Skip to the record
The only place to find full transcripts.

Council archive · source document

07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242

of 112

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Ee
2

Public Open Space Management Plan

 

previously treated stormwater runoff, as well as providing key Open Space
for aesthetic purposes through the site.”

2.2 Infrastructure required for Public Open Space Management Units

2.2.1 Open Space (Conservation and Waterway Protection)

The 0S2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency
vehicles and Council maintenance vehicles. All unnecessary existing tracks and
trails will be closed off and rehabilitated and vehicle access points will be limited
to as few as possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created
within this area to provide access for fire fighting vehictes and to ensure
compliance with bushfire management objectives. This fire break will have a
minimum width of ten (10) metres, which will involve the clearing of all
vegetation. Other fire breaks will be created within this Open Space area, however
these will require the clearing of vegetation to a four (4) metre width. The location
of all fire breaks will take into account the requirement to retain habitat trees,
where possible.

2.2.2 Open Space (Environmental Drainage and Conservation)

No infrastructure is proposed to occur within the OS4 area as all stormwater will be
treated prior to discharge into the drainage line.

2.3 Role of the Open Space

TABLE 1 below, identifies the role of Open Space in the given context.

 

Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 6

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.