Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
vz Vegetation Management Plan APPENDIX 1 TREE PROTECTION GUIDELINES Tree Retention Guidelines The following procedures will ensure that retained trees adjacent to development areas will survive construction works and will remain in a healthy condition. The procedures will also ensure that any activity taking place within the drip line of any retained tree will not significantly impact on the survival of the tree. In order to protect significant trees, the following procedures are to be followed: 1. Identifying a Tree Protection Zone: All retained trees likely to impacted upon by development works will be marked prior to construction works. The size and shape of a particular protection zone will vary according to individual tree species. The zone will be determined by an Arborist prior to commencing the project and will remain in place until project completion. Pruning: Prior to establishing a tree protection zone, trees to be protected will be pruned focusing on removal of dead or broken branches: The purpose of this activity is primarily safety, but it serves as a monitor for any damage that may occur during construction. Construction contractors are prohibited from undertaking any additional pruning as this activity, if not performed properly, can be harmful to the tree. Establishing the Tree Protection Zone: The following measures will be taken to protect the tree in the long term: . Fencing - Secure posts with 1.8m high chain link or equivalent sturdy fencing to be erected, maintained and removed by the Contractor to the outer edges of the protection zone. ° Trunk protection - 1.8m high palings strapped to the trunk ° Mutching - 100 mm of composted mulch cover over the ground within the tree protection zone in order to retain soil moisture and encourage microbial activity. . Irrigation - natural moisture levels should be maintained. Drainage - the natural drainage patterns around the root zone should not be altered. . Signage - as follows: Tree Protection zone No vehicle movement No storage of building materials No washing of equipment Contact name and number for enquires 4. Activities Within the. Tree Protection Zone: \f during the course of a Project, it becomes unavoidable for activities to take place inside the protection zone, then consent should first be gained from a qualified arborist. Such activities may include the erection of scaffolding, vehicle movement, trenching or excavation. An arborist can determine whether it is appropriate to undertake that activity and advise of the most appropriate Q06030/AM/VMP/RWS JAMES WARREN & ASSOCIATES PTY LTD 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.