Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Hg 2 Elf Skink Management Plan 1 INTRODUCTION 1.1 Background James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates Pty Ltd to prepare an Elf Skink Management Plan (ESMP) for the proposed development site at Eenie Creek Road, Noosaville (FIGURE 1). This plan will focus on the Elf skink (Eroticoscincus graciloides) and its associated habitat. The subject site forms part of land envisaged to be developed as the Noosa Shire Business Centre (NSBC). Stage 1 of the NSBC occurs immediately to the east of the subject site and is currently under development. A number of fauna surveys and management plans were completed as part of the Stage 1 development process and which are relevant to this ESMP. These include: e WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment Study; e WBM Oceanics (2002) - Elf Skink Survey and Habitat Assessment within the Noosa Shire Business Centre and Noosa Shire; “« URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre Environmental Management Plan; e URS Australia Pty. Ltd. (2003a) - Elf Skink Management Plan; e URS Australia Pty. Ltd. (2003b) - Concept Stormwater Management Plan; e« James Warren and Associates (James Warren) (2004) - Fauna Assessment (Planning and Environment Court report for Appeal no. 48 of 2003); and « Place Environmental (Jason Richard) (2004) - Assessment of Fauna and Fauna Habitat Issues (Planning and Environment Court report for Appeal no. 48 of 2003). The Elf skink is listed as Rare under Schedule 4 of the Queensland Nature Conservation (Wildlife) Regulation 1994 (NCWR). 1.2 Site Description The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded by Eenie Creek Road to the north, industrial development to the west, Eenie Creek to the south and Stage 1 of the NSBC to the east. The subject site is approximately 21.97 hectares (ha) in area. The topography of the subject site is slightly undulating and generally slopes to the south towards Eenie Creek. Numerous depressions occur throughout the site, particularly within the lower-lying areas to the south. A drainage lines occurs within the eastern portion of the site, which joins to a drainage line within Stage 1 of the NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at RL 2.8 m level (URS 2006). After prolonged rainfall, ponding of water occurs within depressions along the drainage line, predominantly below Q100 (URS 2003b). A small constructed dam is located in the central portion of the site. Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.