Vegetation Management Plan 2 PROGRAM OF WoRKS 2.1 Vegetation clearing will be carried out as part of the Operational Works for the approved Rol application over the subject site. FIGURE 4 shows indicative vegetation to be retained/lost within the subject site. 2.2 In addition, trees will be retained within residual road reserves, where Practicable and within areas designated as ‘Preservation of Visual Amenity’ on the approved MP2. Vegetation will be retained within Open Space Areas in accordance with the Public Open Space Management Plan (POSMP) (JWA 2007) as follows: Open Space (Conservation and Waterway Protection): The OS2 (Conservation and Waterway Protection) area is to be retained in a near- natural state, therefore limited infrastructure is required within this area. Some clearing of vegetation may be required for fire trails/breaks. Public access to Eenie Creek will not be encouraged. Walking tracks and jetties will not be constructed. Playground and picnic facilities, rubbish bins and other facitities associated with recreational parkland will not be provided. Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles. All unnecessary existing tracks and trails will be closed off and rehabilitated and vehicle access points will be limited to as few as possible. The Fire Management Plan (JWA 2007) recommends that a fire break be created within this area to provide access for fire fighting vehicles and to ensure compliance with bushfire management objectives. This fire break will have a minimum width of ten (10) metres, which will involve the clearing of all vegetation. Other fire breaks will be created within this Open Space area, however these will require the clearing of vegetation to a four (4) metre width. The location of all fire breaks will take into account the requirement to retain habitat trees, where possible. Open Space (Preservation of Visual Amenity): The Open Space 0$3 and OS6 areas will be retained primarily for screening Purposes. Proposed works within these areas shall be limited to minimal landscaping and supplementary plantings of endemic species. Adjacent infrastructure such as footpaths, lighting and signage and stormwater control devices/measures may be included as part of the detailed design stage however, shall not adversely impact on the existing native vegetation. Q06030/AM/VMP/RW6 JAMES WARREN & ASSOCIATES PTY LTD 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.