Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
e INTEGRATED PLANNING ACT 1997 Pait E, Version 2.0, 4 October 2004 Form 1 Development Application Operational &/or building work ke\'\— assessable against a local government's planning scheme i Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme. Nature of the application 1. This application is for (tick one (1) or both if appficable) A development permit authorises Preliminary approval - provide details of F work rh, development to occur, white a pretminary O eat app Provide details of the type of work eg. roadwork, stormwater, water and sewerage approval is a step in the approval process ; and does not authorise development to occur. [ The types of work that are assessable against! a planning scheme are determined by the AND / OR sen vary fs 8 parbeulat local goverment and & Development f permit - provide defails of the type of work eg. roadwork, stormwater, water and sewerage To determine the types of work that are - > — assessable under a particular planning [ a D Sr€, wre Liver , cewik scheme, contact the relevant local 7 ¥ ~ govemment. 2. Are the works subsequent to a previous development approval? (no [KI YES - provide details of all previous approvals (e9. file references) [ 2006/1594 3. _ Is the subdivision for a canal estate? mae) (yes ree Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal? applicable} YES - Prior to issuing a development permit for the O ES - complete 05 works, the assessment manager is required TINO - 05, 6&7 do not apply by law to “sight” an approved form, issued by Qleave, which signifies that the PLSLtevy (5. Has the PLSL levy been paid? has bet id. as Deen par (YES - completeas [NO - the applicable fevy must be paid before @ development permit can be given for the works 6. How much was paid? 7. Whatis the receipt number of the payment? L | PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (appiicabie fo assessment manager) DATE RECEIVED REFERENCE | NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.