15 October 2013

SARA at DSDIP
Mike Ahern Government Building
12 First Avenue
MAROOCHYDORE QLD 4558


Attention: Tracey Smith

Dear Tracey


RESPONSE TO INFORMATION REQUEST – SDA-0913-004403
4 RUSSELL STREET, NOOSAVILLE, QLD

Further to the information request dated 20 September 2013, please find following additional
information as required.


Item 1.
Please provide further details or information of the public safety or permanent structures that
required protection from coastal erosion at this location (Specifically, SDAP Module 10: PO3;
PO5; PO 8).

The Noosa River Holiday Park, located at 4 Russell Street Noosaville, is Queensland State
Government owned land with Sunshine Coast Council acting as trustee. The park is adjacent
to a public picnic area and the foreshore is accessible by both guests of the caravan park and
the general public.

As seen in the photographs previously submitted, the embankment adjacent to the caravan
park had become considerably unstable and at imminent risk of further collapse. Safe public
access to the foreshore could not be guaranteed without immediate works to stabilise the
embankment.

The works undertaken by Sunshine Coast Council prevent further erosion and reduce the
likelihood of injury due to embankment collapse to members of the public who access this area.


Item 2.
Please provide further details or information to demonstrate that the coastal protection work
undertaken was the only feasible option to address the threat at this location, including
justification why:
       • Other considered options were not feasible
        • Permanent structures could not be abandoned or relocated
        • Nourishment (in whole or part) was not adopted as the preferred means of controlling
        erosion at this location
        • Coastal hazard risk is not increased elsewhere as a result of the works (i.e. how the
        “end” effects of the sandbag will have been addressed or will be managed.
Full text of the other 1 page

Page 2

Further to correspondence between the Department of Environment and Heritage Protection
and Sunshine Coast Council dated 19 April 2013 (email from R. Garner to D. Shing), the
coastal protection work undertaken at this location was completed under emergent works in
accordance with Section 585 of the Sustainable Planning Act 2009 due to the imminent threat
to public safety as a result of erosion of the foreshore embankment. The sandbags are
considered by Council to be a temporary installation to maintain safe public access in this
location and Sunshine Coast Council will seek to implement a more permanent engineered
solution in a timely manner.

The provision of sandbags was considered to be the most appropriate option available as
sandbags could be installed in a timely manner to reduce the risk to public safety. Other
options, including nourishment, were not considered feasible due to the immediate need to
resolve the situation.

We trust the above addresses the request for information. We look forward to the approval
accordingly.


Please feel free to contact the undersigned should you have any queries.

Yours faithfully




AMY TURCO
Civil Engineer

CC: David Shing – Sunshine Coast Council

Used in these records

About this file

File size
741 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

103-096-004L-SARA.pdf · 741 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.