Skip to the record
Search everything, all in one place.

Council archive · source document

07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242

of 112

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

vz

Vegetation Management Plan

APPENDIX 1 TREE PROTECTION GUIDELINES

Tree Retention Guidelines

The following procedures will ensure that retained trees adjacent to development
areas will survive construction works and will remain in a healthy condition. The
procedures will also ensure that any activity taking place within the drip line of any
retained tree will not significantly impact on the survival of the tree.

In order to protect significant trees, the following procedures are to be followed:

1.

Identifying a Tree Protection Zone: All retained trees likely to impacted
upon by development works will be marked prior to construction works. The
size and shape of a particular protection zone will vary according to
individual tree species. The zone will be determined by an Arborist prior to
commencing the project and will remain in place until project completion.

Pruning: Prior to establishing a tree protection zone, trees to be protected
will be pruned focusing on removal of dead or broken branches: The
purpose of this activity is primarily safety, but it serves as a monitor for any
damage that may occur during construction. Construction contractors are
prohibited from undertaking any additional pruning as this activity, if not
performed properly, can be harmful to the tree.

Establishing the Tree Protection Zone: The following measures will be taken
to protect the tree in the long term:

. Fencing - Secure posts with 1.8m high chain link or equivalent sturdy
fencing to be erected, maintained and removed by the Contractor to
the outer edges of the protection zone.

° Trunk protection - 1.8m high palings strapped to the trunk

° Mutching - 100 mm of composted mulch cover over the ground within
the tree protection zone in order to retain soil moisture and
encourage microbial activity.

. Irrigation - natural moisture levels should be maintained.

Drainage - the natural drainage patterns around the root zone should
not be altered.

. Signage - as follows:

Tree Protection zone

No vehicle movement

No storage of building materials

No washing of equipment

Contact name and number for enquires

4. Activities Within the. Tree Protection Zone: \f during the course of a

Project, it becomes unavoidable for activities to take place inside the
protection zone, then consent should first be gained from a qualified
arborist. Such activities may include the erection of scaffolding, vehicle
movement, trenching or excavation. An arborist can determine whether it is
appropriate to undertake that activity and advise of the most appropriate

 

Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 15

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.