2009/134
2. The applicant shall obtain approval of the revised site plan, drawing 477-01A dated 7 May
2009, from Marine Safety Queensland prior to the commencement of the construction of the
works.
3. All structures associated with the jetty and pontoon must be constructed wholly within the
approved Resource Entitlement Area.
4. The structures shall be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall or rock wall.
5. A rigid handrail shall be fitted to at least one side of the fixed section of the jetty.
6. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
7. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
8. The jetty shall be constructed in a manner to render the underside area vermin proof.
9. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
10. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
11. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
12. Boat repair activities are not permitted on site.
13. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
14. The mooring facility shall not be utilised for live-aboard purposes.
15. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
16. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. Any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does it absolve the owner of the land from complying with all the conditions of this approval
and/or relevant Council By-Laws and Policies and/or relevant statutes and/or statutory
regulations in the execution and/or performance of said works. Council does not accept any
responsibility for the accuracy of such plans and specifications as approved.
17. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council prior to the return of any bond monies held by Council. The certification shall state that
the jetty, gangway and pontoon have been constructed in accordance with best practice
methods, are in accordance with Coastal Protection and Management Act 1995, are
structurally sound and will have no detrimental affect on the existing revetment walls.
18. A final inspection and approval of the structure by Council’s Inspector is also required prior to
the return of any bond monies held by Council. Please contact Council’s Operational Works
Assessment Section to arrange the inspection.
19. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
20. The Development Permit for Operational Works lapses if the works have not been completed
by 2 June 2011, unless an application to extend the relevant period is approved by Council.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AA7F0.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2009.00000134.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.