Council archive · source document
07/1242 - Op Works - Roads & Drainage, W&S [As Published] · 142007.1242
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ae cP Public Open Space Management Plan 1 INTRODUCTION 1.1. Background James Warren and Associates (JWA) have been engaged by Ken Hicks & Associates Pty Ltd, on behalf of S & L Developments Pty Ltd, to prepare a Public Open Space Management Plan (POSMP) for a proposed development at Eenie Creek Road, Noosaville (FIGURE 1). The subject site forms a part of land envisaged to be developed as the Noosa Shire Business Centre (NSBC). The development of the NSBC site is to be guided by Master Plan 2 (MP2), which was developed after seven (7) years of town planning. Stage 1 of the NSBC occurs immediately to the east of the subject site and is currently under development. 1.2 Aim The aim of this POSMP is to direct the management of Public Open Space areas within the proposed development. Public Open Space areas designated under MP2 include: ¢ QS2 (Conservation an Waterway Protection) in the southern portion; and ¢ 054 (Environmental Drainage and Conservation) in the central portion. 1.3 Site Description The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on RP215933, Parish of Tewantin, Shire of Noosa. The site is bounded by Eenie Creek Road to the north, industrial development to the west, Eenie Creek to the south and Stage 1 of the NSBC to the east. The subject site is approximately 21.97 hectares (ha) in area. A child-care centre and other associated built infrastructure occurs within the northern portion of the site. In addition, numerous vehicle tracks occur throughout the site. 1.4 Topography and Aspect The topography of the subject site is slightly undulating and slopes at 1.5% to the south towards Eenie Creek. The site is of low elevation occurring at RL 13.0 m in the north and falling to RL 1.5 m at Eenie Creek. Numerous depressions occur throughout the site, particularly within the lower-lying areas to the south. A drainage line occurs within the eastern portion of the site, which joins to a drainage tine within the NSBC to the east, below the Qi00 Average Recurrence Interval (ARI) level at RL 2.8 m level (URS 2006). Q06030/AM/POSMP/RW5 James Warren & Associates Pty Ltd 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1242 - Op Works - Roads & Drainage, W&S [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.