Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Ee 2 Public Open Space Management Plan previously treated stormwater runoff, as well as providing key Open Space for aesthetic purposes through the site.” 2.2 Infrastructure required for Public Open Space Management Units 2.2.1 Open Space (Conservation and Waterway Protection) The 0S2 (Conservation and Waterway Protection) area is to be retained in a near- natural state, therefore limited infrastructure is required within this area. Some clearing of vegetation may be required for fire trails/breaks. Public access to Eenie Creek will not be encouraged. Walking tracks and jetties will not be constructed. Playground and picnic facilities, rubbish bins and other facilities associated with recreational parkland will not be provided. Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles. All unnecessary existing tracks and trails will be closed off and rehabilitated and vehicle access points will be limited to as few as possible. The Fire Management Plan (JWA 2007) recommends that a fire break be created within this area to provide access for fire fighting vehictes and to ensure compliance with bushfire management objectives. This fire break will have a minimum width of ten (10) metres, which will involve the clearing of all vegetation. Other fire breaks will be created within this Open Space area, however these will require the clearing of vegetation to a four (4) metre width. The location of all fire breaks will take into account the requirement to retain habitat trees, where possible. 2.2.2 Open Space (Environmental Drainage and Conservation) No infrastructure is proposed to occur within the OS4 area as all stormwater will be treated prior to discharge into the drainage line. 2.3 Role of the Open Space TABLE 1 below, identifies the role of Open Space in the given context. Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.