Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
fe 2 Vegetation Management Plan 10 MONITORING AND REPORTING 10.1 10.2 10.3 10.4 10.5 10.6 The Applicant shall appoint suitable Contractor(s) to undertake the clearing operations and, upon request by Council, the Applicant shall submit the appointed Contractor(s) previous work history for perusal. The Contractor shall monitor vegetation clearance, earthworks components and the above Performance Objectives of the proposed works on a continual basis to confirm that specific controls have been implemented and appropriate work practices are being adopted to achieve the specified performance objectives. The Contractor shall formally report to the Applicant on a weekly basis. The report will discuss the following: 1) Works undertaken; 2) Progress against stated objectives; 3) Compliance with Performance Objectives; 4) Significant problems encountered; 5) Success or failures of measures implemented to rectify previously identified problems; and 6) Measures to be taken to rectify new problems. Ouring clearing operations the Applicant shall report to Council on a monthly basis. The report will discuss the following: 1) Works undertaken; 2) Progress against stated objectives; 3) Compliance with Performance Objectives; 4) Significant problems encountered; 5) Success or failures of measures implemented to rectify previously identified problems; and 6) Measures to be taken to rectify new problems. The Applicant is responsible for periodic condition monitoring of all retained vegetation, with a maximum interval between inspections of one (1) month, addressing the health and vigor of all retained vegetation for one (1) year after the commencement of operational works. The Applicant is responsible for the submission of quarterly reports to Council addressing the health and vigour of all retained vegetation. In the opinion of Council, if any retained vegetation shows signs of decline or ill health the subject vegetation shall be removed immediately by the Applicant and at the Applicants expense. In the event of the need to remove retained vegetation within road reserves, the Applicant shall submit to Council an amended Streetscape Plan for approval detailing the proposed replacement plantings prior to the commencement of restoration works. Disturbed areas are to be inspected monthly for weed growth, with appropriate weed control measures implemented when warranted. No works shall commence until all vegetation to be retained has been clearly identified, and inspected by Council Officers. Q06030/AM/VMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.