Fauna Management Plan

 

4.2.9

4.2.10

4.2.11

4.2.12

4.2.13

4.2.14

4.2.15

4.2.16

4.2.17

4.2.18

then be relocated to a suitable place, determined in consultation with
QPWS and the hollow end unblocked at an appropriate time of day to
minimise fauna predation.

Prior to tree removal, an appropriately qualified ecologist should
attempt to “flush out” any denning or nesting animals not observed
during the initial hollow inspection. This may involve hitting target trees
with a sledgehammer or another similar technique.

Following felling, a second inspection of the relevant trees shall be
carried out to relocate fauna disturbed by the clearing process or
remaining within the felled timber to a suitable location determined in
consultation with QPWS.

Where possible, the actual felting of the habitat trees should be
completed in a manner that will maximize the chances of survival for
any fauna remaining within the tree hollows. This will involve pushing
rather than cutting, and cushioning the tree fall with other felled timber
and foliage.

All injured animals shall be immediately removed and taken to an
appropriately qualified veterinary surgeon.

Following completion of the selective clearing stage, capture and
release records will be supplied to the Project Manager for
dissemination to QPWS, where required. A copy of these records, if
requested, shall be supplied to Council.

No unrestrained dogs shail be permitted on site during construction.

Buildings, roads and fences shalt be sited and constructed to allow
movement of fauna through and within the site. These structures would
be constructed in consultation with an Ecologist, where necessary, to
determine the most appropriate location and design that maximises the
retention of fauna movement through and within the site.

Fauna friendly fences (e.g. posts and rails) shall be located at the
interface of the development envelope and alt areas of retained
vegetation. They must be of a form that does not impede fauna
movement along areas of retained vegetation, such as a minimum gap of
150 mm below the bottom rail, and which does not exceed 1.2 metres in
height, should achieve this objective. Wire mesh type fences (if utilised)
must contain a top rail, while strand wire or split rail type fences should
have a minimum spacing between wires/rails of 300 mm. Lockable gates
shall be provided at all vehicle maintenance access points.

Further detail on fauna friendly fence design is shown in APPENDIX 1.
Plant species used in landscaping and revegetation works shall be

selected to provide food and habitat for local fauna (e.g. Allocasuarina
spp. for Glossy black-cockatoos; Banksia spp. for honeyeaters etc.).

 

Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 9

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1242 - Op Works - Roads & Drainage, W&S [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.