Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
a 2 Vegetation Management Plan 1 INTRODUCTION 1.1 Background James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates Pty Ltd to prepare a Vegetation Management Plan (VMP) for the proposed development site at Eenie Creek Road, Noosaville. The subject site forms a part of land envisaged to be developed as the Noosa Shire Business Centre (NSBC), The NSBC, including the subject site, is the subject of Master Plan Stage 2 (MP2), which sets out future land uses within the NSBC. Stage 1 of the NSBC occurs immediately to the east of the subject site and is currently under development. A number of vegetation surveys and management plans were completed as part of the Stage 1 development process and which are relevant to this VMP. These include: ¢ WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment Study; e URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre Environmental Management Plan; e URS Australia Pty, Ltd. (2003) - Concept Stormwater Management Plan; e Chenoweth Environmental Planning and Landscape Architecture (EPLA) (2004) - Vegetation and Landscape Report; and e Landscape Assessment, Management and Rehabilitation Pty Ltd. (2004) - Flora Report (Planning and Environment Court report for Appeal no. 48 of 2003). 1.2 Site Description The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded by Eenie Creek Road to the north, industrial development to the west, Eenie Creek to the south and Stage 1 of the NSBC to the east. The subject site is approximately 21.47 hectares (ha) in area. The topography of the subject site is slightly undulating and generally slopes to the south towards Eenie Creek. Numerous depressions occur throughout the site, particularly within the lower-lying areas to the south. A drainage lines occurs within the eastern portion of the site, which joins to a drainage line within Stage 1 of the NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at RL 2.8 m level (URS 2006). After prolonged rainfall, ponding of water occurs within ‘ depressions along the drainage line, predominantly below Q100 (URS 2003). A small constructed dam is located in the central portion of the site. The vegetation within the site is composed of predominantly Swamp mahogany (Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur in the northern portion. Much of the vegetation within the site was cleared during the 1970’s and subsequent regrowth vegetation has been subject to frequent fire events. An aerial photograph depicting vegetation coverage is presented in FIGURE 2. Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.