3

Vegetation Management Plan

 

4 > VEGETATION PROTECTION AND CLEARANCE MANAGEMENT

4.1

Introduction

This section outlines the recommended measures to minimise potential impacts on
vegetation.

4.2 Recommended General Management Actions

4.2.1

4.2.2

4.2.3

4.2.4

A relevant plan detailing the staging of works, areas to be retained,
significant areas of exclusion and other relevant issues shall be provided to
the Project Manager and Ecologist prior to any site preparation activities
within the proposed development site.

Works shall be conducted only between the hours of 7.00 am and 6.00 pm
Monday to Saturday.

All trees and areas of vegetation within the proposed works area considered
suitable for retention shall be identified. Within these zones the following
activities shall not be permitted:

Storage and mixing of materials;

Vehicle parking;

Liquid disposal;

Machinery repairs and/or refuelling;

Construction site office or shed;

Combustion of any material;

Stockpiling of soil, rubble or debris;

Any filling or excavation including trench line, topsoil skimming
and/or surface excavation, unless otherwise approved by the Project
Manager; and

° Unauthorised pesticide, herbicide or chemical applications.

Prior to the commencement of any vegetation clearance, the Contractor, in
consultation with the Project Manager, will discuss all areas to be cleared
on construction plans in the field. All areas to be cleared shall be clearly
identified on the ground by the Project Manager prior to the
commencement of any site preparation activities. Areas to be retained will
therefore be clearly identified and no unauthorised access shall be allowed.

4.3 Protection of Retained Vegetation

4.3.1

4.3.2

All activities in areas adjacent to any vegetation to be retained shall to be
carried out in such a manner as to minimise damage to the vegetation.
Vegetation to be retained will be clearly identified. Each tree or groups of
trees to be retained shall be investigated at the appropriate time by an
Ecologist/Arborist. Trees should be managed according to the Tree
Retention Guidelines in APPENDIX 1.

No site preparation shall occur outside nominated zones.

 

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 6

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.