Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
INTEGRATED PLANNING ACT 1997 Integration of fand use and public transport For more information reter to Guide 23, schedute BA of the IPA, & schedule 2 of the IP Requlation. Unless you answered “none of the above’, the application triggers referral to QT as a concurrence agency. Raitway safety and efficiency For mora information refer to Guide 23, schedule BA of the IPA & schedule 2 of the IP Regulation, Untess you answered “none of the above’, the application triggers referrat to QT as a concurrence agency. Moonie to Brisbane pipeline For more information refer to schedule 2of the |P Regulation. Unless you answered “none of the above’, the application triggers referral to the holder of pipeline licence No 1 Issued under the Petroleum Act 1923, currently Santos QNT Pty Ltd, for advice, 23. 24. IDAS Assessment Checklist, Version 20, 2 Aprit 2007 22. The application involves: (tick the appficable box/es)— LO (i)a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the iP Regulation and exceeding the thresholds set by that schedule. D (i) reconfiguring a tot— C1 (a)_— ontand that is completely or partly within a public transport corridor, and the total number of lots increases; [J (b) _ ontand that is completely or partly within a future public transport corridor or an airport's public safety area; O(c) _ on land that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m? or greater; [1 @) _ fora residential purpose within the 25 ANEF contour for an airport; Cle) fora residential purpose resulting in 100 or more allotments, (1 (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lat mentioned in (ii) above, on land that— (a) _ is completely or partly within a public transport corridor or a future public transport corridor; [1 (b) _ will result in work that encroaches into an airport's operational airspace. EX] (iv) none of the above. The application involves: (tick the applicable box/es)— C (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that schedule, D (ii) reconfiguring a tot— (a) onland that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; (1 (b) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m? or greater, [1 (c) _ on land that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; (Od) on land that abuts rail corridor land, commercial corridor land or future railway land and an easement abutting the corridor or future railway land is created; (Ce) on land that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; ((f) — fora residential purpose resulting in 100 or more allotments. CO iii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m, on land that— C1 (@) _ is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; (1 (b) _ is completely or partly within future railway land, or a railway tunnel easement; [1 (c) abuts rail corridor land, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. [XI (iv) none of the above. The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— C1 (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. LD (ii) reconfiguring a tot LO (il) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. &X (iv) none of the above. Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.