Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
p Fauna Management Plan 5 5.1 5.2 5.3 5.4 PEST SPECIES MANAGEMENT Pest animal control measures, where necessary, shall be completed using suitable and appropriate strategies as employed elsewhere within the Shire. Unrestrained dogs shalt not be allowed on the site during construction. All. stormwater treatment and sediment control devices shall be designed and managed so they do not create breeding habitat for mosquitoes and Cane toads (Bufo marinus) (e.g. ponds of standing water). A Stormwater Management Plan will be prepared for the proposed development and will include strategies to address this issue. Construction activities shall be carried out in such a way so as to prevent the creation of ponded or standing water, which would result in breeding habitat for mosquitoes and Cane toads. Q06030/AM/FMP/RW5 JAMES WARREN & ASSOCIATES PTY LTD 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.