07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Public Open Space Management Plan l _ Actions Desired outcomes occur every 2-3 years, if required. Business owners/operators are encouraged to contact Council when foxes are observed. Additional trapping may be undertaken as required. Education programs informing business owners/operators of the negative environmental impacts of feral and exotic species are to incorporate strategies designed to mitigate the effects of domestic species such as cats, dogs and rabbits. 4.4.2.3. Erosion and Sedimentation The following provides information regarding the management of erosion and sedimentation in Open Space areas. TABLE 11 EROSION & SEDIMENTATION ACTIONS & DESIRED OUTCOMES | Actions e Implementation of the erosion control and sediment | « management strategies as per the Stormwater Management Plan (BGA 2006). '@ All sediment and erosion control devices e.g. swales, detention basins, infiltration devices are to be located outside of Open Space. If control devices are necessary within Open Space, then such devices shall be located in areas previously disturbed, wherever possible. All construction practices to utilise minimal disturbance methods within or adjacent to the Open Space. e Stormwater outlets, which direct primary treated water into Open Space (Environmental Drainage), will ensure that the water velocity is controlled (i.e. detention basins) so as not to result in downstream erosion. e All stormwater outlets and structures, which direct water | into the Open Space (Environmental Drainage), shall be monitored following significant storm events to ensure the | natural drainage lines are not degraded by erosion and/or sedimentation. , © Appropriate rehabilitation actions such as additional tree | /shrub plantings may be necessary should the drainage line be impacted by intense run-off and overland flow events. This would be managed in accordance with Council guidelines. 4.4.2.4. Bushfire Desired outcomes —_- Integration of the control measures outlined within the Stormwater Management Plan (BGA 2006) to reduce erosion and sedimentation. The following provides information regarding the management of bushfires within Open Space areas. Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 14 | |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.