3 Vegetation Management Plan 4 > VEGETATION PROTECTION AND CLEARANCE MANAGEMENT 4.1 Introduction This section outlines the recommended measures to minimise potential impacts on vegetation. 4.2 Recommended General Management Actions 4.2.1 4.2.2 4.2.3 4.2.4 A relevant plan detailing the staging of works, areas to be retained, significant areas of exclusion and other relevant issues shall be provided to the Project Manager and Ecologist prior to any site preparation activities within the proposed development site. Works shall be conducted only between the hours of 7.00 am and 6.00 pm Monday to Saturday. All trees and areas of vegetation within the proposed works area considered suitable for retention shall be identified. Within these zones the following activities shall not be permitted: Storage and mixing of materials; Vehicle parking; Liquid disposal; Machinery repairs and/or refuelling; Construction site office or shed; Combustion of any material; Stockpiling of soil, rubble or debris; Any filling or excavation including trench line, topsoil skimming and/or surface excavation, unless otherwise approved by the Project Manager; and ° Unauthorised pesticide, herbicide or chemical applications. Prior to the commencement of any vegetation clearance, the Contractor, in consultation with the Project Manager, will discuss all areas to be cleared on construction plans in the field. All areas to be cleared shall be clearly identified on the ground by the Project Manager prior to the commencement of any site preparation activities. Areas to be retained will therefore be clearly identified and no unauthorised access shall be allowed. 4.3 Protection of Retained Vegetation 4.3.1 4.3.2 All activities in areas adjacent to any vegetation to be retained shall to be carried out in such a manner as to minimise damage to the vegetation. Vegetation to be retained will be clearly identified. Each tree or groups of trees to be retained shall be investigated at the appropriate time by an Ecologist/Arborist. Trees should be managed according to the Tree Retention Guidelines in APPENDIX 1. No site preparation shall occur outside nominated zones. Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.