Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
HE 2 ELf Skink Management Plan 3 MANAGEMENT OF ELF SKINK AND HABITAT 3.1 Introduction This section provides a detailed management strategy for Elf skinks and their habitat at the subject site. 3.2 Management Strategies The following management strategies are proposed to minimise the potential impacts to Elf skinks from the proposed development and to ensure the long-term survival of this species (i.e. maintenance of a viable population) within the subject site. 3.3 Habitat Retention 3.3.1 Objective To maintain suitable habitat for Elf skinks within designated Open Space areas. 3.3.2 Background & Management Strategies 3.3.2.1 Introduction Maintenance of suitable habitat for Elf skinks is essential for their continued persistence within the subject site. Of particular importance to Elf skinks is the quality of microhabitat available, such as good shelter sites (e.g. fallen logs and deep leaf litter). 3.3.2.2 Retained Habitat Management Some habitat for Elf skinks will be lost to the development including the northern and western portions of the subject site and an area in the southern portion (i.e. 48%). However, a large area of habitat will be retained within designation Open Space areas (02 and O04 under MP2) within the southern and eastern portions of the subject site (approximately 9.82 ha). This area includes the entirety of the drainage line below the constructed dam. In addition, designated Open Space within the NSBC to the east adjoins this habitat. Open Space will be retained in a near natural state (subject to the construction of fire management trails) and will be enhanced with additional shelter sites sourced from clearing works in adjacent vegetation, i.e. logs will be placed within Open Space areas to provide additional shelter sites. 3.3.3 Management Actions Retained habitat will be managed according to the Open Space Management Plan (JWA 2007a). The following management actions are included in this document: Q06030/AM/ESMP/RW5 JAMES WARREN AND ASSOCIATES 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.