Skip to the record
For the highest quality transcripts.

Council archive · source document

07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242

of 112

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Ee
Se

Public Open Space Management Plan

4 OPEN SPACE MANAGEMENT PROGRAMS

4.1 Existing Management Issues

The Open Space areas are located on land, which have a number of existing and
on-going land management issues relevant to the Open Space areas within the
proposed development. The existing management issues are summarised below.

TABLE 3

EXISTING MANAGEMENT ISSUES

 

 

[ Issue Description & impact ]
Vegetation and ¢ The site is predominantly vegetated with native remnant and regrowth !
environmental bushland, however portions (particularly within the north) have been :
| weeds degraded by physical impacts (vegetation clearing, unsuitable fire regimes)
and environmental weed invasion.
| Site access and °

 

Vehicle tracks

Access to the subject site is provided off Commerce Court to the existing
Child Care Centre.
e A number of old vehicle tracks, traverse the site and several of these are
in a degraded state e.g. irregular surface causing some minor erosion.

 

Natural and ¢ An existing child care centre and associated infrastructure is located in the
constructed northern portion of the site.
features e

 

4.2 General Management

4.2.1 Open Space

The site abuts an electricity easement and development of Stage 1 of the
NSBC to the east and existing industrial areas to the west.

e Aconstructed dam is located in the central portion of the site.
The site abuts Eenie Creek to the south and Eenie Creek Road to the north.

The following provides information regarding the general management of Open

 

 

 

Space.
TABLE 4
GENERAL MANAGEMENT OF OPEN SPACE ACTION AND DESIRED OUTCOMES
Actions Desired outcomes |
The Open Space (Conservation and Waterway |

Protection) is to be managed as part of a larger
conservation area for the retention and protection of
significant species and their habitat and to retain
corridor values.

The Open Space (Environmental Drainage and
Conservation) is to be managed to provide a polishing
service for primary treated stormwater before release
into the wetland areas and Eenie Creek.

Some existing vehicle tracks may be embellished and
graded for use as fire trail or fire breaks. Other
vehicle tracks will be closed and rehabilitated in
accordance with the Site Rehabilitation Plan (JWA
2007), if required.

 

The Open Space is to be |
managed in accordance with *
Council’s policies and

practices. '
All trees with a diameter at |
breast height (dbh) of 300 mm |
or greater are retained along ,
the Open Space development |
interface/unless they are |
unsafe or their retention is |
not practical. |
Low visual and physical -
impact signage is used within |

 

 

Q06030/AM/POSMP/RW5

James Warren & Associates Pty Ltd

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.