Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Fauna Management Plan 2 PROGRAM OF WORKS In order to ensure the most suitable ecological outcome and to ensure that possible impacts on wildlife, especially Wallum froglet, Green-thighed frog, Koala, Glossy black cockatoo, Elf skink and Cooloola blind snake are minimised, it is recommended that the commencement of site work takes place in accordance with the fotlowing; . Selective clearing shall be employed within the site, whereby smaller non- habitat trees are initially removed followed by the removal of any identified habitat trees at a later time; ° A pre-clearing survey will be completed for significant fauna involving spotlighting and pitfall trapping; ° Selective clearing will commence in the northern portion of the site and will continue in a southerly direction. The timing and direction of selective clearing will provide a disturbance stimulus to move wildlife into areas of retained vegetation; and . Comprehensive protection measures are detailed in this FMP to ensure that the risk of injury to fauna is minimised and to ensure correct management of significant species. Vegetation will be retained within Open Space Areas in accordance with the Open Space Management Plan (OSMP) (JWA 2007) as follows: Open Space (Conservation and Waterway Protection): The OS2 (Conservation and Waterway Protection) area is to be retained in a near- natural state, therefore limited infrastructure is required within this area. Some clearing of vegetation may be required for fire trails/breaks. Public access to Eenie Creek will not be encouraged. Walking tracks and jetties will not be constructed. Playground and picnic facilities, rubbish bins and other facilities associated with recreational parkland will not be provided. Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles. All unnecessary existing tracks and trails will be closed off and rehabilitated and vehicle access points will be limited to as few as possible. The Fire Management Plan (JWA 2007) recommends that a fire break be created within this area to provide access for fire fighting vehicles and to ensure compliance with bushfire management objectives. This fire break will have a minimum width of ten (10) metres, which will involve the clearing of all vegetation. Other fire breaks will be created within this Open Space area, however these will require the clearing of vegetation to a four (4) metre width. The location of all fire breaks will take into account the requirement to retain habitat trees, where possible. Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.