Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242

of 112

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Fauna Management Plan

 

2 PROGRAM OF WORKS

In order to ensure the most suitable ecological outcome and to ensure that possible
impacts on wildlife, especially Wallum froglet, Green-thighed frog, Koala, Glossy
black cockatoo, Elf skink and Cooloola blind snake are minimised, it is
recommended that the commencement of site work takes place in accordance with
the fotlowing;

. Selective clearing shall be employed within the site, whereby smaller non-
habitat trees are initially removed followed by the removal of any
identified habitat trees at a later time;

° A pre-clearing survey will be completed for significant fauna involving
spotlighting and pitfall trapping;

° Selective clearing will commence in the northern portion of the site and
will continue in a southerly direction. The timing and direction of
selective clearing will provide a disturbance stimulus to move wildlife into
areas of retained vegetation; and

. Comprehensive protection measures are detailed in this FMP to ensure
that the risk of injury to fauna is minimised and to ensure correct
management of significant species.

Vegetation will be retained within Open Space Areas in accordance with the Open
Space Management Plan (OSMP) (JWA 2007) as follows:

Open Space (Conservation and Waterway Protection):

The OS2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency
vehicles and Council maintenance vehicles. All unnecessary existing tracks and
trails will be closed off and rehabilitated and vehicle access points will be limited
to as few as possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created
within this area to provide access for fire fighting vehicles and to ensure
compliance with bushfire management objectives. This fire break will have a
minimum width of ten (10) metres, which will involve the clearing of all
vegetation. Other fire breaks will be created within this Open Space area, however
these will require the clearing of vegetation to a four (4) metre width. The location
of all fire breaks will take into account the requirement to retain habitat trees,
where possible.

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 4

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.