Prescribed Tidal Works Request for Comments · OPW10/2184
6. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
7. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
8. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe
access to or from neighbouring structures.
9. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
jetty must not exceed the following sizes:
Wet Berth Dry Berth
Length Overall - 5 metres N/A
Beam - 2 metres
10. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Prescribed Tidal Works Request for CommentsRelated documentApplication case desk ↗
About this file
- File size
- 346 KB (small file)
- File type
No other editions are linked here.