Vegetation Management Plan

 

5 PREVENTION OF EROSION AND SEDIMENTATION

 

5.1 Site preparation shall occur in the following sequence; cutting, shearing of
felled vegetation and tub grinding.

5.2 Erosion & sediment control works shall be undertaken in accordance with
the Queensland Development Code - Draft Part 16: Erosion and Sediment
Control (Department of Local Government, Planning, Sport and Recreation
2002). Some issues to be considered include:

e Minimise the area of disturbance;

. Perimeter bunds/cut-off drains designed to by-pass upstream
“clean” runoff around the works area;

° Retardation basins installed;

° Silt fencing, silt traps & sediment ponds established; and

e Stabilisation of steep batters/slopes.

5.3 The erosion and sediment control measures are not to be dismantled until
the disturbed areas have been covered by mulch to a minimum depth of
100mm.

5.4 Each zone is to be mulched immediately upon completion of clearing and
grubbing works.

5.5 As construction activities may impact on retained vegetation it is important
to ensure sediment fencing is in place before site preparation and other
earthworks commence. Prior to any site preparation operations the Project
Manager (or other suitably qualified personnel) shall undertake an
inspection of all sediment fencing.

5.6 Areas subject to works shall be _ re-grassed/re-vegetated/mulched
immediately upon completion of site preparation & grubbing works.

Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 8

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.