires assessment by the _ . .
Environmental Protection Agency (EPA). Odi) a materia! change of use assessable under a planning scheme involving building
Wan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is ~
manana fr Feat e aopfesion in « the construction of a new premises with a GFA® of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
DO (iii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
LC () reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal"? - complete Part M of Form 1
EX (v) none of the above

 

 

10. Tidal work Is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA,

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidai works completely or partly within a local goverment tidal area.

15 Coastal management district is defined in sch 10 of the {PA and means a coastal management district under the Coastat Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA Is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to caiculated GFA, go to the planning scheme against which the application is being assessed.

417 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
eecompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 15

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more Information refer to Guide +8. For

information about prescribed tidal work refer to

Guide 24,

If you answered “YES" to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is ~

* within 200m of a shipping channel or an entry
and exit shipping corridor for the port

= within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds:

«within 1000m of a planned port facility
identified in a land usa plan approved under
the Transport Infrastructure Act 1994.

In ail other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

NO
(YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidat work refar to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

Ifyou answered ‘YES" to Q13, the application
triggers referrat to Queensland Fire and Rescue

Service as an advice agency.

43. Does the application involve operational work that is tidal work for a marina’ with more than 6
vessel berths?

XI No

(YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18,

Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT)

are concurrence agencies for the appfication.

14. Does the application involve tidal works within a strategic port land tidal area?
XJ] No

(DYES - complete Part M of Form 1

 

Heritage
For further information refer to Guide 19.

lf you answered "YES’ to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered "nane of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

NO
(1 YES - complete Part C of Form 4

15(b)The application involves: (tick applicable boxes)
(i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
C1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
[X (iii) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

\f an agency other than NRW is the assassment
manager for the application, NRW Is a
concurrence agency for the application in
relation to this matter.

 

16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
(i) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;
(i) development assessable against the planning scheme involving the establishment or

expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

{X] (ili) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
49 Marina Is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generaily 50 metres seaward of high water mark adjacent to strategic port land,

Page 5

Page 16

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

Contaminated land 17. The application involves: (tick the appicable box/es)
Applications i i - . . .
sao earn cnet oo reconfiguring a lot for which all of part of the premises are -
referral. (a} premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5. + item 5, including the exemption otherwise provided for by paragraph (d);
Untess you answered “none of the abave" to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an activity; or
agency other than EPA is the assessment '
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1
elation to this matter.
1 (i) a material change of use —
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
KX (ii) none of the above
Etectricity infrastructure 18. The application involves: (tick the applicable boxes)
—_, ‘afer fo schedule 2of the IP (O@ reconfiguring a lot where any part of the lot is —
Unless you answered ‘none of the above" fo subject to an easement in favour of a distribution entity or transmission entity under the
018, the application triggers referral to the Efectricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is qranted in that Act; or
favour of as advice agency. « situated within 100m of a substation site;
(ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement:

O (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if —
any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land

infrastructure

Applications involving development on land
designated for community infrastucture may
trigger this referrat.

For more information refer to schedule 2 of the
IP Requiation.

If you answered “YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
lf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

designated for community infrastructure?
(i) intended to be supplied by a public sector entity, and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
XI NO
CIYES

 

Page 6

Page 17

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedute 2 of the
IP Requiation.

Refer to Chapter 2, part SA and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above" to
Q20, the application requires assessment by the
Offica of Urban Management (OUM).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
1 @ amateriat change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
OO @)  anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;

(4 inan area not included in a structure ptan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; or

* the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
OO (ii) intensive animal husbandry, or

OO (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
0 (i) anurban activity and not specified in section 2.4(2); or
0 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the investigation Area for -
OO @)  anurban activity and not specified in section 2.10(2);

1 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
OD (ii) intensive animal husbandry

Oi) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
(iii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the IP
Regulation,

Unless you answered “none of the above" to
021, the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F).

If an agency other than DPI&F is the assessment
manager for the application, DPI&F Is a
concurrence agency for the application in
relation to items (i) - {iv) and an advice agency
in relation to item (v).

21. The application involves: (tick the applicable box/es)
((i) an assessable material change of use for aquaculture - complete Part 0; of Form 1;
(ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
OD (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
[) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
[1 (vi) none of the above.

 

 

Page7

Page 18

INTEGRATED PLANNING ACT 1997
Integration of fand use and public
transport

For more information reter to Guide 23, schedute
BA of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

Raitway safety and efficiency

For mora information refer to Guide 23, schedule
BA of the IPA & schedule 2 of the IP Regulation,
Untess you answered “none of the above’, the
application triggers referrat to QT as a
concurrence agency.

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the |P
Regulation.

Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 Issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice,

 

23.

24.

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

22. The application involves: (tick the appficable box/es)—

LO (i)a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that
schedule.

D (i) reconfiguring a tot—

C1 (a)_— ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;

[J (b) _ ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;

O(c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

[1 @) _ fora residential purpose within the 25 ANEF contour for an airport;

Cle) fora residential purpose resulting in 100 or more allotments,

(1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lat mentioned in (ii)
above, on land that—

(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
[1 (b) _ will result in work that encroaches into an airport's operational airspace.

EX] (iv) none of the above.

The application involves: (tick the applicable box/es)—

C (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule,

D (ii) reconfiguring a tot—

(a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,

[1 (c) _ on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

(Od) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

(Ce) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

((f) — fora residential purpose resulting in 100 or more allotments.

CO iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—

C1 (@) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;

[1 (c) abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
[XI (iv) none of the above.

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

LD (ii) reconfiguring a tot

LO (il) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

&X (iv) none of the above.

 

Page 8

Page 19

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Reguiation.

Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

Wild river area
For more information, refer to Guide 27

If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
iver area because the application cannot be
accepted by the assessment manager.

25.

26.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves: (tick the appicable box/es)—

( (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(1 (@) clearing of native vegetation over an area greater than 2500m?;

(2) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;

1 () anextension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;

CJ) extracting gravel, rock or sand from an area greater than 5000m2;

(1) excavating or filling an area greater than 5000m?;

(1) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

0 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(1 @) anincreased number of lots;
(G (b) clearing of native vegetation over an area greater than 2500m?.

0 (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?,

C (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(1 @) clearing of native vegetation over an area greater than 2500m2;
(1 () extracting gravel, rock or sand from an area greater than 5000m?,
(1 (c) excavating or filling an area greater than 5000m2.

KX] (v) none of the above.

Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

No

COYes

 

Preliminary Approval
Ifyou answered YES to Q27, the application
triggers referral to the Department of Local

Govemment, Planning, Sport and Recreation as
an advice agency.

27.

Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?

No
(Yes

 

Wetlands

Domestic activity means the construction or use
ofa single residence on a lot and any reasonably
associated building or structure. Examples of a
‘building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
Structure used for a home business.

Note: Wetland is defined in the Integrated
Planning Regulation 1998.

Unless you answered ‘none of the above" to
Q28, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

28.

The application involves: (tick the applicable boxes) -

(1 (i) amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
D (ii) reconfiguring a tot -
In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created; or
(2 (0) lots less than 5 hectares;
XX (iii) none of the above

 

Page 9

Page 20

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, inchxding residential,
industrial, sporting, recreation and commercial
purposes, but not Including environmental,
conservation, rural, natural or widemess area
purposes”.

Unless you answered ‘none of the above" to
Q29, the apptication involves referral to the
Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
0 @ a material change of use for urban purposes that is in or within 100m of any of the
following -
[J (a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(J (b) a State forest or timber reserve under the Forestry Act 1959;
LI (ce) a marine park under the Marine Parks Act 2004;
(1) arecreation area under the Recreation Area Management Act 1988;
(Ce) a world heritage area listed under the World Heritage Convention;
(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
D (ii) reconfiguring a lot if -
D(a) any part of the lot is situated in, or within 100m of, any of the following -
1)  aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;

Ci fii) a State forest or timber reserve under the Forestry Act 1959;

O (ili) a marine park under the Marine Parks Act 2004;

(J (iv) arecreation area under the Recreation Area Management Act 1988;
[1 W) __ aworld heritage area listed under the World Heritage Convention;

Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1 (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha;
(&] (iii) none of the above.

 

Page 10

Page 21

ib

20 June 2007 ken hicks

Our Ref: 060253T AND ASSOCIATES

The Chief Executive Officer
Noosa Council

PO Box 14]

TEWANTIN QLD 4565

Dear Sir

DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS —- ENGINEERING
LOT 1 ON SP182880 — EENIE CREEEK ROAD, NOOSAVILLE

Please find enclosed a development application for Operational Works - Engineering
subsequent to Lot Reconfiguration approval 2006/1594 in respect of land described as Lot 1 on
SP182880.

In support of the application, please find attached three copies of the following:

IDAS Form 1 Parts A, E and Assessment Checklist (one copy only):

Engineering plans prepared by Barlow Greg VDM;

Stormwater Management Plan Part A & B prepared by Barlow Greg VDM:
Operational Environmental Management plan prepared by Golder Associates;
Construction Environmental Management Plan prepared by Golder Associates;
Baseline Water Quality Monitoring Report prepared by Golder Associates;

Acid Sulfate Soil Investigation Report prepared by Golder Associates;
Landscape Management Plan prepared by Landgraphics; |

Site Rehabilitation Management plan prepared by James Warren & Associates;
Public Open Space management Plan prepared by James Warren & Associates;
Fauna Management Plan prepared by James Warren & Associates;

Elf Skink Management Plan prepared by James Warren & Associates; and
Vegetation Management Plan prepared by James Warren & Associates

We request that Council determine the required application fee and advise this office in order
that we may arrange for payment to be made.

Should Council have any query regarding this application, please contact our office.

Yours faithfully
KEN HICKS & ASSOCIATES

yen

Scott Sobey
DIRECTOR

 

TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS

Ken Hicks & Associates Pty Ltd | Suite 7 Dalton Centre, 1 Newspaper Place, Maroochydore BC QLD 4558, PO Box 6380, Maroochydore BC 4558
P 07 5443 2844 | F 07 54437146 | A.C.N.010 278823 | A.B.N. 74 308 405 611

Page 22

 

SAS (Cashier: Ph

 

 

DEVELOPMENT FEES & CONTRIBUTIONS
» Return to Admin Officer, Development)

 

 

     

APPLICATION AND GENERAL FEES

RECEIPT TYPE sense Da kcina ociwC - Cee

 

 

 
       

 

 

 

 

     

 

Application Fees 540 Payee Name:
Road / Drainage Plan Exam 9156 541 Address:
Road / Drainage Field Inspection O §42
Legal Document Examination 543
Sealing Fee - Survey Plans, Legal Documents 544
545 CALCULATIONS

 

 

Sale of Documents, Policy Lists, Misc a
Bonding Admin Fee (Contributions, uncompleted works)

 

 

Closed Circuit TV inspection

546 Lot Calculation
588

 
  

 

 

  

 

 

 

 

 

 

 

Pre-lodgement Meeting Fee 549

CONTRIBUTIONS AMOUNT RECEIPT TYPE | Plan Examination Calculation
Developer Contribution - Landscaping 550

Developer Contribution - Road Other than PSP §53

Developer Contribution — Drainage Other than PSP 554

Developer Contribution — Pathway Other than PSP 685 Inspection Caiculation
Developer Contrib. ~ in Lieu Off St Parking (PSP13 Car parking) 556

  

 

 

Developer Contribution - Other Parks and Community
ICS - Community Land (Not currently active)

 

   
 
   

 
 

ROADWORKS CONTRIBUTIONS
Catchment:

    

 

 

ICS - Public Transport
ICS - Sewerage (PSP Rural)

  

 

 
 

 

Road/Section:

 

 

 

 

  

 

 

 

   

 

 

   

 

 

 

 

 
 
  
 

 

 
 
  

ICS - Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) If BA not entered then use 594
ICS - Pathway (PSP)

 

    
 
 

Total of Fees Paid (Excluding Bonds)

  
  
 

$

CPI Date: .
Security Deposits/Performance/Maintenance/Uncompleted Works Bond

 

Total of Fees Paid (including Bonds)

SUS IG

P:/Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

ICS - Sewerage (PSP Coastal) 613
ICS — Sewerage - South Peregian (PSP Marcochy) 681 APPLICATION DETAILS -
- tt
ICS - Water Supply (PSP) 614 PayeeName: O-; 1 Deus cocmenrs ple
ICS - Sport and Recreation Land (PSP Parks) 559 Address:

  

AMOUNT _ | RECEIPT TYPE | File Numbers or Reference:
51 (Cat 9) Te 2007. | QU2+\

  

cl- Ken Wes ao Acgoc.
fo Rox 6350

MAPRCOCHUY DORE
Development Location: |
Ad's \\

Ecgave Cate

4SS&

 

Date application properly made:

[ Receipt No: 4 $30 ¢ _ [Receipt Date:

 

Page 23

WATER & @ race WORKS
i NOOSA COUNCIL PAY-IN SHEET / TAX INVOICE

PO Box 141, Tewantin, Q 4565

 

 

 

 

 

 

ABN 97 969 214 121 Please present to Cashier when making payment
GST Anoeat Receipt Type JOB DESCRIPTION
20s? 18 0 Sper N/A | a0 38s
WateyScwerage Feld nspetin wa | 355 |
Live Sewer Inspection (2006/07 $155.00) N/A Iss 586
CCTV Inspection (2006/07 $5.00/lineal m) | wa | ese 588
Checking as-constructed data (2006/07 $130) N/A so 586

Water Connections (incl. relocation of meter) N/A

Water Meter Testing - $55 (20&25) $280 (larger) N/A

|

|
PRIVATE WORKS & OTHERS -
Water 590
Sewerage W4395.901.782
Sewer manholes 115
Sewer as-constructed plan (2006/07 -$8 incl of 73¢ GST) 116
Lock & Weir Key (2006/07 $55/$110 incl of GST) 214

—___|

—————
Name | Ser L Devecotiments Date Paid: ag ob Jo.
cl- bon Hele PORHERBO Marmmoakytal GST $

; cto Receipt No: x 4 SSO af
[4 ‘200? - (2462 “\ Total inel. GST $ t+ Cashier - please return form to W&S Section

‘CDocuments and Setfingstaod|\Local Settings\Temporary Internet Files\OLK2AWS Payment Schedule green - memo fax templates doc

 

 

 

 

 

 

 

 

 

Page 24

 

 

 

 

 

 

 

 

 

JAMES WARREN & Associates Pty Ltd e

 

 

® ®@
ENVIRONMENTAL CONSULTANTS War

VEGETATION MANAGEMENT PLAN

LOT 1 RP215933, EENIE CREEK ROAD

NOOSAVILLE

JUNE 2007

A REPORT TO KEN HICKS & ASSOCIATES PTY LTD

 

 

Brisbane Office Head Office Sunshine Coast Office

Suite 28 Cathedral Village PO Box 490 Office 12 Caloundra City Centre
115 Wickham Street ALSTONVILLE NSW 2477 514-55 Bulcock Street
FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778 CALOUNDRA QLD 4551

PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011

Fax: (07) 3257 2708 Fax: (07) 5437 8022

Page 25

3

- Vegetation Management Plan

 

 

 

TABLE OF CONTENTS
1 INTRODUCTION. ..........ccecccecccecccccccccscccccvccenecscenssseescsoenons 2
1.1 BACKGROUND .......ceccccscsccscccececscscsccenseescessenecssceseceseeseeeeeecene
1.2 SITE DESCRIPTION .....ccccccccccccccccccnssccscnseeeensevcccoeres
1.3 FORMAT OF THIS MANAGEMENT PLAN .
2 PROGRAM OF WORKS .........ccccccccccscesscccscccscscecctecrecrseereese
3 STATEMENT OF OBJECTIVES............ccccccccvceccccceccvcccccvees vee D
4 VEGETATION PROTECTION AND CLEARANCE MANAGEMENT......... 6
4.1 INTRODUCTION ........cccscscecesccceccccecncescnceseeseceeseseesneeeseseeseenenes 6
4.2 RECOMMENDED GENERAL MANAGEMENT ACTIONS .......sccccsecesccecesscvcesece 6
4.3 PROTECTION OF RETAINED VEGETATION .......scecececececccececsoreenscesessoers 6
5 PREVENTION OF EROSION AND SEDIMENTATION. .........0ccsecseeses 8
6 WEED SPECIES MANAGEMENT. ........scccsccccccceccccecccceecccenscssens 9
7 DISPOSAL OF DEBRIS ............cceccccscccccssccscsccencccccevoscsceeees 10
8 CONTROLS / CORRECTIVE ACTIONS ...........cccecscessceseees seseeee 11
9 PERFORMANCE INDICATORS ...........0+0005 cece eecacnenccenecseenaee 12
10 MONITORING AND REPORTING. ............ccccssccecscecssecveccescenes 13
11 REFERENCES. .............ccecceessceee se encesecseneccesesseones seeesceeecce 14
APPENDIX 1 TREE PROTECTION GUIDELINES..........scsscescessesscnsee 15
Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 1

Page 26

a
2

Vegetation Management Plan

 

1 INTRODUCTION
1.1 Background

James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates
Pty Ltd to prepare a Vegetation Management Plan (VMP) for the proposed
development site at Eenie Creek Road, Noosaville.

The subject site forms a part of land envisaged to be developed as the Noosa Shire
Business Centre (NSBC), The NSBC, including the subject site, is the subject of
Master Plan Stage 2 (MP2), which sets out future land uses within the NSBC. Stage 1
of the NSBC occurs immediately to the east of the subject site and is currently
under development. A number of vegetation surveys and management plans were
completed as part of the Stage 1 development process and which are relevant to
this VMP. These include:

¢ WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment
Study;

e URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre
Environmental Management Plan;

e URS Australia Pty, Ltd. (2003) - Concept Stormwater Management Plan;

e Chenoweth Environmental Planning and Landscape Architecture (EPLA)
(2004) - Vegetation and Landscape Report; and

e Landscape Assessment, Management and Rehabilitation Pty Ltd. (2004)
- Flora Report (Planning and Environment Court report for Appeal no.
48 of 2003).

1.2 Site Description

The subject site is located at Eenie Creek Road, Noosaville and is described as Lot
1 on RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded
by Eenie Creek Road to the north, industrial development to the west, Eenie Creek
to the south and Stage 1 of the NSBC to the east. The subject site is approximately
21.47 hectares (ha) in area.

The topography of the subject site is slightly undulating and generally slopes to the
south towards Eenie Creek. Numerous depressions occur throughout the site,
particularly within the lower-lying areas to the south. A drainage lines occurs
within the eastern portion of the site, which joins to a drainage line within Stage 1
of the NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at
RL 2.8 m level (URS 2006). After prolonged rainfall, ponding of water occurs within

‘ depressions along the drainage line, predominantly below Q100 (URS 2003). A small

constructed dam is located in the central portion of the site.

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the
southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera)
occur in the northern portion. Much of the vegetation within the site was cleared
during the 1970’s and subsequent regrowth vegetation has been subject to
frequent fire events. An aerial photograph depicting vegetation coverage is
presented in FIGURE 2.

 

Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 2

Page 27

 

 

 

   
 

REEF

 

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

 

 

 

 

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

DATE: 06 June 2007
FILE: Q06030_VMP_Locality.cdr

 

s) |g
Ap)
Ae
we
3
Noosa
Res
Prvato
Para
hve
‘@ Cithouse
Lake
Weyba
Legend
Subject Site
[1] Noosa Shire Business Centre
0 500m.
(eee
- , CLIENT TITLE
pOURCE: Prsvane ED) Ken Hicks & Associates Pty Ltd FIGURE 1
; PROJECT
SCALE: 1:20000@A4 Vegetation Management Plan PREPARED: BW LOCALITY
Lot 1 on RP215933 ; PLAN

 

 

Page 28

 

 

0 100 200m
SI

Legend
Subject Site
Noosa Shire Business Centre

 

 

 

 

 

 

 

 

SOURCE: Google Earth 2006 Aerial Photograph

SCALE: 1: 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Vegetation Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 2

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_VMP_Aenal.cdr

 

TITLE

AERIAL
PHOTOGRAPH

 

 

Page 29

 

 

i op
J Vegetation Management Plan
A child-care centre and other associated built infrastructure occurs within the
i northern portion of the site. In addition, numerous vehicle tracks occur throughout
the site.
i The approved layout plan for the Subject site is shown in FIGURE 3.
1.3 Format of this Management Plan
i This Plan is comprised of the following sections:
i ¢ Section 2 _ Program of Works
e Section 3 Statement of Objectives
e Section 4 Vegetation Protection and Clearance Management
J e Section 5 Prevention of Erosion and Sedimentation
@ e Section 6 Weed Species Management
e Section 7 Disposal of Debris
i e Section 8 Controls/Corrective Actions
e Section 9 Performance Indicators
e Section 10 Monitoring and Reporting
i Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 3

Page 30

 

L

oo00e

 

 

 

S{UDJJNSUOZ JOJ/UaWUOXAUZ
GLUT Ald SULVIDOSSV 9 NJ8YVM SIWYE

3WOS

ev © 000€
aur] vogepunu} poolj SYN ‘UPd'z0S080] wo)

$2 LOTM3N WM 4 ued puawy ¢-| S}o)

 

d01490S090 42u) ‘20ssy 9 SyDIH Yay “3OYNOS

 

 

W917 1OUNOD auIUS eSOON

10 ‘ailIAeSOON ‘peoy ¥2219 d1UeR

£E6Sb7dy UO | 107

Ub|g juawabeuey uo|elabe,,

193f0'd
4N3I19

PIT Aig sayeossy 9 SyDI}H Uay

 

 

 

LNOAV1
LNSWd013A30
qgasOd0Oud

zSa
z
mao
8o5
SSm
8<3 =
Paw Q
Smai Cc
Ss
5S | a
3
8 m
2
FS
2 wo
3
=
2
=
=
3
re
m

 

AAT
oe
ON oe
Ons

Qa

 

/
RP230888

 

a

P230888

 

3

RP230888

252

MCH 4539

253

MCH 4539

 

254

MOH 4539

255

oJ
3

MCH 4539

 

 

256

MCH 4539

 

257

MCH 4539

274

MCH 489!

258

MCH 4894

 

367-402

304

$P10432/

 

305

SP10432/

306

SP104321

 

307

SP10432/

NE STREET |

279
cps6si80 ==
ais
318
By
902
SPI63309

3/903

 

 

 

 

2:-58tha

270°00'SS
=&
pe
pean
|e
| SZ
sey 1 4
ree
"O6'S0"
17-872
2 |:
8
2:735 ha g

RP OSIO!

 

2.69.64!
Beeb)
ois2P!

62.68.64

ura

NEW ROAD

 

 

2:084 ha

 

 

53

SP16 357)

 

 

   

NEW ROAD

PENDING SP/82880

   

 

 

  

   
      
   
  

NEW ROAD

PENDING SPIB288O

DIAG A

‘Wer To Scomw

s39°39 09
3007

206°39'39
4 595

 

 

2
5 SPI679TA
“. | BB
\ °
D
=
x
9

ereci@e

  

5 4 90°01'30
f 35-069
2617 ha |
K
1 | \
|
|
| ye
of
| uo
|
ls r
RES
84
lw
So
|
13.704
Ts

 

 

Page 31

Vegetation Management Plan

2 PROGRAM OF WoRKS

2.1 Vegetation clearing will be carried out as part of the Operational Works for
the approved Rol application over the subject site. FIGURE 4 shows
indicative vegetation to be retained/lost within the subject site.

2.2 In addition, trees will be retained within residual road reserves, where
Practicable and within areas designated as ‘Preservation of Visual Amenity’
on the approved MP2. Vegetation will be retained within Open Space Areas
in accordance with the Public Open Space Management Plan (POSMP) (JWA
2007) as follows:

Open Space (Conservation and Waterway Protection):

The OS2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facitities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency
vehicles and Council maintenance vehicles. All unnecessary existing tracks and
trails will be closed off and rehabilitated and vehicle access points will be limited
to as few as possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created
within this area to provide access for fire fighting vehicles and to ensure
compliance with bushfire management objectives. This fire break will have a
minimum width of ten (10) metres, which will involve the clearing of all
vegetation. Other fire breaks will be created within this Open Space area, however
these will require the clearing of vegetation to a four (4) metre width. The location
of all fire breaks will take into account the requirement to retain habitat trees,
where possible.

Open Space (Preservation of Visual Amenity):

The Open Space 0$3 and OS6 areas will be retained primarily for screening
Purposes. Proposed works within these areas shall be limited to minimal
landscaping and supplementary plantings of endemic species. Adjacent
infrastructure such as footpaths, lighting and signage and stormwater control
devices/measures may be included as part of the detailed design stage however,
shall not adversely impact on the existing native vegetation.

 

Q06030/AM/VMP/RW6 JAMES WARREN & ASSOCIATES PTY LTD 4

Page 32

 

-@

 

e

 

Legend
B1 BUSINESS
(Retail Centre & Business)
B2 BUSINESS
(Car Parking & Offices)
B3 BUSINESS
(Showroom, Offices & Business)
E1 EMPLOYMENT

(Technology Based R&D Business Offices & Civic)

E2 EMPLOYMENT

(Educative & Environmental R&D Business & Offices)

E3 EMPLOYMENT
(Environmental R&D Business & Offices)
E4 EMPLOYMENT
(Industry & Business)
ES EMPLOYMENT
(Industry & Business)
E6 EMPLOYMENT
(Business Offices & Transit)
E7 EMPLOYMENT
(Business & Offices)
0Ss1 OPEN SPACE
(Environmental)
OS2 OPEN SPACE
(Environmental)
0S3 OPEN SPACE
(Preservation of Visual Amenity)
os4 OPEN SPACE
(Environmental Drainage)
oss OPEN SPACE
(Preservation of Visual Amenity)
osé OPEN SPACE
(Preservation of Visual Amenity)
OS7 OPEN SPACE
(Environmental Drainage)
RES RESIDENTIAL
(Employment Support)

REC/MU RECREATION MINOR MIXED USE

(Minor recreation / minor mixed use or open space)

Bicycle Path
Walking Path
RL 2.8

——=— RL3.0

Vegetation Legend
[__] Vegetation to be lost
Eg Vegetation to be retained

Noosa Shire Business Centre

DRAFT 06.06.07

 

 

 

Ganim Lawyers (05.04.04) (Ref: Stage2Master
planv6.pdf); URS Flood Inundation Line
SCALE: 1: 5000 @A3

 

JAMES WARREN & ASSOCIATES PTY UMITED
Environmental Consultants

 

 

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd FIGURE 4
PROJECT

Vegetation Management Plan PREPARED: BW

Lot 1 on RP215933
Eenie Creek Road, Noosaville, QLD DATE: 06 June 2007
Noosa Shire Council LGA FILE: Q06030_VMP_Overlay.cdr

 

 

TITLE
INDICATIVE

VEGETATION LOSS
& RETAINED UNDER
MASTER PLAN (MP2)

 

 

 

Page 33

Vegetation Management Pian

 

3° STATEMENT OF OBJECTIVES

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

3.11

3.12

Tree clearing shall commence as soon as possible after Operational Works
approval for the subject site has been granted by Council and the site has
been properly prepared for clearing operations.

Tree clearing shall be carried out in accordance with approved documents
and Council conditions.

Implementation of vegetation clearance, stockpiling, recycling or disposal
practices that maximise the re-use of native vegetation and minimises the
potential for spreading weed species.

If individual trees or other specific vegetation that require protection are
identified in land adjacent to a clearance zone, such protection shall be
provided. Within the development area, all areas of vegetation and
individual trees to be retained shall be clearly marked.

Designated Open Space areas are to be clearly marked and demarcated with
orange webbing for the purpose of preventing access to these areas thereby
protecting vegetation and habitat vatues.

Within open space areas no native vegetation shall be cut down, lopped,
damaged, disrupted or adversely affected without prior written consent of
Council.

Prior to the mulching of cleared vegetation stockpiled on site, the stockpile
shall be checked for weed species and, if practicable, the weed species
shall be removed for disposal off-site to minimise the risk of propagation.

Tree clearing operations shall be completed in a manner that provides
maximum protection of the health and livelihood of native fauna.

Disposal of cleared vegetation will be managed in an environmentally
responsible manner.

The existing hydrological and ecological characteristics of the downstream
wetlands, poorly drained areas and Eenie Creek shall not be altered so as to
cause detriment to existing flora and fauna.

All underground services, drainage, footpaths and other site works shall be
located to minimise adverse impacts on retained vegetation, particularly
their root systems.

The development will be undertaken and operated in a manner that causes
no detrimental effect upon the amenity of the neighbourhood by reason of
the creation of excessive noise, lighting, dust or odour nuisance or any
other emissions in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998. On the spot fines apply for such
offences.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 5

Page 34

3

Vegetation Management Plan

 

4 > VEGETATION PROTECTION AND CLEARANCE MANAGEMENT

4.1

Introduction

This section outlines the recommended measures to minimise potential impacts on
vegetation.

4.2 Recommended General Management Actions

4.2.1

4.2.2

4.2.3

4.2.4

A relevant plan detailing the staging of works, areas to be retained,
significant areas of exclusion and other relevant issues shall be provided to
the Project Manager and Ecologist prior to any site preparation activities
within the proposed development site.

Works shall be conducted only between the hours of 7.00 am and 6.00 pm
Monday to Saturday.

All trees and areas of vegetation within the proposed works area considered
suitable for retention shall be identified. Within these zones the following
activities shall not be permitted:

Storage and mixing of materials;

Vehicle parking;

Liquid disposal;

Machinery repairs and/or refuelling;

Construction site office or shed;

Combustion of any material;

Stockpiling of soil, rubble or debris;

Any filling or excavation including trench line, topsoil skimming
and/or surface excavation, unless otherwise approved by the Project
Manager; and

° Unauthorised pesticide, herbicide or chemical applications.

Prior to the commencement of any vegetation clearance, the Contractor, in
consultation with the Project Manager, will discuss all areas to be cleared
on construction plans in the field. All areas to be cleared shall be clearly
identified on the ground by the Project Manager prior to the
commencement of any site preparation activities. Areas to be retained will
therefore be clearly identified and no unauthorised access shall be allowed.

4.3 Protection of Retained Vegetation

4.3.1

4.3.2

All activities in areas adjacent to any vegetation to be retained shall to be
carried out in such a manner as to minimise damage to the vegetation.
Vegetation to be retained will be clearly identified. Each tree or groups of
trees to be retained shall be investigated at the appropriate time by an
Ecologist/Arborist. Trees should be managed according to the Tree
Retention Guidelines in APPENDIX 1.

No site preparation shall occur outside nominated zones.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 6

Page 35

oF

Vegetation Management Plan

 

4.3.3, Upon completion, grubbing operations shall ensure the site is left free
draining with no ponding of stormwater.

4.3.4 All underground services, drainage, footpaths, bike paths, roads or other
site amenities shall be located to minimise adverse impacts on retained
vegetation (particularly root systems of retained vegetation).

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 7

Page 36

 

uz

Vegetation Management Plan

 

5 PREVENTION OF EROSION AND SEDIMENTATION

 

5.1 Site preparation shall occur in the following sequence; cutting, shearing of
felled vegetation and tub grinding.

5.2 Erosion & sediment control works shall be undertaken in accordance with
the Queensland Development Code - Draft Part 16: Erosion and Sediment
Control (Department of Local Government, Planning, Sport and Recreation
2002). Some issues to be considered include:

e Minimise the area of disturbance;

. Perimeter bunds/cut-off drains designed to by-pass upstream
“clean” runoff around the works area;

° Retardation basins installed;

° Silt fencing, silt traps & sediment ponds established; and

e Stabilisation of steep batters/slopes.

5.3 The erosion and sediment control measures are not to be dismantled until
the disturbed areas have been covered by mulch to a minimum depth of
100mm.

5.4 Each zone is to be mulched immediately upon completion of clearing and
grubbing works.

5.5 As construction activities may impact on retained vegetation it is important
to ensure sediment fencing is in place before site preparation and other
earthworks commence. Prior to any site preparation operations the Project
Manager (or other suitably qualified personnel) shall undertake an
inspection of all sediment fencing.

5.6 Areas subject to works shall be _ re-grassed/re-vegetated/mulched
immediately upon completion of site preparation & grubbing works.

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 8

Page 37

3

Vegetation Management Plan

6 WEED SPECIES MANAGEMENT

6.1

6.2

6.3

6.4

6.5

6.6

6.7

Prior to first entering the site, all construction machinery and vehicles shalt
be washed down to remove soil that may contain weed seeds, soil
pathogens and pest species.

All nursery stock shall be weed, pest and disease free and certified as such
by the supplier where feasible. The certificates are to be obtained prior to
the commencement of any regeneration/revegetation works on site.

Alt mulch produced on site from cleared vegetation and trees shall
specifically exclude material from weed species. Vegetation mulching will
be suitably controlled to avoid contamination. Mulch containing weed
species material shall be treated separately and not used on site for
regeneration/ revegetation works.

Soil disturbance within retained vegetation shall be kept to a minimum to
avoid weed recruitment. Areas to be regenerated (weed control) or
revegetated shall be completed under strict supervision to avoid
unnecessary soit disturbance.

Weed or potential weed species shall not be planted during revegetation
and landscaping operations.

All imported fill, soil, gravel and other construction and landscaping
materials shall be weed, pest and disease free and certified as such by the
supplier.

Soil disturbance within the open space areas should be kept top a minimum
to avoid weed proliferation.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 9

Page 38

a
2

Vegetation Management Plan

 

7  DIsposat oF DEBRIS

7.1

7.2

7.3

7.4

79

Clearing and disposal of vegetation to be in accordance with Council
requirements.

All cleared vegetation shall be suitably processed or removed from site by a
method approved by Council. Cleared vegetation is to be suitably processed
by one of the following methods:

e Processing through a woodchipper or shredder. -The resulting mulch
is to be stockpiled loose in heaps of less than 1000m?, less than 2.5m
high with a minimum of 10m between edges of heaps;

e Disposal for firewood;

Disposal for landscaping purposes;

e Transport to alternative site for breaking down materials provided
all necessary permits have been obtained to allow the alternate site
to be used for this purpose.

Pit burning of cleared vegetation is strictly prohibited as is the burning of
other refuse/waste on site.

The Contractor shall separate native and non-native species into different
stockpiles as far as is practicable. Non-native vegetation shall not be
mulched for re-use on-site, to minimise the risk of propagation.

Hotlow logs are not to be mulched until selected logs are salvaged, where
possible, for redistribution in Open Space areas of the site. As many hollow
logs as possible shall be relocated to within the approved
conservation/retention areas as habitat features.

 

Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 10

Page 39

Vegetation Management Plan

 

8 CONTROLS / CORRECTIVE ACTIONS

8.1

8.2

8.3

8.4

8.5

8.6

8.7

8.8

8.9

8.10

All contractors will be supervised by an on-site representative from the
Applicant.

The entire perimeter of all Open Space areas will be identified with flagging
tape or orange webbing. Contractors shall not enter these Open Space
areas. Any damage to vegetation not formally approved for removal will be
subject to a contractual penalty of $1000 per tree damaged.

In Open Space (Preservation of Visual Amenity) areas and within road
reserves, trees with dangerous limbs shall be removed. Habitat trees will
be retained where no future danger to people or property is likely.

The Contractor shall provide fences and/or trunk girdles to prevent
unintended physical damage to the root system, trunk or canopy of native
vegetation identified for retention, which may be impacted upon by
clearing works.

Contractors shall not enter Open Space (Environmental or Environmental
Drainage) areas. Any damage to vegetation in these areas will be subject to
a contractual penalty of $5000 per tree damaged.

A copy of the approved Tree Clearing Plan, approved documents and
Council’s conditions shall be retained on site at all times.

Contractors undertaking site works, including tree removal are to be
instructed directly of all Council’s conditions prior to works commencing.

All works carried out on either foliage or root systems of trees are to be in
consultation with a qualified arboriculturist or horticulturist. All works must
adhere to the Australian Standards (AS) 4373 - 1996 (Pruning of Amenity
Trees). The subject trees are not to be topped nor lopped. Spur climbing
of any tree to be pruned should also be avoided.

Pruning of trees is to be conducted in accordance with AS 4373 - 1996
(Pruning of Amenity Trees).

“Relevant provisions of Local, State and Commonwealth Government

Legislation/Policies to be adhered to by the Contractor.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 11

Page 40

3

Vegetation Management Plan

 

9 PERFORMANCE INDICATORS

 

9.1 All contractors are to be fully aware of responsibilities under this VMP and
other relevant management plans.

9.2 Sediment and erosion controls, off-site discharges, surface water
monitoring, dust and air quality management, control measure
maintenance, wildlife habitat management (including significant species
habitat), waste management, refueling of construction equipment and
vehicles, noise, cultural heritage, traffic management shall comply with
Council conditions and approved management plans.

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 12

Page 41

fe
2

Vegetation Management Plan

 

10 MONITORING AND REPORTING

10.1

10.2

10.3

10.4

10.5

10.6

The Applicant shall appoint suitable Contractor(s) to undertake the clearing
operations and, upon request by Council, the Applicant shall submit the
appointed Contractor(s) previous work history for perusal.

The Contractor shall monitor vegetation clearance, earthworks components
and the above Performance Objectives of the proposed works on a continual
basis to confirm that specific controls have been implemented and
appropriate work practices are being adopted to achieve the specified
performance objectives.

The Contractor shall formally report to the Applicant on a weekly basis. The

report will discuss the following:

1) Works undertaken;

2) Progress against stated objectives;

3) Compliance with Performance Objectives;

4) Significant problems encountered;

5) Success or failures of measures implemented to rectify previously
identified problems; and

6) Measures to be taken to rectify new problems.

Ouring clearing operations the Applicant shall report to Council on a

monthly basis. The report will discuss the following:

1) Works undertaken;

2) Progress against stated objectives;

3) Compliance with Performance Objectives;

4) Significant problems encountered;

5) Success or failures of measures implemented to rectify previously
identified problems; and

6) Measures to be taken to rectify new problems.

The Applicant is responsible for periodic condition monitoring of all retained
vegetation, with a maximum interval between inspections of one (1) month,
addressing the health and vigor of all retained vegetation for one (1) year
after the commencement of operational works. The Applicant is responsible
for the submission of quarterly reports to Council addressing the health and
vigour of all retained vegetation. In the opinion of Council, if any retained
vegetation shows signs of decline or ill health the subject vegetation shall
be removed immediately by the Applicant and at the Applicants expense. In
the event of the need to remove retained vegetation within road reserves,
the Applicant shall submit to Council an amended Streetscape Plan for
approval detailing the proposed replacement plantings prior to the
commencement of restoration works. Disturbed areas are to be inspected
monthly for weed growth, with appropriate weed control measures
implemented when warranted.

No works shall commence until all vegetation to be retained has been
clearly identified, and inspected by Council Officers.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 13

Page 42

ot

Vegetation Management Plan

 

11 REFERENCES

Chenoweth Environmental Planning and Landscape Architecture (2004) Vegetation
and Landscape Report (Planning and Environment Court_report for Appeal
no, 48 of 2003), a report for Allens Arthur Robinson.

Department of Local Government, Planning, Sport & Recreation (2002) Draft Part

16 - Erosion and Sediment Control, in Queensland Development Code,
Queensland Government

Landscape Assessment, Management and Rehabilitation Pty. Ltd. (2004) Flora
Report (Planning and Environment Court report for Appeal no. 48 of 2003).

WBM Oceanics Austratia Pty. Ltd. (1999) Eenie Creék Flora and Fauna Impact
Assessment Study, a report for McWilliam Consulting Engineers, Brisbane

URS Australia Pty. Ltd. (2002) Noosa Shire Business Centre Environmental
Management Plan, a report for Stockwell Pty. Ltd.

URS Australia Pty. Ltd. (2003) Concept Stormwater Management Plan for Noosa
Shire Business Centre - Stage 1. a report for Stockwell Pty. Ltd.

URS Australia Pty. Ltd. (2006) Tetrex Properties Site Flood Study, a report for Ken
Hicks and Associates Pty. Ltd.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 14

Page 43

vz

Vegetation Management Plan

APPENDIX 1 TREE PROTECTION GUIDELINES

Tree Retention Guidelines

The following procedures will ensure that retained trees adjacent to development
areas will survive construction works and will remain in a healthy condition. The
procedures will also ensure that any activity taking place within the drip line of any
retained tree will not significantly impact on the survival of the tree.

In order to protect significant trees, the following procedures are to be followed:

1.

Identifying a Tree Protection Zone: All retained trees likely to impacted
upon by development works will be marked prior to construction works. The
size and shape of a particular protection zone will vary according to
individual tree species. The zone will be determined by an Arborist prior to
commencing the project and will remain in place until project completion.

Pruning: Prior to establishing a tree protection zone, trees to be protected
will be pruned focusing on removal of dead or broken branches: The
purpose of this activity is primarily safety, but it serves as a monitor for any
damage that may occur during construction. Construction contractors are
prohibited from undertaking any additional pruning as this activity, if not
performed properly, can be harmful to the tree.

Establishing the Tree Protection Zone: The following measures will be taken
to protect the tree in the long term:

. Fencing - Secure posts with 1.8m high chain link or equivalent sturdy
fencing to be erected, maintained and removed by the Contractor to
the outer edges of the protection zone.

° Trunk protection - 1.8m high palings strapped to the trunk

° Mutching - 100 mm of composted mulch cover over the ground within
the tree protection zone in order to retain soil moisture and
encourage microbial activity.

. Irrigation - natural moisture levels should be maintained.

Drainage - the natural drainage patterns around the root zone should
not be altered.

. Signage - as follows:

Tree Protection zone

No vehicle movement

No storage of building materials

No washing of equipment

Contact name and number for enquires

4. Activities Within the. Tree Protection Zone: \f during the course of a

Project, it becomes unavoidable for activities to take place inside the
protection zone, then consent should first be gained from a qualified
arborist. Such activities may include the erection of scaffolding, vehicle
movement, trenching or excavation. An arborist can determine whether it is
appropriate to undertake that activity and advise of the most appropriate

 

Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 15

Page 44

il

3

Vegetation Management Plan

 

way to undertake such activities or suggest possible alternatives. Pruning of
branches and/or roots may be required; if so these activities should be
undertaken under the direction of an Arborist.

Trenching and Excavation: When trenching or excavation is to be
undertaken within the root zone of any tree, roots will be severed cleanly
rather than torn with a backhoe or other excavation equipment. All roots
are to be exposed first and then cut cleanly with a sharp saw or loppers.
Exposed roots are to be kept moist and covered with hessian for the
duration of the exposure. Where roots with a diameter larger than 50 mm
are encountered excavation should be undertaken by hand or small
implements.

. Monitoring and Reporting: A monthly site inspection will be completed to

ensure that protection measures are being obeyed. Such inspections will to
be completed by a qualified arborist.

 

Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 16

Page 45

» 4

JAMES WARREN & Associates Pty Ltd [HA

® ©

 

 

 

 

 

 

 

 

ENVIRONMENTAL CONSULTANTS a
{ LOE

ELF SKINK (Eroticoscincus graciloides)

@ so - MANAGEMENT PLAN

Lot 1 RP215933, EENIE CREEK ROAD

NOOSAVILLE

JUNE 2007

A REPORT TO KEN HICKS & ASSOCIATES PTY LTD.

Brisbane Office Head Office Sunshine Coast Office

Suite 28 Cathedral Village PO Box 490 Office 12 Caloundra City Centre
115 Wickham Street : ALSTONVILLE NSW 2477 51-55 Bulcock Street
FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778 CALOUNDRA QLD 4551

PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011

Fax: (07) 3257 2708 ‘Fax: (07) 5437 8022

 

 

 

Page 46

Elf Skink Management Plan

 

   

 
 
 
 
 
  
   

  
  
  
  
 
 

       

TABLE OF CONTENTS
1 INTRODUCTION ...........cccccscsccccnccccccccccssccsecsecscsssesees
1.1. Background ............ ce eecenacceecceeccsecsceecessocnscosassssesssees D
1.2 Site Description ..............ccceeseesenee seceeeeees wee a3
1.3 Proposed Development... seeseecesees seeeeeee 4
1.4 Objectives.............ccsceeeee seeeceeseceseces seeoee 4
1.5 Format of this Management Plan ........ i
2 ELF SKINK HABITAT .......cceccccscccscssvccees 6
2.1 6
2.2 6
2.3 100 6
2.4 Impact of the DevelopMent...........cscecscccssccsscccccscessssensscess O
3 MANAGEMENT OF ELF SKINK AND HABITAT .......cccesccccccccceceescees O
3.1 Introduction ..... de nceeeccencceesceeeseescecnceceseesessoessceonaee seeeeeeee 8
3.2 Management Strategies ..........sccescccccccvcccescccvccccnsseescceensces 8
3.3 Habitat Retention..................08. . 18
BiB.L1  ODjOCEIVE 2... eee ce cece nce ee erent ee ene tener ene eeeeneteceneeeneeneeeereenee 8
3.3.2 Background & Management Strategies.... 8
3.3.3 Management Actions. .......cccccccccscerssencneureseneesenesenseaeeonaenenenaes 8
3.4 Maintenance of Water Quality .....
3.4.1 ODJOCTIVE ... ieee cc eee e cece cence ene ne eens ee ee ee ee eet ne eens ee een sneer eeet ees 9
3.4.2 Background and Mitigation Strategies .........ccccecsceeeceeeee eet eeneeeenee
3.4.3 Management Actions. ........cccccccenceseceeeeceesenseneenaeees
3.5 ° Elf Skink and Fire ...........ccccsccesseeseescsceceseercnecees
3.5.1 ODJOCEIVE 0... cce ccc cce eee e eco e ene e ence enon eee nes eee sense eeeneeetsebeeteenees
3.5.2. Background & Mitigation Strategies
3.5.3 Management ACtions............csceeeeees
3.6 Pest Species Management ease .
3.6.1 ODjOCEIVE 00... ieee cece ee ece eee eee e eee eneee ees enenseeeeensenctaepteneeneneeas
3.6.2 Background & Mitigation Strategies. .........cccccccsseevsceeneeeeeeenceeuee 12
3.6.3 Management Actions. .......ccccccccccsceerenceseesencesenepeetenenaeeeeeeenes 13
4 ELF SKINK MONITORING .......ccsccccccscccvcccececcovsccccsssccssssses 14
4.1. Pre-Clearing Monitoring Survey ............scseeeeeee seccecccceesevees 14
4.2 On-going Post Development Monitoring Program...... seasons 14
4.2.1 ODjOCEIVES 0... ce cccec cece eee ee enon cnet eneeeene ease ene eee eeeeeeeeetneteenenenes 14
4.2.2 FUNAING 00... 0c cc ccccc eee e eee eeeneeeeeaeneeees vee 14
4.2.3 Methodologies ...........ccccccceecesceneseeeeees eee 14
4.2.4  RESUIES 0.0... ccc nec ce cece ee eee cnet e een e tenet ee enateeeeeeeeeeeaaeeeseaeeenenas 15
5 PERFORMANCE INDICATORS .......ccceccccccssccccccccssccscccsessccses 10
5.1. Introduction ......... senses cccenaceescenscenas ceasecccvccccvsscccsscessscs 16
5.2 Performance Indicators............ccessesscecscoscees ceccenecceseeses 16
5.3 Responses to Performance Indicators ............sceeceecescesceeees 16

6 SUMMARY .....cccccscscccccccncccccccnccscccscnsssccssscescccccccccccce TT
7 REFERENCES ......cccccccccccccccscccscccccccccccsvenscrccscccsscsseses 10

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 2

Page 47

Hg
2

Elf Skink Management Plan

 

1 INTRODUCTION
1.1 Background

James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates Pty Ltd
to prepare an Elf Skink Management Plan (ESMP) for the proposed development site at
Eenie Creek Road, Noosaville (FIGURE 1). This plan will focus on the Elf skink
(Eroticoscincus graciloides) and its associated habitat.

The subject site forms part of land envisaged to be developed as the Noosa Shire Business
Centre (NSBC). Stage 1 of the NSBC occurs immediately to the east of the subject site and
is currently under development. A number of fauna surveys and management plans were
completed as part of the Stage 1 development process and which are relevant to this
ESMP. These include:

e WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment Study;

e WBM Oceanics (2002) - Elf Skink Survey and Habitat Assessment within the
Noosa Shire Business Centre and Noosa Shire;

“« URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre Environmental

Management Plan;

e URS Australia Pty. Ltd. (2003a) - Elf Skink Management Plan;

e URS Australia Pty. Ltd. (2003b) - Concept Stormwater Management Plan;

e« James Warren and Associates (James Warren) (2004) - Fauna Assessment
(Planning and Environment Court report for Appeal no. 48 of 2003); and

« Place Environmental (Jason Richard) (2004) - Assessment of Fauna and Fauna
Habitat Issues (Planning and Environment Court report for Appeal no. 48 of
2003).

The Elf skink is listed as Rare under Schedule 4 of the Queensland Nature Conservation
(Wildlife) Regulation 1994 (NCWR).

1.2 Site Description

The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on
RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded by Eenie
Creek Road to the north, industrial development to the west, Eenie Creek to the south
and Stage 1 of the NSBC to the east. The subject site is approximately 21.97 hectares (ha)
in area.

The topography of the subject site is slightly undulating and generally slopes to the south
towards Eenie Creek. Numerous depressions occur throughout the site, particularly within
the lower-lying areas to the south. A drainage lines occurs within the eastern portion of
the site, which joins to a drainage line within Stage 1 of the NSBC to the east, below the
Q100 Average Recurrence Interval (ARI) level at RL 2.8 m level (URS 2006). After
prolonged rainfall, ponding of water occurs within depressions along the drainage line,
predominantly below Q100 (URS 2003b). A small constructed dam is located in the central
portion of the site.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 3

Page 48

 

 

 

 

 

Lake
Weyba
Legend
Subject Site
Noosa Shire Business Centre
0 500m
(ist eld
SOURCE: Brisbane UBD CLIENT ae
Ken Hicks & Associates FIGURE 1
. a PROJECT
SCALE 1.20000 @A4 Elf Skink Management Plan PREPARED. BW LOCALITY
Lot 1 on RP215933 DATE. 06 June 2007 PLAN
06 June 2¢

 

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FILE: Q06030_ESMP Locality cdr

 

 

 

Page 49

 

Elf Skink Management Plan

 

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinqueneriva) in the
southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur in
the northern portion. Much of the vegetation within the site was cleared during the 1970’s
and subsequent regrowth vegetation has been subject to frequent fire events. An aerial
photograph depicting vegetation coverage is presented in FIGURE 2.

A child-care centre and other associated built infrastructure occurs within the northern
portion of the site. In addition, numerous vehicle tracks occur throughout the site.

Several areas of ecological significance occur within 5 km of the subject site. Noosa
National Park adjoins the NSBC site to the east and Tewantin State Forest occurs
approximately 1 km to the west. In addition, Eenie Creek which occurs along the southern
boundary of the site, flows into Lake Weyba.

1.3 Proposed Development

The application proposes a Rol application over Lot 1 on 215933 (FIGURE 3).
The components of the application and approximate areas, are listed below:

e Total Area of Development - 11.64 ha;
e Area of Open Space (includes Environmental, Preservation of Visual Amenity
and Environmental Drainage uses) - 9.82 ha.

The subject site is designated under MP2 as Environmental Research & Development and
Offices, Residential and Employment Support and Industry and Business uses.

Other management plans prepared by JWA for the proposed development include:

Fauna Management Plan;
Vegetation Management Plan;
Open Space Management Plan;
Fire Management Plan; and
Site Rehabilitation Plan.

These plans should be viewed in conjunction with this ESMP.

1.4 Objectives

The objectives of this management plan are to:

e Identify Elf skinks and their associated habitat within the subject site;

e Identify the impact of development on Elf skinks; and

¢ Provide management guidelines for the in situ management of Elf skinks in
the long-term.

 

Q06030/ AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 4

Page 50

 

100 200m

Legend
Subject Site
Noosa Shire Business Centre

 

 

 

 

 

 

 

SOURCE: Google Earth 2006 Aerial Photograph

SCALE

1 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY LIMITED

 

Environmental Consultants

 

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Elf Skink Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 2

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_ESMP_ Aerial cdr

 

TITLE

AERIAL
PHOTOGRAPH

 

 

Page 51

 

 

 

 

 

 

    

oe
SPI67978

 
 

 

    

 

    

  

 

   

 

 

 

 

 

 

   

 

 

—— a EMT Cc
a peagess
- ae
—. sys
. o ba! 4
<= I~
ms
©
N
Q8
x3
3 :
= alae
wi = ,-
. 3 \
So -$5.00.0 1
7 os ray
1939°25 ~| | Lt & 5
fe 8 §
«WO886 aqvou MIN b 2
a 1o6rmae eine <
147-328 =
179°39'°25° xO? OF aN
%
8x = ‘NG o S
se nu = Xe N
é PS} Ne
rR P ch
wu 33
— 69 SSE Ov LOE i> 99861 £0619
Srooo
a| 2 2 | gi fe: yf g : si] gi} gi] si] si] gi] 82 tly
~s Ns m8 NS NS Nu § Nu 8 No] NE} Ne] RE Be me "2
x x a S = = g g 8 % & % ly 2
& & bs wv 5
S ¢s
& gi
Legend
RL 2.8
—— RESO
CLIENT TITLE
SOURCE: Ken Hicks & Assoc. (Ref: 060506Prop
lots 1-5 Amend plan F with NEW LOT 4 & 5 Ken Hicks & Associates Ply Lid FIGURE 3 PROPOSED
0 100m 1080507. pdf); URS Flood inundation Line PROJECT
ee ated
en SCALE: 1:3000@A3 prepara Plan PREPARED: BW DEVELOPMENT
: JAMES WARREN & ASSOCIATES PTY UMITED I] Eenie Creek Road. Noosaville, OLD DATE: 06 June 2007 LAYOUT

 

Environmental Consultants

 

 

 

 

Noosa Shire Council LGA

 

FILE: Q06030_ESMP_Dev layout.cd:

 

 

 

 

Page 52

BE
3

Elf Skink Management Plan

1.5 Format of this Management Plan

Sections 2 to 6 of this Plan deal with the ongoing management of Elf skinks and its

associated habitat.

This Plan is comprised of the following sections, i.e.

 

e Section 2 Elf Skink Habitat

e Section 3 Management of Elf Skink

e Section 4 Elf Skink Monitoring

e Section 5 Performance Indicators

e §©Section 6 Summary
Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES

Page 53

i
3

Elf Skink Management Plan

 

2 ELF SKINK HABITAT
2.1 Introduction

This section contains information regarding the distribution of the Elf skink and its
associated habitat on the subject. A photograph of the Elf skink is shown in FIGURE 4.

2.2 Habitat

The preferred habitat of the Elf skink is described as rainforest and associated wet
sclerophyll forests and is found under logs, stones and ground litter (Cogger 1996). It is
considered that the distribution of this species within these habitats is based largely on
microhabitat preferences, predominantly in damp, shady areas.

2.3 Distribution on the Subject Site

WBM (1999) observed this species within the southern portion of the subject site and in
the north-west portion of the NSBC. A subsequent fauna survey identified this species as
occurring adjacent to the south-eastern boundary of the subject site (Place 2004).

The subject site provides suitable habitat and some shelter sites for the Elf skink,
particularly within the southern portion and within the drainage line. However, the
subject site is considered to have a tack of good shelter sites (e.g. large logs), a lack of
structural diversity within vegetation communities and a lack of deep moist ground litter
(as a result of previous fire regimes), which reduces the habitat value of the site for this
species. All vegetation within the site (e.g. approximately 21.47 ha of the site) is
considered to provide suitable habitat for the Elf skink (FIGURE 5).

2.4 Impact of the Development

Under the proposed development, approximately 11.64 ha of Elf skink habitat will be
removed, primarily within the northern portion of the subject site. Habitat for this species
will be retained within proposed Open Space areas totalling approximately 9.82 ha
(FIGURE 3).

Impacts to this species may occur as a result of clearing operations and during the
operational phase of the proposed development. Such impacts include:

e Introduction of exotic predators or competitors - a number of non-native
fauna species are likely to occur within the site, including feral and exotic
pests (e.g. feral pig [Sus scrofa], Cane toad [Bufo marinus]) and domestic
animals. Predation and alteration of microhabitat have the potential to
significantly impact of the Elf skink population on the subject site.

e Inappropriate fire regimes - Fire is an integral part of native vegetation,
which assists in the maintenance of health, vigour, regeneration and

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 6

Page 54

 

 

Elf skink
(Eroticoscincus graciloides)

 

 

 

SOURCE: JWA

SCALE: Not to Scale

JAMES WARREN & ASSOCIATES PTY UMITED
Environmental Consultants

CLIENT

Ken Hicks & Associates Py Ltd
PROJECT .

Elf Skink Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

PREPARED: BW

 

FIGURE 4

DATE: 06 June 2007
FILE: Q06030_ESMP_EIf Skink.cdr

 

TLE

ELF SKINK

 

 

Page 55

 

 

0 100 200m
SS ———)

 

Community 1: Mid-high Open Forest (Avicennia marina subsp.

marina and Melaleuca quinquenervia)

Community 2: Open Forest (M. quinquenervia and Eucalyptus robusta

+ Corymbia intermedia, Lophostemon suaveolens and Livistona australis)
Community 3: Open Forest (E. grandis, E. microcorys and
Syncarpia glomulifera  M. quinquenervia and E. robusta)
Community 4: Open Forest (E. robusta, L. suaveolens, E. resinifera,

S. glomulifera and C. intermedia)
Dam

Buildings

Elf skink (Eroticoscincus graciloides)
RL 2.8

RL 3.0

Subject Site

Noosa Shire Business Centre

 

SOURCE: JWA Site Investigations 2006 & 200
WBM 2004 & 1999; URS 2002: Place 2004
URS Flood inundation Line

SCALE: 1: 8000 @A4

=

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Elf Skink Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD

 

 

 

Noosa Shire Council LGA

 

FIGURE 5

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030 ESMP_Habitat.cdr

 

TITLE

ELF SKINK
OBSERVATIONS &
POTENTIAL HABITAT

 

 

Page 56

oe
U2
Elf Skink Management Plan

composition of vegetation and fauna communities. The frequency, intensity,
period of burn and season influences the severity of impact of fire within
vegetation communities on the site. Fire may impact on Elf skinks through
removal of shelter sites (e.g. rotting logs, deep leaf litter).

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 7

Page 57

HE
2

ELf Skink Management Plan

 

3 MANAGEMENT OF ELF SKINK AND HABITAT
3.1 Introduction

This section provides a detailed management strategy for Elf skinks and their habitat at
the subject site.

3.2 Management Strategies

The following management strategies are proposed to minimise the potential impacts to
Elf skinks from the proposed development and to ensure the long-term survival of this
species (i.e. maintenance of a viable population) within the subject site.

3.3 Habitat Retention

3.3.1 Objective

To maintain suitable habitat for Elf skinks within designated Open Space areas.

3.3.2 Background & Management Strategies

3.3.2.1 Introduction

Maintenance of suitable habitat for Elf skinks is essential for their continued persistence
within the subject site. Of particular importance to Elf skinks is the quality of
microhabitat available, such as good shelter sites (e.g. fallen logs and deep leaf litter).

3.3.2.2 Retained Habitat Management

Some habitat for Elf skinks will be lost to the development including the northern and
western portions of the subject site and an area in the southern portion (i.e. 48%).
However, a large area of habitat will be retained within designation Open Space areas (02
and O04 under MP2) within the southern and eastern portions of the subject site
(approximately 9.82 ha). This area includes the entirety of the drainage line below the
constructed dam. In addition, designated Open Space within the NSBC to the east adjoins
this habitat.

Open Space will be retained in a near natural state (subject to the construction of fire
management trails) and will be enhanced with additional shelter sites sourced from
clearing works in adjacent vegetation, i.e. logs will be placed within Open Space areas to
provide additional shelter sites.

3.3.3 Management Actions

Retained habitat will be managed according to the Open Space Management Plan (JWA
2007a). The following management actions are included in this document:

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 8

Page 58

|
ce

Elf Skink Management Plan

 

e Limited access for vehicles (except fire fighting and maintenance vehicles)
and the Public from Open Space areas;

e Regular removal of rubbish and other dumped pollutants;

e Management of habitat during Operational Works to ensure potential impacts
from vegetation clearing adjacent to Open Space are minimised;

e Application of suitable fire regimes within Open Space areas;

e Maintenance of stormwater control devices in accordance with the
Stormwater Management Plan; and

e Maintenance of habitat in accordance with the Fire Management Plan.

3.4 Maintenance of Water Quality

3.4.1 Objective

To address the issue of water quality and stormwater management to ensure the
maintenance of the subject site’s natural hydrology.

3.4.2 Background and Mitigation Strategies

3.4.2.1 Introduction

‘Although this species is not directly influenced by hydrology on the subject site, alteration

to stormwater flows and/or water quality may indirectly impact on this species via
microhabitat alteration and/or reduction in forage resources (e.g. arthropod
productivity).

Several factors must be addressed regarding water quality post development. Of primary
importance is the treatment of stormwater on site.

Potential threats to Elf skinks from stormwater relate to:

e The volume of run-off; and
e §=©The quality of run-off.

These issues must be addressed to maintain the quality of Elf skink habitat to ensure the
continued persistence of Elf skinks on site. These issues are discussed below.

3.4.2.2 Volume of Run-off

The volume of stormwater run-off presents a number of issues in reference to Elf skink
habitat. Problems associated with high volumes of run-off include:

e Erosion as a result of high water velocity;
e Destruction of Elf skink habitat through the removal of vegetation; and
e Scouring of waterbodies within Elf skink habitat;

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 9

Page 59

2

Elf Skink Management Plan

 

A number of measures may be implemented where appropriate, to reduce the impacts on
Elf skinks and their habitat. These include:

Preparation and implementation of erosion control measures, with a specific
emphasis on the conservation of Elf skinks and their habitat;

Diversion of all road run-off away from Elf skink habitat areas;

Creation and instalment of structures such as stormwater diffusers to reduce
the volume and velocity of stormwater discharged; and

Preparation and implementation of a Stormwater Management Plan.

3.4.2.3 Quality of Run-off

The quality of stormwater run-off presents a number of issues in reference to Elf skink
habitat. Problems associated with poor quality run-off include:

Increases in turbidity of the water body, and loss of associated Elf skink
habitat;

Loss/reduction of arthropod productivity within aquatic environments;
Invasion by weed species as a result of nutrient enrichment; and
Loss of visual amenity value as a result of alterations to water quality.

A number of measures may be implemented, where appropriate, to reduce the impacts on
Elf skinks and their habitat. These include:

Preparation and implementation of a Stormwater Management Plan, with a
specific emphasis on the preservation of Elf skink habitat;

Diversion of all road-run-off away from Elf skink habitat areas; and

Installation of ground filtration systems and macrophyte basins (swales) and
gabions to reduce the turbidity and nutrient loading of discharged water.

3.4.3 Management Actions

The fotlowing management actions shall be undertaken to maintain the quality of water:

A Stormwater Management Plan, including erosion control measures, shall be
prepared for the site, with an emphasis on the conservation of Elf skink
habitat;

Detention basins, vegetated swales, gabions and/or buffers are to be
incorporated into the proposed layout;

All road run-off will be directed away from Elf skink habitat; and

The Vegetation Management Plan (JWA 2006b) addresses the issue of weed
control and subsequent monitoring within Open Space areas.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 10

Page 60

oe

Elf Skink Management Plan

 

3.5 Elf Skink and Fire

3.5.1 Objective

To reduce impacts of fire on Elf skinks and their habitat.

3.5.2 Background & Mitigation Strategies

3.5.2.1 Introduction

Elf skinks may be negatively impacted by inappropriate fire regimes and bushfires,
however indirect impacts such as microhabitat alteration and/or reduction in forage
resources (e.g. arthropod productivity) may also result in negative impacts.

Elf skink habitat may be affected by fire in relation to the following:

e The frequency of fire;
e = The intensity of fire; and
e =The area of habitat burnt.

These issues must be addressed to maintain the quality of Elf skink habitat to ensure the
continued persistence of Elf skinks on site. These issues are discussed within the Fire
Management Plan (JWA 2007c) and fire management within the subject site is discussed
below.

3.5.2.2 Fire Management

The southern Open Space area (designated as 02 on MP2) will be divided into two (2) fire
management blocks, to assist management of habitat as discrete areas to ensure Elf skink
population viability. Prescriptive burning shall occur in alternate blocks based on a long
fire cycle (of approximately 7-8 years).

The Open Space area with the drainage line (designated as 04 on MP2 will be managed as
a single block and shall be burnt at alternate times between the blocks within the 02
area. This is to ensure that adjacent patches are burnt at different times.

Additional fire management blocks shall be established at the interface of development
and Elf skink habitat. These areas will be managed as a buffer for protection against
bushfire and shall have a short fire management cycle (5-6 years). It is considered that,
depending upon Elf skink tolerance of shorter fire cycles, these areas will be maintained
as suitable habitat.

Cleared areas will be maintained at strategic locations (as per the Fire Management Plan)
as fire breaks. These areas are unlikely to inhibit Elf skink movement within or through
the subject site.

The intensity of the burn shall be dependent upon an estimate of the fuel load of the area
to be burnt and desired reduction in fuel load. The intensity of burns shalt not result in
the destruction of microhabitat features such as logs.

 

Q06030/AM/ESMP/RW5 _ JAMES WARREN AND ASSOCIATES 1

Page 61

Eg
2

Elf Skink Management Plan

3.5.3 Management Actions

The following management actions are recommended:

e A Fire Management Plan (JWA 2007c) has been prepared to manage
prescribed burns and bushfires within Open Space areas;

e This plan has been prepared to be sympathetic to Elf skinks and their habitat
within the subject site.

3.6 Pest Species Management

3.6.1 Objective

To minimise the impact of exotic vertebrate fauna with Elf skink habitat.

3.6.2 Background & Mitigation Strategies

3.6.2.1 Introduction

Exotic vertebrate pests have the potential to predate on Elf skinks or to significantly alter
habitat. The following pests have been identified as pests as having potential to
significantly impact on the resident Elf skink population:

e Feral pigs (Sus scrofa) have the potential to significantly damage Elf skink
habitat by trampling riparian and other vegetation, uproot vegetation and
destroy habitat logs in the process of foraging for grubs and insects and
destroy waterways by wallowing.

e Cane toads (Bufo marinus) have the potential to significantly impact on Elf
skinks by predation and by competition for food resources.

Other vertebrate pests such as domestic pets and feral animals should also be considered
if identified as having a significant impact on the Elf skink population.

3.6.2.2 Vertebrate Pest Species Management

The recommended approach to pest management on the subject site is outlined below.
The approach consists of a four (4) step program, which includes:

e Step 1 - Identification of Pest Species;

e Step 2 - Identification of Control Measures; .

e Step 3 - Development of a Vertebrate Pest Management Plan; and
e Step 4 - On-going Monitoring.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 12

Page 62

oe

Elf Skink Management Plan

3.6.3 Management Actions

The subject site is situated within a highly urbanised landscape and therefore the control
of exotic fauna is considered difficult. The following management actions are
recommended:

e Action will be required if a significant threat is detected during the pre-
development assessment;

e Advice will be sought from Noosa Shire Council and/or the Department of
Natural Resources, Mines & Water (DNRMW) if a significant threat is detected;

« Action wilt be required if any significant increase in threat is detected after
devetopment commences; and

e The owners of the Open Space areas will be responsible for taking action
required to reduce the threat.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 13

Page 63

BE
3

ELf Skink Management Plan

 

4 ELF SKINK MONITORING
4.1 Pre-Clearing Monitoring Survey

An Elf skink monitoring program will be implemented and will include a combined diurnal
and nocturnal survey to census Elf skinks on site immediately Prior to any approved.
clearing operations within identified Elf skink habitat.

This survey will be completed by JWA and will provide baseline data to which all
subsequent, post development surveys will be compared.
4.2 On-going Post Development Monitoring Program

4.2.1 Objectives

The aim of the on-going post development monitoring program is to determine:

e — Elf skink distribution/abundance post development;

e = Alterations to Elf skink population density;

e« Development of controls and corrective actions; and

e Supplement on-going Elf skink research within the region.

Timing:

e = Annual Elf skink surveys shall be undertaken on the subject site for a period
of three (3) years post development.

4.2.2 Funding

The monitoring program will be funded by the site owner.

4.2.3 Methodologies

e Monitoring shall be undertaken in areas mapped as being able to support Elf
skink in all public lands and within private Open Space subject to approval;

e Monitoring shall commence with a field survey using the following techniques:

o Diurnal and nocturnal surveys to assess the distribution of Elf skink is to
occur using pitfall trapping and random searches.

o Surveys will be completed along permanent survey transects (staked and
located by GPS) to provide directly comparable results.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 14

Page 64

oe
2
Elf Skink Management Plan

4.2.4 Results

Elf skink distribution and abundance within the site and surrounding areas will be
compared with previous surveys (WBM 1999, JWA 2004, Place 2004) and the pre-
development Elf skink survey to determine changes in population distribution that may or
may not be attributable to the development. Results shall be made available to relevant
State and local government bodies. If the population level of Elf skink are in decline
within the subject site, an investigation of potential threatening processes is to occur.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 15

Page 65

eee
Fa

Elf Skink Management Plan

 

5 PERFORMANCE INDICATORS
5.1 Introduction

The objectives of this management program are to ensure the long term persistence of
viable populations of Elf skink within areas of Open Space post development.

This section provides specific performance criteria against which success may be
compared. .

. 5.2 Performance Indicators

The following performance criteria are to be used to determine the success of this
management program:

e Elf skink are to persist within Open Space areas;
e There is to be natural recruitment within this population; and
e There is to be a range of age classes within this population.

5.3 Responses to Performance Indicators

Results from the monitoring program (SECTION 4) are to be compared to the performance
criteria set out above.

 

Q06030/AM/ESMP/RWS JAMES WARREN AND ASSOCIATES 16

Page 66

HE
3

Elf Skink Management Plan

 

6 SUMMARY

James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates Pty Ltd
to prepare an Elf Skink Management Plan (ESMP) for the proposed development at Eenie
Creek Road, Noosaville.

The environmental requirements of the Elf skink have been investigated and areas of
habitat to be retained/developed have been proposed based on this information.

Under the proposed development, approximately 9.82 ha of existing Elf skink habitat shall
be conserved within designated Open Space areas. A range of significant threats that have
the potential to impact on the Elf skink population within the subject site have been
identified. Management actions have been proposed to mitigate or minimise these
potential impacts. ‘

A pre- and post-clearing monitoring program has been proposed to assess the success of
this management program against Performance Criteria. This monitoring program is to be
funded by the landholders.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 17

Page 67

EE
2

Elf Skink Management Plan

 

7 REFERENCES

Cogger, H.G. (1996) Reptiles and Amphibians of Australia, 5" Edition, Reed Books Pty Ltd,
Sydney.

James Warren and Associates (2004) Fauna Assessment, Noosa Shire Business Centre,
Planning and Environment Court Appeal No. 48 of 2003, Noosa Chamber of
Commerce and Industries and Noosa Parks Association Inc. V. Noosa Shire Council
and Mirose Pty. Ltd.

James Warren and Associates (2007a) Open Space Management Plan, a report to Ken Hicks
& Associates Pty. Ltd.

James Warren and Associates (2007b) Vegetation Management Plan, a report to Ken Hicks
& Associates Pty. Ltd.

James Warren and Associates (2007c) Fire Management Plan, a report to Ken Hicks &
Associates Pty. Ltd.

Place (2004) Assessment of Fauna and Fauna Habitat Issues, Planning and Environment
Court Appeal No. 48 of 2003, For the Planning and Environment Court of Queensland.

URS Australia Pty. Ltd. (2003b) Concept Stormwater Management Plan, a report to
Stockwell Developments Pty. Ltd.

URS Australia (2006) Tetrex Properties Site Flood Study, a report to Ken Hicks &
Associates.

WBM Oceanics (1999) Eenie Creek Flora and Fauna Impact Assessment Study, a report to
Stockwell Developments Pty. Ltd.

Wilson, $., and Swan, G. (2003). A complete guide to reptiles of Australia. Reed New
Holland, Sydney.

 

Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 18

Page 68

 

 

 

 

 

 

 

 

€

JAMES WARREN & Associates Pty Ltd 2

ENVIRONMENTAL CONSULTANTS Ser

 

FAUNA MANAGEMENT PLAN

NOOSAVILLE

JUNE 2007

e | _ LOT 1 RP215933, EENIE CREEK ROAD
A REPORT TO KEN HICKS & ASSOCIATES PTY LTD

 

 

 

Brisbane Office Head Office Sunshine Coast Office
Suite 28 Cathedral Viltage PO Box 490 Office 12 Caloundra City Centre
115 Wickham Street ALSTONVILLE NSW 2477 51-55 Bulcock Street
FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778. CALOUNDRA QLD 4551
PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011
Fax: (07) 3257 2708 . Fax: (07) 5437 8022

N\N

3

Page 69

 

Fauna Management Plan

 

TABLE OF CONTENTS

 

 

 

1 INTRODUCTION ..........cccccccsccrsscccceneenecnecnsnnesseneetenecceneesocasanagenensessenecenseses 2
1.1. BACKGROUND
1.2 SITE DESCRIPTION. .....c.ccecsecencsccscenoeeccnnneesensensesconsoeeenassseessaressenen 2
1.3. SIGNIFICANT FAUNA ON OR ADJACENT TO THE SUBJECT SITE .......scccceecceeeereeee 3
1.4 FORMAT OF THIS MANAGEMENT PLAN .....-.sccsccsncsscsccsevcsccnstecsscucsscnorsene 3
2 PROGRAM OF WORKG............ccsccesssecsenessecseeresseneesasescesectensnsesseasaneaserensanees 4
3. STATEMENT OF OBJECTIVES .........ccc.c::ssssscesceseseeeenesssnsnsensesensenssesenessasanes 6
4 FAUNA MANAGEMENT ........cccsccccccsenecenscesesensssssnececceseasensessnsaenceesesensasenes 7
4.1. INTRODUCTION ,........ecscscscesessceenescecensscesceceeeesereesseseenaeessereeponaces [email protected] GENERAL MANAGEMENT ACTIONS,.....-sccsccsscesccscctorscescnecaessceseesseseensees 7
4.3 SPECIFIC MANAGEMENT ACTIONS ......cs.cceccaccsccccsrersecsesecesencsereenssenese 10
4.3.1 Koala (Phascolarct0S CiN@reuS) ........cccee cc cenen ee enccteeeseenneeteseenee 10
4.3.2. Glossy black cockatoo (Calyptorhynchus lathami)............0cseeeeeees 10
4.3.3 Wallum froglet (Crinia tinnul) ........ccccccececeeceneeneeteeenseeaesenens
4.3.4 Green-thighed frog (Litoria brevipalmata)
4.3.5 Elf skink (Eroticoscincus graciloides) ..........cccscceecencennensesceeeeees
4.3.6  Cooloola blind snake (Ramphotyphlops SilVid) .........ccceceeeeeee ee eees 11
5 PEST SPECIES MANAGEMENT. ..........cceessssesscccecensseesereesseeeetesensaesteessasenenee 12
6 DISPOSAL OF DEBRIS............cccccscscecesesseeeeseeneneesaseneaeetesseaeeeanecsaeseesseeerees 13
7 CONTROLS / CORRECTIVE ACTIONS... wee 14
8 OPERATIONAL PHASE ON-GOING MANAGEMENT ..........::scccsscsseressseeneees 15
9 PERFORMANCE INDICATORS .........cccccsesseeeesessneesenenseeensescesenonsncceseessnnerees 16
9.1 INTRODUCTION .......cscsecveceeccceesenseuscuccnesensteeesensseesenensaseeenaeesees
9.2 PERFORMANCE INDICATORS .......csccscescscceeevcrccesuscuseesenserseaseeseseceones
@ 10 REFERENCES ..... ccc ecccseesssscnceceeeesansenesensonsecuseseutenssseecenscouanesesesessausns

11 APPENDIX 1 - INDICATIVE FAUNA FRIENDLY FENCE DESIGN ..

 

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 1

Page 70

 

Fauna Management Plan

1 INTRODUCTION
1.1 Background

James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates
Pty Ltd, on behalf of S & L Developments Pty Ltd, to prepare a Fauna Management
Plan (FMP) for the proposed development site at Eenie Creek Road, Noosaville
(FIGURE 1).

The subject site forms a part of land envisaged to be developed as the Noosa Shire
Business Centre (NSBC). Stage 1 of the NSBC occurs immediately to the east of the
subject site and is currently under development. A number of fauna surveys and
management plans were completed as part of the Stage 1 development process and
which are relevant to this FMP. These include: :

« WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment
Study;

* WBM Oceanics (2002) - Elf Skink Survey and Habitat Assessment with
the Noosa Shire Business Centre and Noosa Shire;

e URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre

. Environmental Management Plan;

e URS Australia Pty. Ltd. (2003a) - Elf Skink Management Plan;

e URS Australia Pty. Ltd. (2003b) - Concept Stormwater Management
Plan;

e James Warren and Associates (James Warren) (2004) - Fauna
Assessment (Planning and Environment Court report for Appeal no. 48
of 2003); and

e Place Environmental (Jason Richard) (2004) - Assessment of Fauna and
Fauna Habitat Issues (Planning and Environment Court report for
Appeal no. 48 of 2003).

1.2 Site Description

The subject site is located at Eenie Creek Road, Noosaville and is described as Lot
1 on RP215933, Parish of Tewantin, Shire of Noosa. The site is bounded by Eenie
Creek Road to the north, industrial development to the west, Eenie Creek to the
south and Stage 1 of the NSBC to the east. The subject site is approximately 21.97
hectares (ha) in area.

The topography of the subject site is slightly undulating and generally slopes to the
south towards Eenie Creek. Numerous depressions occur throughout the site,
particularly within the lower-lying areas to the south. A drainage tines occurs
within the eastern portion of the site, which joins to a drainage line within Stage 1
of the NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at
RL 2.8 m level (URS 2006). After prolonged rainfall, ponding of water occurs within
depressions along the drainage line, predominantly below Q100 (URS 2003b). A
small constructed dam is located in the central portion of the site.

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-teaved paperbark (Melaleuca quinquenervia) in the.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 2

Page 71

 

Doonell

 

  

   
 

 

Beg 8 (

     
   

 

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

 

 

 

 

 

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

DATE: 06 June 2007
FILE: Q06030_FMP_Locality.cdr

 

& & Pines ‘2 eg *
TREAS FE > ve xf <
MASSE x aoe Wy NOOSAVILLE £
TA age iia
‘i 2
R) |
2°
ee
or
‘
« Noosa
z K Arsing
= Prvate.
pa =
Para
we .
@ CAtnouse
e Lake
Weyba
Legend
J Subject Site
[1 Noosa Shire Business Centre
0 500m
(eel ee eel
CLIENT TITLE
JI
SOURGE! Brisbane JED Ken Hicks & Associates Pty Ltd FIGURE 1
PROJECT
SCALE: 1:20000@A4 He ee LOCALITY
: PREPARED: BW
Lot 1 on RP215933 PLAN

 

 

 

Page 72

a

Fauna Management Plan

 

southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera)
occur in the northern portion. Much of the vegetation within the site was cleared
during the 1970’s and subsequent regrowth vegetation has been subject to
frequent fire events. An aerial photograph depicting vegetation coverage is
presented in FIGURE 2.

A child-care centre and other associated built infrastructure occurs within the
northern portion of the site. In addition, numerous vehicle tracks occur throughout
the site.

A Reconfiguration of a Lot (RoL) application is proposed over the subject site
(FIGURE 3).

1.3 Significant Fauna on or Adjacent to the Subject Site

A number of rare or threatened fauna are known or likely occurrences on the
subject site. These species include:

Koala (Phascolarctos cinereus);

Glossy black cockatoo (Calyptorhynchus lathami);
Etf skink (Eroticoscincus graciloides);

Cooloola blind snake (Ramphotyphiops silvia);
Wallum froglet (Crinia tinnula); and
Green-thighed frog (Litoria brevipalmata).

FIGURE 4 shows the location of significant fauna sightings within the subject site
and the NSBC site. Specific management actions for these species are included in
SECTION 4.3. in addition, an Elf Skink Management Plan has been prepared by JWA
to direct the management of the Elf skink population within the subject site.

1.4 Format of this Management Plan

Sections 2 to 9 of this Plan deal with the ongoing management of fauna,
particularly identified significant fauna and their associated habitat.

This Plan is comprised of the following sections, i.e.

 

e Section2 — Program of Works
e Section 3 Statement of Objectives
© Section 4 Fauna Management
e Section 5 Pest Species Management
e Section 6 Disposal of Debris
e Section 7 Control and Corrective Actions
« Section 8 Operational Phase On-going Management
e Section 9 Performance Indicators
Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 3

Page 73

 

 

) 100 200m
eee as ieee)

Legend
Subject Site
Noosa Shire Business Centre

 

 

 

 

 

 

 

SOURCE: Google Earth 2006 Aerial Photograph

SCALE: 1: 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY UMITED

 

Environmental Consultants

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Fauna Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 2

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_FMP Aerial.cdr

 

TITLE

AERIAL
PHOTOGRAPH

 

 

Page 74

 

       

 

 

 

  

     

 

 

   

         

 
 
 

 

 

 

 

 

  

 
 

 

 

 

 

 

 

   

 

i a8
Ss «<
——a ef Se >3
i fh ogh & LG
ze -
i “Se NEW ROAD
—— — a C
F EMT C
= a - - RP2IS933 q
é ee he
Sis
| o Se
2 .
wm *
©
N
f 98
S38
es _
#e
\
L 1939/25 :
519 pi
[ 240886 VON
£0616
1 @ “ '
2 2 8 X 8 9 y 8 81 8 ~@s vi 3 © 3 x 4
3 3 é y 8 g 8 SF] 6: 8 | $2 8: S 3 S ly
~§ “3 m8 “3 N Nu § N N§ NS NS m2 ™§ ™& " ¢ ly .
$ g & aw 8
Ss 3
he g §
Legend
RL 2.8
=== RiU3:0
E SOURCE: Ken Hicks & Assoc. (Ref: 060506Prop Far iia Rhooctaeg A es TITLE
lots 1-5 Amend plan F with NEW LOT 4&5 ye GURE 3
URS Flood Inundation Line PROJECT PROPOSED
Sos a ns n
an 1 3000 @ A3 youre Hecooaren i PREPARED: BW DEVELOPMENT
JAMES WARREN & ASSOCIATES PTY UMITED ; i DATE: 06 June 2007 LAYOUT
Environmental Consultants Eenie Creek Road, Noosaville, QL :
Noosa Shire Council LGA FILE: Q06030_FMP_Dev Layout.cdr

 

 

 

Page 75

 

 

0 100 200m
I)

Legend

as
ay Wallum froglet (Crinia tinnula)
\A* Elf skink (Eroticoscincus graciloides)
Cooloola blind snake (Ramphotyphlops silvia)

Koala (Phascolarctos cinereus) Scat

o
¢ Koala (Phascolarctos cinereus) Sighting

Green-thighed frog (Litoria brevipalmata)

{\)_ Glossy black cockatoo (Calyptorhychus lathami) -

~ — Chewed Allocasuarina littoralis cones
Black she-oak (Allocasuarina littoralis)

RL 2.8
——— RESO

= Subject Site
Noosa Shire Business Centre

 

 

SOURCE: JWA Site Investigations 2006 & 2004
WBM 2004 & 1999; URS 2002; Place 2004;
URS Flood Inundation Line

SCALE: 1: 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY UMITED

 

Environmental Consultants

 

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Fauna Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 4

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_FMP Fauna.cdr

 

TITLE

SIGNIFICANT
FAUNA
LOCATIONS

 

 

Page 76

 

Fauna Management Plan

 

2 PROGRAM OF WORKS

In order to ensure the most suitable ecological outcome and to ensure that possible
impacts on wildlife, especially Wallum froglet, Green-thighed frog, Koala, Glossy
black cockatoo, Elf skink and Cooloola blind snake are minimised, it is
recommended that the commencement of site work takes place in accordance with
the fotlowing;

. Selective clearing shall be employed within the site, whereby smaller non-
habitat trees are initially removed followed by the removal of any
identified habitat trees at a later time;

° A pre-clearing survey will be completed for significant fauna involving
spotlighting and pitfall trapping;

° Selective clearing will commence in the northern portion of the site and
will continue in a southerly direction. The timing and direction of
selective clearing will provide a disturbance stimulus to move wildlife into
areas of retained vegetation; and

. Comprehensive protection measures are detailed in this FMP to ensure
that the risk of injury to fauna is minimised and to ensure correct
management of significant species.

Vegetation will be retained within Open Space Areas in accordance with the Open
Space Management Plan (OSMP) (JWA 2007) as follows:

Open Space (Conservation and Waterway Protection):

The OS2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency
vehicles and Council maintenance vehicles. All unnecessary existing tracks and
trails will be closed off and rehabilitated and vehicle access points will be limited
to as few as possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created
within this area to provide access for fire fighting vehicles and to ensure
compliance with bushfire management objectives. This fire break will have a
minimum width of ten (10) metres, which will involve the clearing of all
vegetation. Other fire breaks will be created within this Open Space area, however
these will require the clearing of vegetation to a four (4) metre width. The location
of all fire breaks will take into account the requirement to retain habitat trees,
where possible.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 4

Page 77

 

2

Fauna Management Plan

 

Open Space (Preservation of Visual Amenity):

 

The Open Space 0S3 and OS6 areas will be retained primarily for screening
purposes. Proposed works within these areas shall be limited to minimal
landscaping and supplementary plantings of endemic species. Adjacent
infrastructure such as footpaths, lighting and signage and stormwater control
devices/measures may be included as part of the detailed design stage however,
shall not adversely impact on the existing native vegetation.

Open Space (Environmental Drainage and Conservation):
All native vegetation in this area will be retained. No infrastructure is proposed to

occur within the OS4 area as all stormwater will be treated prior to discharge into
the drainage line.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 5

Page 78

 

Fauna Management Plan

3 STATEMENT OF OBJECTIVES
This FMP has the following objectives:

1. Retained vegetation within designated Open Space areas is to be clearly
marked and protected.

2. Tree clearing operations shall be completed in a manner that provides
maximum protection of the health and livelihood of native fauna.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 6

Page 79

op

Fauna Management Plan

 

4
4.1

FAUNA MANAGEMENT

Introduction

This section outlines the recommended measures to minimise potential impacts on
fauna. Measures to minimise adverse impacts on fauna include:

Identification of potential fauna habitat trees (e.g. stags or hollow-
bearing trees);

Demarcation of habitat trees and vegetation to be retained;

Relocation of identified significant fauna within habitat to be removed, if
necessary;

Instructions to site preparation Contractors/Site Managers;

Spotter-catcher (fauna rescue) measures during site preparation
operations; and

Fauna management prior to, during and .following site preparation
operations.

Additional recommendations for the use of felled timber, retention of conservation
areas and reporting procedures are proposed.

4.2 General Management Actions

4.2.1

4.2.2

The Queensland Nature Conservation Act 1992 requires that protected
animals whose habitat has been or is about to be destroyed by human
activities or natural disasters are cared for and _ rehabilitated.
Compliance with the Act will be required.

Prior to the commencement of the selective clearing works, a fauna
survey will be completed within the areas to be cleared. The fauna
survey program will consist of pre-dawn spotlighting for Koalas and
Glossy black cockatoos on the day prior to clearing and pitfall trapping
for Elf skinks, Cooloola blind snakes, Green-thighed frogs and Wallum
froglets for four (4) nights prior to clearing. The survey methodologies
will include the following:

e Targeted surveys for Koalas will be completed at pre-dawn of the
day before site preparation is to commence. This will include two
(2) experienced observers spotlighting for a minimum of two (2)
hours. Trees in which Koalas are sighted shall be flagged with
tape. Call playback may be utilised, if required;

e =6Pitfail trapping for significant amphibians and reptiles will be
completed for four (4) days prior to the commencement of clearing
operations. This will include the erection of two (2) trap-lines
consisting of six (6) buckets each, for a total of forty-eight (48)
trap-nights. Each bucket shall be placed five (5) meters apart and
drift nets set between each bucket. Location of the trap-lines will

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 7

Page 80

 

Fauna Management Plan -

 

4.2.3

4.2.4

4.2.5

4.2.6

4.2.7

4.2.8

be determined on-site to maximise the capture of significant
reptiles and amphibians.

If any significant herpetofauna are identified within areas to be
cleared, individuals should be immediately removed from the
buckets and relocated to the designated Open Space areas.
Hygiene protocols described within the document, Hygiene
protocols for the control of disease in frogs (New South Wales
National Parks and Wildlife Service 2001), should be followed when
handling amphibians.

The program will be undertaken in compliance with Queensland Parks
and Wildlife Service (QPWS) guidelines and the Draft Queensland Code
of practice for the welfare and management of wild animals affected
by land-clearing and the modification or destruction of wildlife habitats
and wildlife spotter/catchers (Hanger 2006). If requested, all survey
records will be forwarded to Council at the end of the clearing program.

The sequence and timing of selective clearing work will ensure
maximum opportunity for fauna movement away from operational works

. towards the Open Space areas and adjacent suitable habitat.

Prior to the selective clearing operations, habitat trees will be
identified and demarcated with flagging tape. Habitat trees are defined
as those trees that provide suitable foraging, refuge and nesting
resources for arboreal and avian fauna. These include hollow-bearing
trees, trees with fissures, trees with substantial food resources (e.g.
pollen, nectar, foliage, arthropods). Larger, old growth trees are also
considered to be habitat trees as they are likely to provide greater
amounts of foraging resources, cover, and a high number of potential
hollows. Dead (stag) trees are also regarded as important habitat trees
as they provide roosting and nesting resources.

Once habitat tree identification has occurred, site preparation is to be
completed using a staged approach where the smaller non-habitat trees
are removed in the first stage with the larger remaining habitat trees
removed three (3) to five (5) days after the initial clearing. This staged
method provides a disturbance stimulus and provides fauna with time to
leave the site thus maximising the chances of fauna survival while
reducing the need for human intervention for translocation or rescue
purposes.

Immediately prior to felling of the identified habitat trees, an
appropriately qualified person (i.e. accredited by QPWS for capture and
release) “Spotter/catcher” shall be present to inspect the trees and
relocate remaining fauna where possible.

If any denning or nesting animals are observed within hollow limbs, but
cannot be readily removed by an ecologist, it is recommended that,
where appropriate, the hollow end of the timb be blocked with porous
material and a chainsaw be used to remove the limb. The limb should

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 8

Page 81

 

Fauna Management Plan

 

4.2.9

4.2.10

4.2.11

4.2.12

4.2.13

4.2.14

4.2.15

4.2.16

4.2.17

4.2.18

then be relocated to a suitable place, determined in consultation with
QPWS and the hollow end unblocked at an appropriate time of day to
minimise fauna predation.

Prior to tree removal, an appropriately qualified ecologist should
attempt to “flush out” any denning or nesting animals not observed
during the initial hollow inspection. This may involve hitting target trees
with a sledgehammer or another similar technique.

Following felling, a second inspection of the relevant trees shall be
carried out to relocate fauna disturbed by the clearing process or
remaining within the felled timber to a suitable location determined in
consultation with QPWS.

Where possible, the actual felting of the habitat trees should be
completed in a manner that will maximize the chances of survival for
any fauna remaining within the tree hollows. This will involve pushing
rather than cutting, and cushioning the tree fall with other felled timber
and foliage.

All injured animals shall be immediately removed and taken to an
appropriately qualified veterinary surgeon.

Following completion of the selective clearing stage, capture and
release records will be supplied to the Project Manager for
dissemination to QPWS, where required. A copy of these records, if
requested, shall be supplied to Council.

No unrestrained dogs shail be permitted on site during construction.

Buildings, roads and fences shalt be sited and constructed to allow
movement of fauna through and within the site. These structures would
be constructed in consultation with an Ecologist, where necessary, to
determine the most appropriate location and design that maximises the
retention of fauna movement through and within the site.

Fauna friendly fences (e.g. posts and rails) shall be located at the
interface of the development envelope and alt areas of retained
vegetation. They must be of a form that does not impede fauna
movement along areas of retained vegetation, such as a minimum gap of
150 mm below the bottom rail, and which does not exceed 1.2 metres in
height, should achieve this objective. Wire mesh type fences (if utilised)
must contain a top rail, while strand wire or split rail type fences should
have a minimum spacing between wires/rails of 300 mm. Lockable gates
shall be provided at all vehicle maintenance access points.

Further detail on fauna friendly fence design is shown in APPENDIX 1.
Plant species used in landscaping and revegetation works shall be

selected to provide food and habitat for local fauna (e.g. Allocasuarina
spp. for Glossy black-cockatoos; Banksia spp. for honeyeaters etc.).

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 9

Page 82

»
5.

Fauna Management Plan

4.3 Specific Management Actions

4.3.1

4.3.1.1

4.3.1.2

Koala (Phascolarctos cinereus)

In the event that a Koala is identified in any tree marked for removal,
whether habitat or otherwise, that tree is not to be removed until the
Koala has dispersed from the tree. The tree shall be left overnight to
enable the Koala to move away. The tree can only to be removed
following inspection by an appropriately qualified ‘spotter-catcher’ (i.e.
accredited by QPWS for capture and release) to ensure that the Koala
has dispersed and that the removal of the tree poses no direct threat to
the health or survival of the Koala.

Where appropriate, additional Koala food trees (e.g. Eucalypts and
allies) shall be planted as part of the landscaping practices throughout
the development site. Koalas shall not be encouraged (e.g. by planting
food trees) to utilise 0S3.

4.3.2 Glossy black cockatoo (Calyptorhynchus lathami)

4.3.2.1

4.3.2.2

In the event that a Glossy black cockatoo is identified in any tree
marked for removal, whether habitat or otherwise, that tree is not to be
removed until the bird(s) has dispersed from the tree. If required, the
tree should be left overnight to enable the bird(s) to move away. The
tree can only to be removed following its inspection by an appropriately
qualified ‘spotter-catcher’ (i.e. accredited by QPWS for capture and
release) to ensure that the bird(s) have dispersed and that the removal
of the tree poses no direct threat to the health or survival of the Glossy
black cockatoo.

Where appropriate, Glossy black cockatoo forage species (e.g.
Allocasuarina sp.) shall be planted as part of the landscaping and
revegetation practices throughout the development site.

4.3.3 Waltum froglet (Crinia tinnula)

 

4.3.3.1. Designated Open Space areas will be demarcated with orange webbing
prior to site preparation works.

4.3.3.2 The webbing will be retained until selective clearing works are
completed.

4.3.3.3 Signage is to be erected on exclusion fencing stating: “No Entry -
Environmental Protection Areas”.

4.3.3.4 All contractors are to be made aware of restrictions applying to the
exclusion zones.

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 10

Page 83

wz
patel

Fauna Management Plan

 

4.3.4 Green-thighed frog (Litoria brevipalmata)

4.3.4.1

4.3.4.2

 

In the event that a Green-thighed frog is identified within an area to be
cleared, the frog will be immediately removed by an approved
Spotter/catcher. Captured individuals will then be relocated to the
designated Open Space areas for immediate release.

Where appropriate, additional shelter sites (e.g. logs, large rocks)
should be installed within Open Space areas.

4.3.5 Elf skink (Eroticoscincus graciloides)

4.3.5.1

4.3.5.2

In the event that an Elf skink is identified within an area to be cleared,
the skink will be immediately removed by an approved Spotter/catcher.
Captured individuals will then be relocated to the designated Open
Space areas for immediate release.

Where appropriate, additional shelter sites (e.g. logs, large rocks)
should be installed within Open Space areas.

4.3.6 Cooloola blind snake (Ramphotyphlops silvia)

4.3.6.1

4.3.6.2

In the event that a Cooloola blind snake is identified within an area to
be cleared, the blind snake will be immediately removed by an
approved Spotter/catcher. Captured individuals will then be relocated
to the designated Open Space areas for immediate release.

Where appropriate, additional shelter sites (e.g. logs, large rocks)
should be installed within Open Space areas.

 

Q06030/ AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 11

Page 84

 

p

Fauna Management Plan

 

5

5.1

5.2

5.3

5.4

PEST SPECIES MANAGEMENT

Pest animal control measures, where necessary, shall be completed
using suitable and appropriate strategies as employed elsewhere within
the Shire.

Unrestrained dogs shalt not be allowed on the site during construction.

All. stormwater treatment and sediment control devices shall be
designed and managed so they do not create breeding habitat for
mosquitoes and Cane toads (Bufo marinus) (e.g. ponds of standing
water). A Stormwater Management Plan will be prepared for the
proposed development and will include strategies to address this issue.

Construction activities shall be carried out in such a way so as to
prevent the creation of ponded or standing water, which would result in
breeding habitat for mosquitoes and Cane toads.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 12

Page 85

Fauna Management Plan

 

6.1

6.2

6.3

DISPOSAL OF DEBRIS

Habitat trees shall be identified by an Ecologist prior to site preparation.
Hollow limbs are typical features of habitat trees. An Ecologist (licensed
“Spotter-catcher”) shall be present during the removal. of habitat trees and
shall be responsible for ensuring that selected hollow limbs are collected,
where practical, for redistribution in the Open Space (Environmental) areas
of the site. Hollow limbs may be stored until appropriate locations within
these areas have been identified by the Site Ecologist. The number, size
and location of the hollow limbs placed in the Open Space areas will be
determined by the Site Ecologist in consultation with Council.

Other logs may be collected for placement within habitat areas as shelter
sites for reptiles and amphibians. The number, size and location of the logs
placed in the Open Space areas will be determined by the Site Ecologist in
consultation with Council.

Such logs and hollow limbs shalt be positioned so that a fire hazard is not
created.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 13

Page 86

 

Fauna Management Plan

 

7 CONTROLS / CORRECTIVE ACTIONS

7A Where appropriate the Surveyor, Site Ecologist, Project Manager and
Contractor shall discuss the demarcation of significant areas to minimise
the potential for accidental disturbances.

7.2 The boundaries of Open Space areas to be clearly defined either by
fencing (eg. orange webbing) or taping or a combination of both.

7.3 Relevant provisions of Local, State and Commonwealth Government
Legislation/Policies to be obeyed by the Contractor.

 

Q06030/AM/FMP/RW5S JAMES WARREN & ASSOCIATES PTY LTD 14

Page 87

 

Fauna Management Plan

 

8 OPERATIONAL PHASE ON-GOING MANAGEMENT

Nest boxes, if installed in Open Space areas, shall be inspected for colonisation by
exotic bees (Apis melinifera) and maintained on an annual basis. If colonisation has
occurred, the nest box shall be removed and replaced. Inspections shall occur in
winter to avoid disturbance to breeding animals. Nestboxes within the retained
vegetation areas shall be maintained by the landholder or other designated
person/body/agency.

 

Q06030/AM/FMP/RW5 JAMES WARREN -& ASSOCIATES PTY LTD 15

Page 88

 

Fauna Management Plan

 

9 PERFORMANCE INDICATORS
9.1 Introduction

The objectives of this management program are to ensure long term utilisation of
retained habitat by fauna which currently utilise the area and to minimise harm to
fauna during site clearing operations.

This section provides specific performance criteria against which success may be
measured.

9.2 Performance Indicators

The following performance criteria are to be used to determine the success of this
management program:

+ The risk (of injury and death) to fauna is managed and minimised during site
clearing works;

+ Retained habitat is not compromised by site clearing works, gross
mechanical disturbance or impacts associated with sedimentation and/or
potlutant export from the development area; and

+ Fauna species continue to utilise the retained habitat area post
development.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 16

Page 89

 

Fauna Management Plan

 

10 REFERENCES

Hanger (2006) Draft Queensland Code of practice for the welfare and management
of wild animals affected by land-clearing and the modification or
destruction of wildlife habitats and wildlife spotter/catchers,

NSW National Parks and Wildlife Service (2001) Hygiene protocols and the control
of disease in frogs, Information Circular Number 6. NSW NPWS, Hurstville
NSW.

URS Australia Pty. Ltd. (2003b) Concept Stormwater Management Plan for Noosa
Shire Business Centre - Stage 1. a report for Stockwell Pty. Ltd.

URS Australia (2006) Tetrex Properties Site Flood Study, a report to Ken Hicks &
Associates.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 17

Page 90

 

Fauna Management Plan

 

11. APPENDIX 1 - INDICATIVE FAUNA FRIENDLY FENCE DESIGN

tdeaity a Fauna Friendly Fence should have

either:

1. A 50cm gap between ground level and the
first rail or strand. Spacing above this level
is at the owner's discretion.

2. Aseries of 30cm gaps between the rails or
strands (the first gap should be no higher
than 15cm above ground level).

  

Tre ee
i te.
Ti po =<

3. A 15cm gap between ground level and the
first rail or strand followed by a series of
30cm gaps.

Box wire mesh (squares of no less than Fencing materials ; /

15cm) may be used provided that there is a_ When choosing your fencing materials,
15cm gap between the ground level and the consider the environment in which it will be
mesh, and provided the fence is not more Situated. The character of an area,

than 1.2m in height. A capping rail along whether it is of a rural, bush or park nature,

the top allows for easy movement. attracts residents to live within its
: » boundaries and as such should be taken

wine hd into account when designing fences.
Fry
Re

S

Wood, brick, metals and wire can be
combined in a variety of designs to create
. t : an effective and unique fence while

_ } Cue maintaining the character of the area.

‘ ; Slight variations in the materials and design
of these fences can create an individual
look for your property.

Note: Rails should not be in excess of 15cm _ Barbed wire and electric fences of any
wide. Wire strands should not be too tightly description are definitely NOT fauna
strung. friendly!

  

Fauna Friendly Fence Design Guidelines: Source Redland Shire Council Fact Sheet: Fauna
Friendly Fencing.

 

Q06030/AM/FMP/RW5S JAMES WARREN & ASSOCIATES PTY LTD 18

Page 91

JAMES WARREN & Associates Pty Ltd =->7

©
ENVIRONMENTAL CONSULTANTS wy
Le

?

1

 

 

PUBLIC OPEN SPACE MANAGEMENT PLAN

LOT 1 RP215933, EENIE CREEK ROAD

NOOSAVILLE

JUNE 2007

A REPORT TO KEN HICKS & ASSOCIATES PTY LTD

Brisbane Office Head Office Sunshine Coast Office

Suite 28 Cathedral Village PO Box 490 Office 12 Caloundra City Centre
115 Wickham Street ALSTONVILLE NSW 2477 51-55 Bulcock Street
FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778 CALOUNDRA QLD 4551

PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011

Fax: (07) 3257 2708 Fax: (07) 5437 8022

 

 

 

Page 92

Public Open Space Management Plan

 

TABLE OF CONTENTS

1. INTRODUCTION ............... aeveeee setecnnenseresesseanaens cease neeeeenennseesoanas 3
Background........ 3
AIM oo... ccecceeeeeoeees 3
3
3
4

  

Site Description .....
Topography and Aspect..................00- wee
Vegetation Communities and Geology ...............ccccescsceesccsecesceses

1

2

3

4

5

PUBLIC OPEN SPACE DESIGNATION ......cccccccsccresscscsssssessseereene 5
1 Designation of Public Open Space Management Units ......... 5
2.1.1 Open Space (Conservation and Waterway Protection)..... 5
2.1.2 Open Space (Environmental Drainage and Conservation) 5
2 Infrastructure required for Public Open Space Management Units ..... 6
2. 6
2. 6
3 6
4 7
T

1

2

3

oe ee ee ey

2
2

 

2
2.1 Open Space (Conservation and Waterway Protection) ............06665
2.2 Open Space (Environmental Drainage and Conservation)....
Role of the Open Space...........cccceceenensenceesscesceercencenne aoe
Open Space Values ...........ccecccecerecscecetecnserscntersceecescnereeseeeneees

 

2.

2.
3 HREATS TO OPEN SPACE VALUEBG...............50.5 sseeceaneeeensenenser 8

INtrOdUCTION..........cccecsececeevcevseveerees

Environmental Threats ...

3.
3. oe
3. Anthropogenic Threats .........:esscsscecenccccecsscsseusserecsceessesesesceece

 

4 OPEN SPACE MANAGEMENT PROGRAMG..........:c00008 seseeeneneenes 9
4.1 Existing Management Issues
4.2 General Management............ccccesscsccscecencncceeeesecnserenersesseevesence
4.2.1 OPeN SPACE ....cecececececenceccneseneesene esse etter teen eeeeseneen ees teeaeens
4.2.2 Public SAfCtY 20... . cc cece enc enc tec nee een tceeceeneneees

4.3 Environmental Management ............csceceseeceneseees
4.3.1 VOGCLATION 00... ccc ccc sec ence eeeneenconeeeeneeeeseeeeenee
4.3.2 Fauna & Habitat ......ccc ccc es ce scenes enseeeeeeenee
4.3.3 Ecological Corridors ..............ccececeeneeeeneneeas

4.4. Management of Threats to Open Space Values
4.4.1 INEFOMUCEION «0.0... cece cence cece tees ee eneeeeneeseere ones
4.4.2 Environmental Threats............cccscceseeeneneeeeee sees
4.4.3 Anthropogenic TRreats.........cccccccece scree eee eneeeeeteeneeeeeeeteeneees

6 REFERENCES. ........cccsssssscenscsonssenscnsaneensanecanseeessetseseseanseeees TO

   

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 2

Page 93

ae
cP

Public Open Space Management Plan

1 INTRODUCTION

1.1. Background

James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates
Pty Ltd, on behalf of S & L Developments Pty Ltd, to prepare a Public Open Space
Management Plan (POSMP) for a proposed development at Eenie Creek Road,
Noosaville (FIGURE 1).

The subject site forms a part of land envisaged to be developed as the Noosa Shire
Business Centre (NSBC). The development of the NSBC site is to be guided by
Master Plan 2 (MP2), which was developed after seven (7) years of town planning.
Stage 1 of the NSBC occurs immediately to the east of the subject site and is
currently under development.

1.2 Aim

The aim of this POSMP is to direct the management of Public Open Space areas
within the proposed development. Public Open Space areas designated under MP2
include:

¢ QS2 (Conservation an Waterway Protection) in the southern portion; and
¢ 054 (Environmental Drainage and Conservation) in the central portion.

1.3 Site Description

The subject site is located at Eenie Creek Road, Noosaville and is described as Lot
1 on RP215933, Parish of Tewantin, Shire of Noosa. The site is bounded by Eenie
Creek Road to the north, industrial development to the west, Eenie Creek to the
south and Stage 1 of the NSBC to the east. The subject site is approximately 21.97
hectares (ha) in area.

A child-care centre and other associated built infrastructure occurs within the
northern portion of the site. In addition, numerous vehicle tracks occur throughout
the site.

1.4 Topography and Aspect

The topography of the subject site is slightly undulating and slopes at 1.5% to the
south towards Eenie Creek. The site is of low elevation occurring at RL 13.0 m in
the north and falling to RL 1.5 m at Eenie Creek. Numerous depressions occur
throughout the site, particularly within the lower-lying areas to the south. A
drainage line occurs within the eastern portion of the site, which joins to a
drainage tine within the NSBC to the east, below the Qi00 Average Recurrence
Interval (ARI) level at RL 2.8 m level (URS 2006).

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 3

Page 94

 

ae

THE

ey ad 1} SO Rea

 

SSS =

 

 

   

 

 

 

Noosa
Aine
Paes * %§
howe
R Cetrouse
Lake
Weyba
Legend
=] Subject Site
Noosa Shire Business Centre
0 500m
at)
ear CLIENT TITLE
J J
SOURCE, Bebe C60 Ken Hicks & Associates Pty Ltd FIGURE 1
nen PROJECT
SCALE: 1: 20000 @A4 Open Space Management Plan PREPARED. BW Stat
t 1 on RP215933 ;
JAMES WARREN & ASSOCIATES PTY LMTED J} £1" DATE: 06 June 2007

Environmental Consultants

 

 

 

 

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

 

FILE: Q06030_OSMP Locality.cdr

 

 

 

Page 95

ze
2

Public Open Space Management Plan

 

1.5 Vegetation Communities and Geology

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the
southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera)
occur in the northern portion. An aerial photograph depicting vegetation coverage
is presented in FIGURE 2. Four (4) vegetation communities have been identified as
occurring within the subject site (FIGURE 3), including:

e Mid-high Open Forest (Avicennia marina subsp. marina and Melaleuca
quinquenervia);

e Open Forest (M. quinquenervia and Eucalyptus robusta + Corymbia
intermedia, Lophostemon suaveolens and Livistona australis);

¢ Open Forest (E. grandis, E. microcorys and Syncarpia glomulifera + M.
quinquenervia and E. robusta); and

¢ Open Forest (E. robusta, L. suaveolens, E. resinifera, S. glomulifera and C.
intermedia).

Much of the vegetation within the site was cleared during the 1970’s and has been
recently subjected to fire.

The lower portions of the site are described as occurring on Land Zone 3
(Quaternary alluvium) and the higher portions are described as occurring on Land
Zone 9-10 (Sedimentary rocks and sandstone ranges) in accordance with the
Queensland Herbarium land zone classification system.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 4

Page 96

 

0

 

100 200m

Legend
Subject Site
Noosa Shire Business Centre

 

 

 

 

 

 

 

SOURCE: Google Earth 2006 Aerial Photograph

SCALE

1: 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY LIMITED

Environmental Consultants

 

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Open Space Management Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 2

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_OSMP_Aerial.cdr

 

TITLE

AERIAL
PHOTOGRAPH

 

 

Page 97

 

 

0 100 200m
es

aa
a)
(a)
C4
i
co
a

 

Community 1: Mid-high Open Forest (Avicennia marina subsp
marina and Melaleuca quinquenervia)

Community 2: Open Forest (M. quinquenervia and Eucalyptus robusta
+ Corymbia intermedia, Lophostemon suaveolens and Livistona australis)
Community 3: Open Forest (E. grandis, E. microcorys and

Syncarpia glomulifera + M. quinquenervia and E. robusta)

Community 4: Open Forest (E. robusta, L. suaveolens, E. resinifera,

S. glomulifera and C. intermedia)

Dam

Buildings

RL 2.8

RL 3.0

Subject Site

Noosa Shire Business Centre

 

SOURCE: JWA Site Investigations, URS Flood
Inundation Line

SCALE: 1: 8000 @ A4

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consuttants

 

 

CLIENT TITLE

Ken Hicks & Associates Pty Ltd FIGURE 3
PROJECT VEGETATION

Open Space Management Plan
Lot 1 on RP215933 RREPARED: BA COMMUNITIES
Eenie Creek Road, Noosaville, QLD Scones

Noosa Shire Council LGA OSMP_Veg.cdr

 
 

 

 

 

 

Page 98

Be
2

Public Open Space Management Plan

 

2 PUBLIC OPEN SPACE DESIGNATION

2.1 Designation of Public Open Space Management Units

The Shire Business Centre Master Plan: Stage 2 (MP2) (Weychardt 2003) details the
intent of Open Space areas within the NSBC, which includes the subject site. This
POSMP has been prepared in accordance with the general intents for these areas.
Public access into Open Space areas within the subject site is not considered a use
for these areas.

Open Space areas are identified on FIGURE 4.

2.1.1 Open Space (Conservation and Waterway Protection)

The Open Space area designated as OS2 (Conservation and Waterway Protection)
provides primarily for conservation uses and retention of habitat linkages from
Noosa National Park and riparian Open Space along Eenie Creek. These Open Space
areas underpin the key ecological values of the site. MP2 states:

a. “Land within Sub-Precinct OS2 is to be dedicated to the Crown or Council
for Open Space purposes. That part of the Sub-Precinct adjacent to the
Recreation/Mixed Use Precinct may be acceptable in private ownership
depending on the nature of any proposed use.

b. No development except for tracks for pedestrian access or for essential
environmental management purposes.

c. Pedestrian access is to be limited to designated tracks.

Vehicular access, apart from for essential environmental management
purposes, will be precluded.”

Note that pedestrian access within all Open Space on the subject site will not be
provided. Footpaths and other infrastructure may be provided at the edge of Open
Space areas. MP2 envisages that OS2 is to be dedicated to the Crown or to Council
for open space purposes.

2.1.2 Open Space (Environmental Drainage and Conservation)

The OS4 (Environmental Drainage and Conservation) area contains vegetation
within the drainage lines on the NSBC site and the subject site and includes some
wetland areas. MP2 states:

“These Open Space areas are provided to encompass the drainage lines and
wetland areas that drain into the southern portion of the site and eventually
Eenie Creek. OS4 contains habitat for significant species such as Elf skink
(Eroticoscincus_graciloides), Cooloola blind snake (Ramphotyphlops silvia)
and Wallum froglet (Crinia tinnula). The objectives of these areas are to
protect the ecological values and to provide drainage paths for polishing

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 5

Page 99

 

-@

 

 

 

OS3

 

B1

B2

B3

E1

E2

E3

E4

ES

E6

E7

os1

Os2

Os3

Os4

oss

OS6

OS7

RES

REC/MU

 

Legend

BUSINESS

(Retail Centre & Business)

BUSINESS

(Car Parking & Offices)

BUSINESS

(Showroom, Offices & Business)
EMPLOYMENT

(Technology Based R&D Business Offices & Civic)
EMPLOYMENT

(Educative & Environmental R&D Business & Offices)
EMPLOYMENT

(Environmental R&D Business & Offices)
EMPLOYMENT

(Industry & Business)

EMPLOYMENT

(Industry & Business)

EMPLOYMENT

(Business Offices & Transit)
EMPLOYMENT

(Business & Offices)

OPEN SPACE

(Environmental)

OPEN SPACE

(Conservation & Waterway Protection)
OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Environmental Drainage & Conservation)
OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Environmental Drainage)
RESIDENTIAL

(Employment Support)

RECREATION MINOR MIXED USE
(Minor recreation / minor mixed use or open space)
Bicycle Path

Walking Path

RL 2.8

RL 3.0

OS2 Conservation & Waterway Protection

 

 

 

{__] OS3 Preservation of Visual Amenity
MM 0S4 Environmental Drainage & Conservation
[HN ~OS6 Preservation of Visual Amenity
co Subject Site
Noosa Shire Business Centre
0 150m
Se
1: 5000
CLIENT THLE
SOURCE: Hopgood Ganim Lawyers (05.04.04) .
(Ref. Stage2Masterplanv6 pdf); URS Flood oS Associates Ply Ltd FIGURE 4
Inundation Line OPEN SPACE
SCALE 1 san @As fice PREPARED Bw AREAS
JAMES WARREN & ASSOCIATES PTY UMITED I Eenie Creek Road, Noosaville, OLD DATE: 06 June 2007
Environmental Consultants Noosa Shire Council LGA FILE:Q06030_OSMP_openspace.cd

 

 

 

 

 

 

 

 

 

Page 100

Ee
2

Public Open Space Management Plan

 

previously treated stormwater runoff, as well as providing key Open Space
for aesthetic purposes through the site.”

2.2 Infrastructure required for Public Open Space Management Units

2.2.1 Open Space (Conservation and Waterway Protection)

The 0S2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency
vehicles and Council maintenance vehicles. All unnecessary existing tracks and
trails will be closed off and rehabilitated and vehicle access points will be limited
to as few as possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created
within this area to provide access for fire fighting vehictes and to ensure
compliance with bushfire management objectives. This fire break will have a
minimum width of ten (10) metres, which will involve the clearing of all
vegetation. Other fire breaks will be created within this Open Space area, however
these will require the clearing of vegetation to a four (4) metre width. The location
of all fire breaks will take into account the requirement to retain habitat trees,
where possible.

2.2.2 Open Space (Environmental Drainage and Conservation)

No infrastructure is proposed to occur within the OS4 area as all stormwater will be
treated prior to discharge into the drainage line.

2.3 Role of the Open Space

TABLE 1 below, identifies the role of Open Space in the given context.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 6

Page 101

 

Public Open Space Management Plan

 

 

TABLE 1
ROLE OF OPEN SPACE
[Context | Role ]
Local The role of Open Space within the local context will be one of protection and conservation

of the ecological values and significant fauna habitats of the site as well as the protection
of water quality of overland and stormwater flow into Eenie Creek.

The use of Open Space within the subject site and the NSBC by the tocal community will be ,
primarily that of visual amenity and conservation uses. No Public access shall be provided
within Open Space areas.

The primary users of the Open Space areas will be workers and visitors to the NSBC. |
Additionally, Open Space will have a significant role in the provision of visual amenity for
the local community and visitors to the centre.

 

District | The role of Open Space in a district context includes the conservation and protection of a
e@ Portion of the Shire’s ecological values.

 

 

 

. Regional | The role of Open Space within the regional context is for enhancement of regional

| ecological vatues due to its proximity to Noosa National Park and Lake Weyba to the east |

and Tewantin State Forest to the west. The Open Space areas contribute to an important
corridor linkage between these features and other regional significant ecological features. |

 

|

The following table identifies the values of Open Space areas within the subject
site.

TABLE 2
OPEN SPACE VALUES
Value Elements
@ Environmental values

 

 

Vegetation communities

Significant fauna species

Habitats including habitat trees and vegetated areas
Corridor linkages

Drainage line and wetland areas

Vegetation

Flora & fauna

Landscape

Surface water run-off control and water quality

Visual amenity within business and residential precincts

 

Visual amenity values

 

Business
owners/operators,
| visitors

 

 

 

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 7

i
i
i
i
i
i
i
i
i
i
i 2.4 Open Space Values
i
i
a
i
i
i
i
i
i
i

Page 102

Ee
a

Public Open Space Management Plan

3 THREATS TO OPEN SPACE VALUES

3.1. Introduction

The values of Open Space areas may be compromised by various factors. These
may stem from the environment or may be anthropogenic in nature. The following
sections identify possible threats to Open Space values.

3.2. Environmental Threats

These threats result from biotic factors and include invasion of weeds such as
Lantana (Lantana spp.) and Singapore daisy (Sphagneticola trilobata); damage
caused by uncontrolled domestic and feral animals such as cats (Felis catus), dogs
(Canis domesticus), pigs (Sus scrofa) and other exotic species; erosion and
sedimentation resulting in degraded areas with limited environmental value; and
altered fire regimes.

3.3 Anthropogenic Threats

These threats occur as a result of human activities and often have environmental
ramifications. For example, the dumping of garden refuse in areas of Open Space
may result in the colonisation of the area by exotic weed species. Edge effects,
particularly in areas that abut residential areas are likely to result from the
dumping of excess of garden or landscaping waste and other household material,
physical disturbance from informal access including vehicular access, the extension
of ‘backyards’ into adjacent Open Space and the removal of vegetation.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 8

Page 103

Ee
Se

Public Open Space Management Plan

4 OPEN SPACE MANAGEMENT PROGRAMS

4.1 Existing Management Issues

The Open Space areas are located on land, which have a number of existing and
on-going land management issues relevant to the Open Space areas within the
proposed development. The existing management issues are summarised below.

TABLE 3

EXISTING MANAGEMENT ISSUES

 

 

[ Issue Description & impact ]
Vegetation and ¢ The site is predominantly vegetated with native remnant and regrowth !
environmental bushland, however portions (particularly within the north) have been :
| weeds degraded by physical impacts (vegetation clearing, unsuitable fire regimes)
and environmental weed invasion.
| Site access and °

 

Vehicle tracks

Access to the subject site is provided off Commerce Court to the existing
Child Care Centre.
e A number of old vehicle tracks, traverse the site and several of these are
in a degraded state e.g. irregular surface causing some minor erosion.

 

Natural and ¢ An existing child care centre and associated infrastructure is located in the
constructed northern portion of the site.
features e

 

4.2 General Management

4.2.1 Open Space

The site abuts an electricity easement and development of Stage 1 of the
NSBC to the east and existing industrial areas to the west.

e Aconstructed dam is located in the central portion of the site.
The site abuts Eenie Creek to the south and Eenie Creek Road to the north.

The following provides information regarding the general management of Open

 

 

 

Space.
TABLE 4
GENERAL MANAGEMENT OF OPEN SPACE ACTION AND DESIRED OUTCOMES
Actions Desired outcomes |
The Open Space (Conservation and Waterway |

Protection) is to be managed as part of a larger
conservation area for the retention and protection of
significant species and their habitat and to retain
corridor values.

The Open Space (Environmental Drainage and
Conservation) is to be managed to provide a polishing
service for primary treated stormwater before release
into the wetland areas and Eenie Creek.

Some existing vehicle tracks may be embellished and
graded for use as fire trail or fire breaks. Other
vehicle tracks will be closed and rehabilitated in
accordance with the Site Rehabilitation Plan (JWA
2007), if required.

 

The Open Space is to be |
managed in accordance with *
Council’s policies and

practices. '
All trees with a diameter at |
breast height (dbh) of 300 mm |
or greater are retained along ,
the Open Space development |
interface/unless they are |
unsafe or their retention is |
not practical. |
Low visual and physical -
impact signage is used within |

 

 

Q06030/AM/POSMP/RW5

James Warren & Associates Pty Ltd

Page 104

Fd
NS

Public Open Space Management Plan

 

Actions Desired outcomes

 

 

Vehicle access trails and fire breaks are to be
managed to minimise incidents of erosion and
environmental weed establishment along the entire
length of tracks.

Any signage used within Open Space areas is to be
kept at a minimum and to comply with Council policies
and practices.

All signs are to be vandal proof where possible and
compliment the environmental setting within which
they are to be located.

the Open Space.

 

 

4.2.2 Public Safety

The following provides information regarding the Public Safety adjacent areas of
Open Space.

TABLE 5
PUBLIC SAFETY ACTIONS AND DESIRED OUTCOMES

 

Actions Desired outcomes

 

« Lighting - In OS3 and OS6 areas, lighting is to be |* The Open Space _ is

provided in accordance with The Community Use Code
of The Noosa Ptan (2006) and Australian Standard
‘AS4282’ - The Control of the Obtrusive Effects of
Outdoor Lighting.

Stormwater detention areas - The location of
stormwater detention areas that occurs adjacent to

managed to ensure the
safety of the public. All
potential safety hazards
are identified and
education signage _is
erected to minimise the

 

Open Space have been identified in the Stormwater risk to the public and to
Management Plan (BGA 2006). Signage educating the fulfil Council’s duty of
public as to the risks associated with these areas care.

during flooding and consumption of water contained
within is to be erected.

« Roadways - Areas of Open Space adjacent to roadways
(i.e. 053, OS4 and OS6), are to be treated in such a
manner as to provide maximum visibility of
pedestrians to motorists. Signage, informing motorist
and pedestrians of the potential risks associated with
such areas should be erected.

« Education - information packages informing business
owners/operators of potential risk areas and
emergency contact numbers should be supplied.

 

|
|
|
|
|

 

4.3. Environmental Management

4.3.1 Vegetation

The following provides information regarding vegetation management within areas
of Open Space.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 10

Page 105

 

Ee
3

Public Open Space Management Plan

 

TABLE 6

VEGETATION MANAGEMENT ACTIONS AND DESIRED OUTCOMES

Actions

Adoption of the Site Rehabilitation Plan and Vegetation | «

Management Plan for the subject site (JWA 2007).
Where necessary, reinforcement plantings and/or
understorey thinning shall be undertaken in 0S2, OS3, OS4 &

OS6 to restart the stalled regenerative processes and | «

facilitate ecological sustainability. Any reinforcement
plantings and/or understorey thinning should be completed
in accordance with the Site Rehabilitation Plan (JWA 2007).

The design and construction of adjacent roads, drainage and
other works shall not adversely impact on existing native

vegetation. e

All vegetation which is to be retained within Open Space
areas is to be protected during operational works.

The interface between the development footprint and Open
Space is to be fenced using temporary fencing (orange
webbing or other suitable fencing) during operational works
to reduce damage to Open Space.

Vehicle access trails and fire breaks are to be managed to
minimise incidents of erosion and environmental weed
establishment along the entire length of tracks.

All trees with a dbh of 300 mm or greater, located along the
interface of Open Space and the development footprint, are
to be retained where possible and where they do not present
a safety hazard to proposed buildings or infrastructure.

The vegetation is to be maintained in accordance with the
recommended actions contained in the Fire Management
Plan (JWA 2007).

 

Desired outcomes |
Adoption of the Site |
Rehabilitation Plan and
Vegetation Management Plan '
(JWA 2007). '
All vegetation within areas |
designated for Environmental
or Environmental Drainage
uses are managed for
conservation and water
quality values. |
All trees with a dbh of 300
mm or greater are retained
within the interface between |
Open Space and the
development footprint. i

 

4.3.2 Fauna & Habitat

The following provides information regarding the Management of Fauna and Habitat

within areas designated as Open Space.

 

 

TABLE 7
FAUNA HABITAT ACTIONS AND DESIRED OUTCOMES
Actions . Desired outcomes ]
l e Adoption of the Fauna Management Plan for the subject site; « Adoption of the Fauna
(JWA 2007). Management Plan for the

All significant fauna species occurring on the subject site are

to be managed in accordance with the actions recommended | «

within the Fauna Management Plans (JWA 2007).
All habitats within Open Space should be maintained as
much as practicable at or near their current state,

particularly within OS2 and 0$4 designated areas. .

Runoff into the existing drainage line shall be monitored to
ensure the water quality is maintained at current or higher
standards. Stormwater shall be managed according to the
Stormwater Management Plan (BGA 2006) to minimise

 

subject site (JWA 2007).
All. significant fauna species
within Open Space to be

protected from significant
disturbance.
All habitats within Open

Space are protected during
and after operational works.

 

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd

11

Page 106

BE
se

Public Open Space Management Plan

 

Actions

impacts on fauna species which utilise this resource within
the drainage line and wetland areas.

All drainage lines within Open Space areas are to be
protected from sedimentation and physical disturbance
during on site works to protect micro-habitats, as outlined in
the Vegetation Management Plan (JWA 2007) and
Stormwater Management Plan (BGA 2006).

 

4.3.3 Ecological Corridors

The following provides information regarding the general

ecological corridors contained with Open Space.

TABLE 8

Desired outcomes

ECOLOGICAL CORRIDORS ACTIONS AND DESIRED OUTCOMES
Desired outcomes

Actions
The Eenie Creek ecological corridor in the southern portion

of the subject site is to be retained. In addition, corridors | «

along drainage lines in Open Space areas are to be retained.

Appropriate erosion and sediment control measures shall be
in place in accordance with Schedule 2 of The Noosa Plan
(Erosion and Sediment Control Assessment) and the

Stormwater Management Plan (BGA 2006). Control measures | «

shall be in place to reduce and minimise disturbance to
riparian habitats and corridor values.

The ecological corridors within Open Space are to be
protected with minimal disturbance during operational
works.

Fencing and signage excluding the public from areas
identified for environmental protection may be erected, if
required.

 

4.4 Management of Threats to Open Space Values

4.4.1 introduction

This section proposes management strategies to mitigate threats to the values of

Open Space as outtined in SECTION 3.2 and 3.3.

4.4.2 Environmental Threats

4.4.2.1. Weeds and Environmental Rehabilitation

The ecological

management of

corridors

J

through and around the Open
Space are protected
maintained during and after

on site development.

Public to be excluded from

Open Space.

The following provides information regarding the management of weeds and areas

to be rehabilitated within Open Space.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd

12

and :

Page 107

 

Public Open Space Management Plan

 

TABLE 9

WEEDS & ENVIRONMENTAL REHABILITATION ACTIONS & DESIRED OUTCOMES

 

Actions
All recommended actions with respect to environmental
weed management are undertaken in accordance with the
Site Rehabilitation Plan, Vegetation Management Plan and
the Fire Management Plan (JWA 2007).
Open Space areas are to be allowed to naturally regenerate
from existing vegetative material where possible.
Vehicle access trails and fire breaks are to be managed to
minimise incidents of erosion and environmental weed
establishment along the entire length of tracks.
The interface between the Open Space is to be fenced and
clearly identified to avoid any “push over” and disturbance
during operational works.
Asparagus fern (Asparagus densifolia), Lantana, Singapore
Daisy (Sphagneticola trilobata) and other environmental
weeds are to be removed from the Open Space using
minimal disturbance methods as outlined in the Vegetation
Management Plan (JWA 2007).
Other environmental weeds which are susceptible to
herbicide treatment are to be sprayed with an appropriate
herbicide. Application of herbicides is to be undertaken by
qualified persons and spraydrift is to be controtled and
limited, e.g. no spraying in windy conditions, or during and
immediately following rainfall events.
Where practicable, all areas degraded by environmental
weeds are to be allowed to naturally re-vegetate. However,
in those areas where the removal or control of
environmental weeds will result in the exposure of soil to
erosion, measures to minimise erosion should be undertaken.

4.4.2.2. Feral Animal Control

 

Desired outcomes ]
All significant environmental |
weeds within the Open Space |
are removed and managed.

All degraded areas are |
allowed to naturally |
regenerate.

All areas subject to erosion |
potential are revegetated.

All unnecessary existing tracks |
and trails will be closed off

and rehabilitated in:
accordance with the Site |
Rehabilitation Plan (JWA ‘

2007).

The following provides information regarding the management of feral animals

within areas of Open Space.

 

 

TABLE 10
FERAL ANIMAL CONTROL ACTIONS & DESIRED OUTCOMES
|. _ _ Actions Desired outcomes ]
| Specific programs are to be designed targeting the following |e Maintain the ecological |

feral and exotic species:

Cats - Cats are prohibited within areas of Open Space.
Trapping regimes with Open Space are to be undertaken
every 1-2 years, if required.

Dogs - Dogs are prohibited within areas of Open Space.
Trapping regimes within Open Space are to be undertaken
every 3-5 years, if required.

Foxes- Fox trapping/baiting regimes are to occur every 2-3
years. Business owners/operators are encouraged to contact
Council when foxes are observed. Additional trapping may
be undertaken as required, if required.

Rabbits/Hares - Rabbit/Hare trapping/baiting regimes are to

 

integrity of the Open Space by |
ensuring the control of feral |
and exotic vertebrate fauna. |

 

Q06030/AM/POSMP/RW5

James Warren & Associates Pty Ltd

13

Page 108

Public Open Space Management Plan

 

 

l _ Actions

Desired outcomes

 

occur every 2-3 years, if required. Business
owners/operators are encouraged to contact Council when
foxes are observed. Additional trapping may be undertaken
as required.

Education programs informing business owners/operators of the
negative environmental impacts of feral and exotic species are
to incorporate strategies designed to mitigate the effects of
domestic species such as cats, dogs and rabbits.

 

4.4.2.3. Erosion and Sedimentation

The following provides information regarding the management of erosion and

sedimentation in Open Space areas.

TABLE 11

EROSION & SEDIMENTATION ACTIONS & DESIRED OUTCOMES

| Actions

e Implementation of the erosion control and sediment | «
management strategies as per the Stormwater Management
Plan (BGA 2006).

'@ All sediment and erosion control devices e.g. swales,
detention basins, infiltration devices are to be located
outside of Open Space. If control devices are necessary
within Open Space, then such devices shall be located in
areas previously disturbed, wherever possible. All
construction practices to utilise minimal disturbance
methods within or adjacent to the Open Space.

e Stormwater outlets, which direct primary treated water into
Open Space (Environmental Drainage), will ensure that the
water velocity is controlled (i.e. detention basins) so as not
to result in downstream erosion.

e All stormwater outlets and structures, which direct water

| into the Open Space (Environmental Drainage), shall be

monitored following significant storm events to ensure the

| natural drainage lines are not degraded by erosion and/or
sedimentation.

, © Appropriate rehabilitation actions such as additional tree

|

 

 

/shrub plantings may be necessary should the drainage line
be impacted by intense run-off and overland flow events.
This would be managed in accordance with Council
guidelines.

 

4.4.2.4. Bushfire

Desired outcomes —_-
Integration of the control
measures outlined within the
Stormwater Management Plan
(BGA 2006) to reduce erosion
and sedimentation.

The following provides information regarding the management of bushfires within

Open Space areas.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd

14

|
|

 

Page 109

ot
@

Public Open Space Management Plan

 

TABLE 12

BUSHFIRE ACTIONS & DESIRED OUTCOMES

 

Actions

Desired outcomes ]

 

 

The actions as recommended within the Fire Management
Plan (JWA 2007) are implemented in accordance with that
plan.

The use of mulch is permitted as part of the landscaping
practices throughout the development or additional
plantings, if required.

Mulch is not to be used in areas adjacent to any proposed
construction which may be damaged from a bushfire event
e.g. public infrastructure, buildings, etc.

A mosaic of management units within the Open Space
(Conservation and Waterway Protection, Environmental
Drainage and Conservation) should be developed, and fuel
reduction burning be completed every 10-14 years within
alternate units.

Access points and hydrants should be kept free from
impediments.

4.4.3 Anthropogenic Threats

4.4.3.1. Gross Pollution/Dumping of Rubbish

 

« The Open Space (Conservation |
and Waterway Protection,
Environmental Drainage and
Conservation) is managed to
ensure the ecological and
environmental values of these |

areas are maintained and
conserved.
e Fuel reduction burning of

each fire management unit
should be undertaken once |
every 10-14 years.

The following provides information regarding the Pollution and Rubbish dumping

within areas of Open Space.

TABLE 13

ANTHROPOGENIC THREATS ACTIONS & DESIRED OUTCOMES

Actions
Fencing should be erected around Open Space to restrict
vehicular access to reduce the likelihood of rubbish
dumping.
Council is to undertake a broad-scale cleanup of the area
within OS2 every 3-5 years unless otherwise directed.
Rubbish removal within other Open Space areas are to be
completed by the Owners/Managers of the development.
The dumping of garden/landscaping rubbish into areas of
Open Space shall be prohibited. It is recommended that the
restrictive covenants over Open Space areas state this.
Council should undertake education strategies, informing
residents of the negative impacts upon fauna and flora of
the dumping of garden rubbish into areas of Open Space. In
addition, signage informing business owners/operators and
visitors that the dumping of rubbish within the Open Spaces
areas is prohibited.

 

Desired outcomes j
The Open Space is managed to
ensure that the ecological and
environmental values of the site
are maintained and conserved
through the minimisation of
rubbish dumping within the area.

 

4.4.3.2. Informal Access/ Edge management

The following provides information regarding the management of edges and

informal access to areas of Open Space.

 

Q06030/AM/POSMP/RW5

James Warren & Associates Pty Ltd

15

Page 110

ce

Public Open Space Management Plan

TABLE 14

INFORMAL ACCESS/EDGE MANAGEMENT ACTIONS & DESIRED OUTCOMES

 

|

' Pre-development to completion of site works:
The edge of the Open Space is clearly identified and the | «

Actions

interface between the development footprint and the Open
Space is to be fenced with temporary fencing.

All environmental weeds along the edge of the Open Space | e

are to be removed and controlled.

The edge is to be assessed bi-monthly to determine if new
environmental weed species have been introduced to the
disturbed area along the Open Space interface.

Where practicable, no vegetation is to be pushed into or

deposited along the edge of the Open Space areas. °

Public access to Eenie Creek will not be encouraged.

 

Desired outcomes ]

The edge of the public and |
private Open Space is defined

by temporary fencing |
The edge of the public and |
private Open Space is clearly

identified and protected with |
a 5 metre grassy buffer during |
all site works — including |
operational works.

All unnecessary existing tracks |
and trails will be closed off

and rehabilitated —in |
accordance with the Site |
Rehabilitation Plan (JWA

2007). |

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd

16

Page 111

Public Open Space Management Plan

 

5 SUMMARY

James Warren & Associates have been engaged by Ken Hicks & Associates to
prepare a Public Open Space Management Plan (POSMP) for a proposed
development at Eenie Creek Road, Noosaville. The subject site is part of land
envisaged to be developed as the Noosa Shire Business Centre (NSBC).

Development within the NSBC is to be undertaken according to the Noosa Business
Centre Masterplan - Stage 2 (MP2). MP2 details areas of Open Space within the
subject site and the intents for each Open Space unit. Public access within Open
Space areas will be discouraged.

The intent of Open Space (Conservation and Waterway Protection) is for the
retention and conservation of the significant ecological values within this area. The
intent of Open Space (Environmental Drainage and Conservation) is for the
retention and conservation of the significant ecological values of this area and to
provide secondary stormwater treatment of runoff from allotments. The intent of
Open Space (Preservation of Visual Amenity) is to provide a screen and landscaping
within the developed areas of the subject site.

Proposed infrastructure requirements for these areas are covered in Section 2.2.
Section 2.3 and 2.4 discuss the role of Open Space and the values of Open Space
respectively.

Threats to the values of Open Space are discussed in Section 3, and management
programs to mitigate these threats are proposed in Section 4.4. In addition,
management in terms of general management (Section 4.2) and Environmental
Management (Section 4.3) are also proposed.

All works are to be undertaken on land to be maintained as Open Space at no cost
to Council before the commencement of the “maintenance period”. The timing of
works pre and post this period is contained within Section 4 of this report.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 17

Page 112

&
2

Public Open Space Management Plan

6 REFERENCES

Barlow, Gregg & Associates (2006) Stormwater Management Plan, a report for Ken
Hicks & Associates.

 

James Warren & Associates (2007) Vegetation Management Plan, a report to Ken
Hicks & Associates.

James Warren & Associates (2007) Fauna Management Plan, a report to Ken Hicks &
Associates.

James Warren & Associates (2007) Fire Management Plan, a report to Ken Hicks &
Associates.

Weychardt, R. (2003) Shire Business Centre Master Plan: Stage 2, Planning Study for
The Noosa Plan (Noosa Council).

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 18

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.