Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
op Fauna Management Plan 4 4.1 FAUNA MANAGEMENT Introduction This section outlines the recommended measures to minimise potential impacts on fauna. Measures to minimise adverse impacts on fauna include: Identification of potential fauna habitat trees (e.g. stags or hollow- bearing trees); Demarcation of habitat trees and vegetation to be retained; Relocation of identified significant fauna within habitat to be removed, if necessary; Instructions to site preparation Contractors/Site Managers; Spotter-catcher (fauna rescue) measures during site preparation operations; and Fauna management prior to, during and .following site preparation operations. Additional recommendations for the use of felled timber, retention of conservation areas and reporting procedures are proposed. 4.2 General Management Actions 4.2.1 4.2.2 The Queensland Nature Conservation Act 1992 requires that protected animals whose habitat has been or is about to be destroyed by human activities or natural disasters are cared for and _ rehabilitated. Compliance with the Act will be required. Prior to the commencement of the selective clearing works, a fauna survey will be completed within the areas to be cleared. The fauna survey program will consist of pre-dawn spotlighting for Koalas and Glossy black cockatoos on the day prior to clearing and pitfall trapping for Elf skinks, Cooloola blind snakes, Green-thighed frogs and Wallum froglets for four (4) nights prior to clearing. The survey methodologies will include the following: e Targeted surveys for Koalas will be completed at pre-dawn of the day before site preparation is to commence. This will include two (2) experienced observers spotlighting for a minimum of two (2) hours. Trees in which Koalas are sighted shall be flagged with tape. Call playback may be utilised, if required; e =6Pitfail trapping for significant amphibians and reptiles will be completed for four (4) days prior to the commencement of clearing operations. This will include the erection of two (2) trap-lines consisting of six (6) buckets each, for a total of forty-eight (48) trap-nights. Each bucket shall be placed five (5) meters apart and drift nets set between each bucket. Location of the trap-lines will Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.